Home additions & ADU
Kitchen remodeling
Bathroom remodeling
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Cambria Home Additions & ADU: The San Francisco Owner’s Guide
Cambria-quartz-finished home additions and ADUs in San Francisco typically run $53,100 – $153,400 for a permitted addition and $106,200 – $259,600 for a full ADU build, and we scope, permit, and schedule each one around your property, not a template. We’re an independent contractor and not affiliated with Cambria; we build with Cambria surfaces because owners ask for the brand by name. Most owners land here sideways: a quote from another builder says “Cambria upgrade” without a model number, a finish sample doesn’t match the slab in the showroom, or a decades-old addition in the Sunset is showing settled corners and the owner wants a Cambria-clad rebuild they can actually spec correctly.
Which Cambria Models This Applies To
This isn’t a mechanical part with a serial plate. When an owner asks us to “match the Cambria part” for an addition or ADU, they mean the finish schedule: which Cambria quartz line goes on the kitchen island, the ADU bath vanity, the laundry counter, and the exterior bar top. Cambria quartz is a manufactured surface sold by design line (the Brittanicca, Ella, Torquay, and similar families), and each line carries a limited set of thicknesses (most commonly 2 cm and 3 cm) and slab dimensions. The compatibility gotcha that trips owners: an ADU kitchenette counter needs a slab wide enough to span the run without a visible seam, and a 2 cm slab that reads fine on a 24-inch vanity looks thin against a 3 cm main-house counter. Bring the model name from the showroom tag or the fabricator’s sample card, plus your room dimensions, and we spec against both.
OEM versus aftermarket doesn’t apply here the way it does to a garage-door opener. Cambria quartz is the material itself, sourced through authorized slab distributors. What varies is the fabrication and install quality: edge profile, seam placement, and whether the templating happens after cabinets are set. Cambria is one of our curated brand partners alongside KraftMaid cabinetry, Silestone, and Kohler, and we specify it because the material will not need re-sealing the way some natural stone does in the Bay Area’s marine air.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your Cambria Home Additions & ADU Is Failing
- Corners out of square in the addition. Older San Francisco additions, especially infill work on sloped lots, settle and rack. A Cambria counter templated against a racked wall shows uneven reveal at the backsplash. The fix is re-templating after framing is corrected, not shimming the slab.
- Visible seams opening at the island. Seams move when the substrate flexes. On an ADU kitchenette, an under-built cabinet run or a missing support rail lets the top deflect. A 1/16-inch seam gap that widens over a season points to the base, not the quartz.
- Cloudy or dull patches on the surface. Cambria quartz resists staining, but abrasive cleaners and hard-water film from Peninsula and Sunset fog condensation leave haze. This is a maintenance issue, not material failure.
- Water intrusion at the slab perimeter. On an exterior ADU bar top, failed caulk at the wall joint lets rain wick behind the counter. Repeated wet-dry cycling in San Francisco’s damp, salt-laden air degrades the joint faster than inland climates.
- ADU counter height out of code spec. A converted garage ADU with an old slab floor means the finished floor sits lower than the main house, throwing counter height off the standard 36-inch range. We check floor-to-counter height before templating.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included
San Francisco quartz-on-addition and ADU pricing splits into two buckets. For the build itself, a home addition runs $53,100 – $153,400 and a full ADU runs $106,200 – $259,600; a garage conversion runs $35,400 – $94,400. If you’re only replacing the Cambria surfaces within an existing addition, countertop installation is $2,360 – $7,670 and a kitchen island top is $3,540 – $11,800.
What drives the range: slab area and seam count, edge profile complexity, ADU utility rough-in and permit fees, and site access on narrow San Francisco lots where a slab has to be hand-carried. Every quote is line-itemed and fixed, with the number you see being the number you pay. Our 730-Day Done Right Promise covers the workmanship; if it’s not done right, we make it right. Financing is 0% for 18 months, with $1,000 off projects over $10,000.
DIY or Call Us?
Here’s the honest split. You can safely check cabinet level and square with a 4-foot level, confirm your Cambria model name from the showroom tag, and photograph any seam or perimeter gaps for a quote. What you should not attempt: templating or installing a quartz slab, cutting Cambria, or roughing in ADU plumbing and electrical. Quartz slabs run heavy (a 3 cm panel can exceed 300 pounds), and cutting or lifting one without proper rigging risks serious injury to your hands and back. Electrical rough-in and gas line work in an ADU are permit-and-license territory; those parts of a project are dangerous to do yourself and belong with a trained, licensed professional. We pull permits and pass inspections as part of the scope.
Call (866) 320-2646 and a live person answers, day or night, to schedule a free estimate and design consult.
FAQs
How long will a Cambria addition or ADU take? A permitted San Francisco home addition typically runs 4 to 6 months from permit to final walkthrough; a full ADU runs 6 to 9 months, and a garage conversion runs 3 to 5 months. Timelines depend on plan-check turnaround and inspection scheduling. Call (866) 320-2646 for a project-specific schedule.
Can a failing Cambria surface be repaired instead of replaced? Often, yes. Seam separation and perimeter caulk failure are repairable without a new slab; a cracked or heat-damaged panel usually needs replacement. We assess on site before quoting a full swap. Call (866) 320-2646 for a free evaluation.
How long does chipping out and resetting a Cambria counter take? A standard counter reset in an existing addition takes 1 to 2 days once the replacement slab is fabricated. ADU builds are scheduled as part of the larger project. Call (866) 320-2646 to lock a date.
How do you source the right Cambria match? We spec against your model name and dimensions through authorized slab distributors, then fabricate. Bring your sample card or showroom tag and we match the line, thickness, and edge. Call (866) 320-2646 to start a free estimate.
Call (866) 320-2646 to schedule your free estimate for your Cambria home addition or ADU in San Francisco. Our technicians have up to 12 years of experience, arrive background-checked and in uniform, and every San Francisco project is backed by the 730-Day Done Right Promise, from foundation to finish line.
Written by the team at Groundwork Construction Co. of San Francisco, serving San Francisco and nearby areas.