Home additions & ADU
Kitchen remodeling
Bathroom remodeling
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Quikrete Home Additions & ADU: The San Francisco Owner’s Guide
We build Quikrete-spec home additions and accessory dwelling units across San Francisco, with installed budgets running $53,100 – $153,400 for an addition and $106,200 – $259,600 for a full ADU. Quikrete enters these projects as the concrete side of the work: slab, footings, stem walls, and the mix that anchors them. This is planned construction, not an emergency dispatch, so we schedule a free estimate and design consult rather than promising a same-day arrival. You get a written line-item quote before anything moves.
Owners usually come to us after the first sign of trouble: a hairline crack spreading across a garage slab turned ADU floor, a footing that isn’t biting into San Francisco’s sandy fill, or a mix that cured too fast in the fog and never hit its rated strength. Groundwork Construction Co. of San Francisco is an independent builder, not affiliated with Quikrete, so we match the right product to your spec instead of pushing one brand.
- Answer first: Quikrete is the concrete component of an ADU or addition, never the whole build. The slab and footing package typically lands in the lower $10,000 – $30,000 band of a San Francisco project, and the rest is framing, MEP, and finish.
- The real driver: soil conditions and permit path, not the bag of mix. We confirm both before we quote.
- What you get in writing: upfront pricing with no surprises and the 730-Day Done Right Promise covering our workmanship.
Which Quikrete Models This Applies To
Quikrete’s concrete line splits into families, and the family you need depends on where in the build the concrete lands. For a San Francisco ADU slab sitting on grade, you want a high-strength structural mix: Quikrete’s High Strength Concrete Mix reaches around 4,000 psi at 28 days and is the usual pick for footings and slabs under a load-bearing structure. For repairs and smaller flatwork patching, the Fast-Setting Concrete Mix cures in roughly 20 – 40 minutes, which is convenient for setting posts but wrong for a slab where you need working time in cool, damp air. Quikrete also sells a crack-resistant Concrete Resurfacer for topping an old slab, and that one lives in a different aisle from the structural bags.
To identify the right product, read the bag label for the psi rating and the yield in cubic feet, then measure your formwork. One 80-pound bag of High Strength Mix yields about 0.6 cubic feet, so a footing 12 inches square and 20 feet long needs roughly 20 bags plus a 10 percent overage for uneven excavation. The OEM-versus-aftermarket call matters less here than the spec call: a store-brand structural mix that hits the same psi and meets the same ASTM standard is a fair substitute, while a fast-set patching product is not. We verify the spec against the permit drawings before we buy anything.
Quikrete is one brand we specify among a curated lineup that also includes kraftMaid, Cambria, and Silestone on the interior finish side. The concrete underneath is what those finishes sit on, so the spec has to be right.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your Quikrete Home Additions & ADU Is Failing
Concrete failures in San Francisco announce themselves slowly, then all at once. These are the five we see most on ADU and addition jobs.
- Map cracking across the slab. Usually a mix that was poured too wet or finished too fast in the cool morning fog, which weakens the surface layer. It looks cosmetic until moisture gets in and the freeze-thaw cycle we do get in the outer Sunset starts lifting edges.
- Footing settlement and a sloping floor. San Francisco sits on sandy fill and bay mud in many neighborhoods, and a footing sized for stable soil will sink in soft ground. You’ll notice doors that stick and a floor that pools water toward one corner.
- Powdery, dusting surface. A curing problem, where the slab dried before it could set properly, often from wind or sun during a warm October pour. The surface never hardens and wears away under foot traffic.
- Efflorescence and rising damp at the stem wall. White salt staining means moisture is wicking through, common in our damp coastal air and a sign the mix or the waterproofing at the base was underbuilt. Left alone, it eats at the wall from the inside.
- Cracks widening past a hairline. Anything over an eighth of an inch, or a crack with vertical offset, points to a structural or soil issue rather than normal shrinkage. This is the one to call on before finish work goes in.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included
Home additions in San Francisco run $53,100 – $153,400 for the full scope, and ADU construction runs $106,200 – $259,600. The Quikrete concrete portion is a slice of that total, and we list it as its own line item so you can see what the mix, forming, rebar, and pour labor actually cost. Garage conversions, a common starting point for ADUs here, run $35,400 – $94,400.
- What drives the range: excavation depth and soil remediation on soft ground, the permit and inspection path, accessibility for a concrete truck on a narrow San Francisco street, and whether the slab is a simple rectangle or has interior footings for the framing.
- Parts plus labor, itemized: every bag of mix, every linear foot of rebar, and the labor hours are priced out upfront. The number you see is the number you pay.
- Warranty on the work: the 730-Day Done Right Promise covers our workmanship, so if it’s not done right, we make it right.
DIY or Call Us?
An owner can safely check a few things: measure the yield against the form volume, confirm the bag’s psi and cure time, look for powdery surfaces and cracks wider than an eighth of an inch, and photograph the slab for a contractor to review. Where DIY goes wrong is in the pour itself. A structural slab or footing needs correct mix water, proper consolidation, and correctly placed rebar, and getting the water ratio wrong quietly drops the strength of the whole thing. On a load-bearing ADU foundation that’s not a weekend mistake you can undo. Call (866) 320-2646 and we’ll walk the site and give you a straight read before you commit to anything.
FAQs
A structural slab poured to spec and properly cured should hold 50 years or more, and if it’s not carrying the load it should, we make it right under the 730-Day Done Right Promise. The failure points are usually soil and water, not the mix itself. Call (866) 320-2646 for an exact look at your slab, estimates are free.
Sometimes. Hairline shrinkage cracks and a dusting surface can often be stabilized with Quikrete Concrete Resurfacer or an epoxy injection, while a footing that’s settling in soft San Francisco soil needs more than a patch. We tell you which one you’re looking at before quoting. Call (866) 320-2646 for a free assessment.
A typical residential slab and footing pour cures enough to frame on in about 7 days and hits full strength at 28 days. The pour itself is usually a single day, weather and truck access allowing. Call (866) 320-2646 to get your schedule on paper.
We spec the Quikrete family that matches your permit drawings, verify the psi and yield against the formwork, and order to that spec, with a quality equivalent considered only when it meets the same standard. No stock claims and no guessing on the truck. Call (866) 320-2646 to start with a free estimate and design consult.
Ready to plan a Quikrete-spec addition or ADU in San Francisco? We answer the phone with a live person, 24/7, and every project gets upfront pricing, background-checked uniformed technicians, and the 730-Day Done Right Promise behind it. Call (866) 320-2646 to schedule your free estimate and design consult.
Written by the team at Groundwork Construction Co. of San Francisco, serving San Francisco and nearby areas.