Home additions & ADU
Kitchen remodeling
Bathroom remodeling
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Delta Home Additions & ADU: The San Francisco Owner’s Guide
We build Delta home additions and ADUs in San Francisco, and a full addition typically runs $53,100 – $153,400 installed, while a detached or attached ADU lands between $106,200 and $259,600. This isn’t a part that fails overnight. Owners usually discover the problem slowly: a ceiling stain after the first big rain, a floor that squeaks in one hallway and not the other, a bedroom that never quite heats or cools like the rest of the house, or a contractor who walked off the job and left a half-finished frame. By the time you’re searching, the failure has been showing for months.
We’re an independent San Francisco construction company and we’re not affiliated with Delta, but we know how these systems are spec’d and where they break down in San Francisco’s fog belt and older housing stock.
Key Takeaways
- Full home additions in San Francisco: $53,100 – $153,400 installed. ADUs: $106,200 – $259,600. Garage conversions: $35,400 – $94,400.
- Delta systems are matched to your structure’s specs and load path, so the part or assembly has to fit your specific build, not a generic one.
- Most jobs take weeks, not hours. A home addition is a planned build, and we quote it that way.
- Every project we finish is covered by our 730-Day Done Right Promise, in writing.
Which Delta Models This Applies To
Delta builds to structural and dimensional specs that vary by product line and by the year your home’s addition or ADU footprint was originally dictated. That means the “part” you need isn’t universal. If you’re replacing a framing component, a connection, a panel, a window unit, or a roofing detail on a Delta-spec addition, you need to confirm three things before you buy anything: the model or series stamped on the original spec sheet or data plate, the physical measurements you take yourself at the opening or connection point, and the spec of the assembly around it.
Here’s the gotcha we see in San Francisco: many homes in the Sunset, Richmond, and Inner Parkside were built or added onto between the 1930s and 1950s, and their wall and roof assemblies don’t match what a modern Delta replacement part was designed around. A part that’s “Delta-compatible” on the box may fit the Delta product but not the structure it’s going into. Measure the actual opening, check the model label, and read the compatibility list on the part itself. When the OEM part is unavailable or backordered, a quality aftermarket equivalent from a reputable brand can do the job – but only if the spec matches on load rating, dimensions, and material.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your Delta Home Additions & ADU Is Failing
With additions and ADUs, “failing” usually means the structure or the systems inside it, not a single broken part. These are the symptoms that bring owners to us:
- Water stains on ceilings or walls after rain. Water is getting past the roof-to-wall junction or a flashing detail. Left alone, it rots framing and insulation.
- Floors that squeak or feel soft in one area. Subfloor deflection or moisture damage. It’s often a sign of a connection that wasn’t spec’d right when the addition went up.
- Doors and windows that stick or won’t close flush. The frame or the addition is moving. This can be settlement or a structural connection that’s coming loose.
- The addition is always cold or hot compared to the main house. Under-insulated walls, an undersized HVAC run, or gaps at the connection point to the original structure.
- Cracks along the seam where the addition meets the original house. Differential movement between the two structures. It’s cosmetic sometimes, structural other times, and a qualified inspection tells you which.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included
In San Francisco, a full home addition runs $53,100 – $153,400 and an ADU runs $106,200 – $259,600. A garage conversion runs $35,400 – $94,400. What pushes you toward the top of the range: foundation work on a sloped or sandy lot, bringing the electrical panel up to current code, a full bathroom and kitchen within the addition, and the permit and inspection load that San Francisco requires. What keeps you near the bottom: a simple footprint, no new plumbing, and a structure that ties cleanly into the existing build.
We quote line by line, in writing. The number you see is the number you pay. Every project is covered by our 730-Day Done Right Promise – if it’s not done right, we make it right.
DIY or Call Us?
You can safely check and document: take photos of the cracks, measure the openings, find the model label, note when the symptoms started, and check whether water is coming in at a specific point. What you shouldn’t do is cut into framing, move a load-bearing wall, or try to repair a structural connection yourself. Those are the jobs where the DIY version looks fine and fails two winters later, or worse, compromises the load path of the whole addition.
If you’re looking at water intrusion, structural movement, or an addition that was never finished right, the honest move is a professional inspection. Call us at (866) 320-2646 and we’ll get a free estimate on the table.
FAQs
How long does a Delta-compatible home addition or ADU last?
A well-built addition in San Francisco’s climate will last decades if the envelope is sealed and the roof detail is done right. The rear additions on older homes in this fog belt fail at the flashing and the roof-to-wall seam first, usually within 10 – 15 years if they were built with a weak detail. Call (866) 320-2646 for an inspection.
Can it be repaired instead of replaced?
Often, yes. Water intrusion, flashing, and insulation issues are frequently repairable without tearing down the addition. Structural and foundation problems are a different conversation and need a real assessment before you decide. Call (866) 320-2646 and we’ll tell you straight.
How long does the work take?
A home addition in San Francisco typically takes several weeks to a few months depending on permits, scope, and inspection timelines. This is planned construction, not a same-day fix. Call (866) 320-2646 for a realistic timeline on your project.
How do you source parts and materials?
We specify Delta-compatible materials and use verified brand partners across every trade, including KraftMaid, Cambria, and Silestone for interiors. We don’t carry stock – we source to your spec and confirm compatibility before anything ships. Call (866) 320-2646 to talk through what your project needs.
We build across San Francisco, from the Sunset to Bernal Heights, and we answer the phone with a live person, 24 hours a day.
Ready to get a real number? Call (866) 320-2646 for a free estimate and design consult. Our technicians have up to 12 years of experience, they’re background-checked and arrive in uniform, and every job comes with our 730-Day Done Right Promise. Ask about $1,000 off projects over $10,000 and 0% financing for 18 months.
Written by the team at Groundwork Construction Co. of San Francisco, serving San Francisco and nearby areas.