Home additions & ADU
Kitchen remodeling
Bathroom remodeling
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Therma-Tru Home Additions & ADU: The San Francisco Owner’s Guide
If you’re planning a home addition or ADU in San Francisco and want it matched to Therma-Tru-grade exterior doors and entry systems, expect an installed project in the $53,100 – $153,400 range for a home addition, with ADU construction running $106,200 – $259,600 and garage conversions $35,400 – $94,400. These are complex, permitted builds – nobody finishes one in a day – and that’s exactly why the entry and door package deserves real planning up front. We’re an independent service provider, not affiliated with Therma-Tru, and we plan, permit, and build these projects across San Francisco.
Owners usually land here after the same discovery: a Therma-Tru entry door, sidelite, or patio system on an existing structure shows a symptom they can’t ignore – a door that sticks in the frame, a threshold that’s letting water track in along a new slab, or weatherstripping that fails the first foggy season after an addition goes up. The part becomes the entry point to a bigger question about how the addition was detailed, framed, and flashed. That’s the conversation we have on-site.
Key Takeaways
- San Francisco home additions typically run $53,100 – $153,400 installed; ADUs $106,200 – $259,600.
- Door and entry failure on a new addition is almost always a flashing, threshold, or framing issue, not the door itself.
- Therma-Tru door systems are sized and specified by series – matching the right unit to the opening matters.
- Permits, inspection, and 730-Day Done Right Promise coverage apply to every project we build in San Francisco.
Which Therma-Tru Models This Applies To
Therma-Tru builds entry doors and door systems across several lines – Fiber-Classic, Smooth-Star, and the higher-end American Style and Classic-Craft collections – plus sidelites, transoms, and patio door systems. On an addition or ADU, the door package is usually spec’d as a unit: door slab, frame, threshold, and weatherstripping working together. Compatible exterior door packages on San Francisco additions typically slot into standard widths (36-inch entries are common, with sidelites adding width), and the rough opening has to be framed to the manufacturer’s spec – not the other way around.
To identify what you have, look for the Therma-Tru label on the door edge or hinge jamb (older units may have it on the frame), measure the rough opening and the door slab, and note whether the unit is fiberglass or steel. That label tells a supplier the series and lets us match a replacement or a spec for new construction without guessing. On OEM versus aftermarket for Therma-Tru specifically: OEM door systems and sidelites keep the warranty chain intact and match the original profile, while quality aftermarket thresholds and weatherstripping are fine for wear items. When the door leaf or frame itself has failed, we source OEM-compatible units. When it’s the seal or sweep, an equivalent works.
The compatibility gotcha on additions: a door that’s right for a retrofit is often undersized for a new framed opening, and widening a rough opening after the fact in a San Francisco addition means re-flashing and re-inspecting. Get the unit spec’d before framing, not after. We also work alongside KraftMaid, Cambria, and Silestone finishes on the interior side of these projects.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your Therma-Tru Home Additions & ADU Is Failing
These are the symptoms that bring owners to us on San Francisco additions and ADUs. Each points somewhere specific.
- Door sticks or drags through the season. Usually a frame that’s shifted or a threshold that’s out of level – common when a new slab settles. The door isn’t the problem; the opening is.
- Water at the threshold after rain or fog. Failed flashing or a threshold set without a proper sill pan. In San Francisco’s wet winters, this tracks inside within a season and is the most common failure we see on new additions.
- Weatherstripping gaps or tears. Wear item, but on a new unit it usually means the door wasn’t hung square or the seal was wrong for the profile. Easy to check, easy to fix.
- Fogging or condensation between glass panes. A failed insulated glass unit in the door lite or sidelite. The seal has broken; the glass needs replacing, not the whole door.
- Rough or misaligned operation at the hinges. Hinge screws pulling or a frame out of plumb – on an addition, this can signal the header or framing moved after installation.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included
Here’s how San Francisco pricing breaks down on the projects this page covers. These are installed ranges, not door-only prices, and they include labor, permits where required, and the door package spec’d to the opening.
| Project | Installed Range (San Francisco) |
|---|---|
| Home Addition | $53,100 – $153,400 |
| ADU Construction | $106,200 – $259,600 |
| Garage Conversion | $35,400 – $94,400 |
What drives the range: footprint, foundation type (San Francisco’s hillside lots and older stock often need engineered solutions), permit and inspection complexity, and the door and window package. A single-door replacement on an existing addition is a small line item – the bigger number is the build. We give line-item pricing in writing: door spec, framing, flashing, finish, labor. The number you see is the number you pay, and the work carries our 730-Day Done Right Promise. From foundation to finish line, one contractor.
DIY or Call Us?
Some things are safe to check yourself: weatherstripping, door sweep, hinge screws, and whether water is pooling at the threshold. Those are visual inspections, and knowing what you’re looking at helps the conversation. What goes wrong on DIY: re-flashing a threshold on a new addition, re-framing a rough opening, or trying to correct a door that’s out of plumb without understanding why it moved. On a permitted San Francisco addition, those aren’t just repair tasks – they’re inspection items, and a fix that fails inspection costs more than the original install.
If the symptom is water tracking in, a frame that’s shifted, or glass that’s failed, that’s a call. Reach us at (866) 320-2646 – a live person answers 24/7, and we’ll schedule a free estimate and design consult. Background-checked, uniformed technicians on every visit.
FAQs
A well-installed Therma-Tru fiberglass entry door typically lasts 20-plus years, but in San Francisco the door outlives the install if the flashing and threshold aren’t right. The door isn’t usually what fails first here – the waterproofing detail around it is. Call (866) 320-2646 for an exact assessment; estimates are free.
Often yes. Weatherstripping, sweeps, and hinge hardware are wear items and can be replaced without touching the door. Failed glass in a sidelite or door lite can be swapped as an insulated glass unit. When the frame or slab itself has failed, replacement is the honest answer. We tell you which it is after we look – not before.
A straight door replacement on an existing opening is usually a single-visit job. If the rough opening needs reframing, re-flashing, or the addition’s waterproofing needs correction, plan on longer – and on a permitted San Francisco project, an inspection. We give you a realistic timeline in the written scope, not a guess on the phone.
We identify the series from the label on the door edge or jamb, measure the rough opening and slab, and match the unit to spec. OEM-compatible for doors and frames, quality equivalents for wear items. We don’t claim to stock parts or carry them on a truck – we source to your unit, which is the only way to get it right on a San Francisco addition where the opening dimensions matter.
Ready to price it? Call (866) 320-2646 for your free estimate and design consult. Live person, 24/7. No-hassle upfront pricing, 0% financing for 18 months, and $1,000 off projects over $10,000. Built to last, backed in writing.
Written by the team at Groundwork Construction Co. of San Francisco, serving San Francisco and nearby areas.