Home additions & ADU
Kitchen remodeling
Bathroom remodeling
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Wellborn Home Additions & ADU: The San Francisco Owner’s Guide
We build and install Wellborn-compatible home additions and ADUs in San Francisco, and a typical detached or attached addition here runs $53,100 – $153,400 depending on square footage, foundation type, and whether you’re carving into a hillside lot. A full ADU build lands between $106,200 and $259,600, and a garage conversion sits at $35,400 – $94,400. Homeowners usually call us when a planned addition has stalled: a permit set that came back with structural comments, a designer’s drawings that never matched the reality of a 25-foot-wide lot, or a prior contractor who vanished after the foundation pour.
This isn’t a parts page in the light-fixture sense. Wellborn cabinetry and millwork are the most common product spec we see inside San Francisco additions, and the “failed part” here is usually a whole scope that needs to be re-scoped, re-priced, and finished right. If you need a vendor for Wellborn cabinetry, we’re an independent service provider and not affiliated with Wellborn; we order their product through authorized channels and install it to spec inside the addition.
Key Takeaways
- Wellborn-compatible additions in San Francisco: $53,100 – $153,400 installed.
- ADU construction: $106,200 – $259,600. Garage conversions: $35,400 – $94,400.
- Every project carries the 730-Day Done Right Promise, in writing.
- Live person answers the phone 24/7 at (866) 320-2646.
Which Wellborn Models This Applies To
Wellborn makes cabinetry across several series, and the series you choose drives the box construction, door style, and finish compatibility inside a weather-variable San Francisco climate. Their natural-wood and painted finishes behave differently near the fog belt versus the sun belt, and that’s before you factor in the interior humidity an ADU with its own bath and laundry introduces. When we spec Wellborn for an addition, we confirm the series from the door-front sample the owner already has, the drawer-guide label inside the box (Wellborn stamps the series and finish code on the inside of the drawer box), and the measurement of the cabinet run against the wall it’s going into.
The OEM-versus-aftermarket decision here is less about a single part and more about finish continuity: if you’re adding cabinetry flanking an existing Wellborn setup, matching the exact series and finish code is the difference between a seamless kitchen and a visible two-tone seam no buyer will ignore. If you can’t source the original spec, a quality custom millwork shop is the honest alternative, and we’ll tell you when that’s the right call rather than forcing a mismatch.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your Wellborn Home Additions & ADU Is Failing
- Permit comments you can’t read. San Francisco Planning and Building Inspection comment sets often come back with structural or egress notes that only a builder can translate into drawings and a schedule.
- A contractor went quiet after mobilization. The foundation is poured, the framing is up, and the phone stopped getting answered. That’s the most common “failed part” we see on stalled additions.
- Moisture at a new-wall seam. Improper flashing and drainage detail where an addition meets the existing house lets San Francisco fog push water into the joint. This shows up as a stain on interior drywall within the first two wet seasons.
- Doors that don’t close flush after a year. That’s usually a foundation or framing settling issue, not a door defect, and it needs a structural look before it’s cosmetic.
- A bid that changed three times mid-project. Change orders stacking up fast is a sign the original scope was vague. It’s exactly the pattern our upfront pricing is built to prevent.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included
Here’s what San Francisco additions and ADUs actually run through us, installed:
- Home Addition: $53,100 – $153,400
- ADU Construction: $106,200 – $259,600
- Garage Conversion: $35,400 – $94,400
What drives the range: lot slope and foundation complexity, whether the addition needs its own utility trench back to the main, seismic upgrade requirements on older San Francisco housing stock, and the finish level you choose. Wellborn cabinetry inside an ADU kitchenette or addition adds cost on top of the structural and envelope scope. We quote parts and labor as separate line items so you can see exactly what’s materials and what’s trades. The 730-Day Done Right Promise covers workmanship on every project.
DIY or Call Us?
An owner can responsibly pull permits, read the drawings, and manage the schedule if they have genuine construction experience. What they can’t safely do is structural framing, foundation work, gas-line work for an ADU kitchen, or a solar-ready electrical panel upgrade. Those are dangerous and regulated, and San Francisco requires licensed trade work and inspection sign-off for each. Attempting framing or gas work without a license puts your insurance and your permit at risk, and no honest builder will sign off on an inspection they didn’t personally dry-in.
Start with a call to (866) 320-2646 for a free project estimate and design consult. We’ll tell you honestly whether your stalled addition can be completed by a new contractor or needs a fresh scope.
FAQs
A typical permitted addition runs 4 to 8 months from permit approval to final inspection, with 2 to 4 months of planning and permit review before that. San Francisco’s planning timelines vary by district and complexity, and we’ll give you a realistic schedule during the free estimate.
Call (866) 320-2646 for a project-specific timeline.
Often yes. If the foundation and framing are sound and the permit is still active, we can take over the existing scope and complete it. If the framing was open to weather or the permit has expired, a partial rebuild is the safer path.
Call (866) 320-2646 for a site walk and honest verdict before you commit to either.
Yes. We pull permits for every addition and ADU and coordinate planning and building inspection sign-off as part of the contract. Permit fees are a line item in your quote, not a surprise later.
We order Wellborn through authorized supply channels and install to the manufacturer’s spec. We’re an independent provider, not affiliated with Wellborn, and we source their series and finishes exactly as specified in the drawings.
Questions about your cabinetry spec? Call (866) 320-2646 and we’ll walk through it.
If you’re planning a Wellborn-compatible home addition or ADU in San Francisco, call Groundwork Construction Co. of San Francisco at (866) 320-2646 for a free estimate and design consult. Our technicians bring up to 12 years of experience, we answer the phone live 24/7, and every project is covered by our 730-Day Done Right Promise. From foundation to finish line, we build it to last and we back it in writing.
Written by the team at Groundwork Construction Co. of San Francisco, serving San Francisco and nearby areas.