Kitchen remodeling
Bathroom remodeling
Home additions & ADU
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Garage Conversion ADU in Daly City, CA: What It Takes and What It Costs
A Garage Conversion ADU in Daly City generally runs $45,000 – $130,000 and takes four to seven months from the first site walk to the final inspection. The low end covers a straightforward conversion in a tuck-under garage that already has a level slab and room for a bathroom. The high end covers structural repairs, a new bathroom and kitchenette, upgraded electrical service, and hillside drainage work. Call (866) 320-2646 and we’ll walk your garage, look at the framing, and tell you which end of that range you’re actually facing.
How a Garage Conversion ADU Comes Together, Stage by Stage
This isn’t a job where a crew shows up and disappears for a month. You’ll make a handful of decisions at set points, and knowing where those points fall keeps the schedule honest.
Stage 1: Site walk and feasibility (week 1)
We measure the garage, check headroom under the existing beams, and look at the slab for cracks or settling. On Daly City’s slopes, we also check how water moves around the garage door opening. You decide here whether the garage stays partly a garage or converts fully; that single choice changes the whole plan.
Stage 2: Design and permit submission (weeks 2 – 8)
Drawings go to the city, and Daly City plan review is where projects live or die on paper. The review flags things like egress windows, ceiling height, and whether the existing structure was ever permitted. If we find an unpermitted conversion from decades ago, that has to be resolved before anything new gets signed off. You approve the layout and finishes during this window.
Stage 3: Demo and structural prep (weeks 2 – 4 of construction)
We pull out the old garage door, any shelving, and interior partitions. Then comes the unglamorous part: rot repair. On the fog-soaked streets off Mission and around Westlake, we routinely open a wall and find the bottom plate of the framing has gone soft. That gets sistered or replaced before insulation goes in. You’ll see a change order if the rot is extensive; our written estimate spells out the allowance for it so the number you see is the number you pay.
Stage 4: Systems rough-in and inspections (weeks 4 – 9)
Plumbing for the bathroom and kitchenette, electrical for outlets, lighting, and a dedicated circuit for heat, and any new insulation go in now. Each trade gets inspected before walls close. You pick fixtures during this stage, which is also the right time to decide on flooring.
Stage 5: Finishes and final walkthrough (weeks 9 – 16)
Drywall, paint, flooring, cabinetry, and fixtures land in sequence. We schedule the final inspection, hand over the signed-off permit, and walk the unit with you. Our technicians have up to 12 years of experience with this sequence, and every job is covered by the 730-Day Done Right Promise: if something isn’t right, we come back and make it right.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Options You’ll Choose Between on a Garage Conversion ADU
Most of the cost spread on a conversion comes down to five or six choices. Here’s what they actually mean.
- Bathroom or kitchenette, or both: A half bath keeps plumbing simple; a full bath with a shower and a small kitchenette adds real rental value but pushes rough-in costs up.
- Slab-on-grade vs. raised floor: The existing slab is cheapest. If it’s cracked or sits below grade, a raised wood floor solves drainage but adds framing and cost.
- Electrical service: If your panel has room, a conversion runs lean. If it’s an older 100-amp panel, upgrading is often required and adds a meaningful line item.
- Windows and door: Impact-rated or double-pane units cost more up front and hold up better against wind-driven rain. We work with Andersen, Pella, and similar lines depending on the opening.
- Flooring: Luxury vinyl plank handles a garage-grade slab and damp air well. Tile costs more but suits a bathroom entry.
- Heat and ventilation: A ductless mini-split is the common choice; it costs more than baseboard but keeps a fog-cooled unit comfortable year-round.
Homeowners often pair the conversion with Cabinets & Countertops in Daly City for the kitchenette and Backsplash, Tile & Flooring in Daly City to finish the wet areas.
What Garage Conversion ADU Costs in Daly City, CA
Plan on $45,000 – $130,000 for a garage conversion in Daly City, with most completed units landing between $60,000 and $95,000. Here’s what moves the number.
- Size and headroom: A 400 sq ft conversion is straightforward; a larger footprint or one that needs a raised ceiling hits the top of the range.
- Existing condition: Rot repair, slab repair, or legalizing a prior unpermitted conversion can add $8,000 – $25,000.
- Moving systems: Relocating a water heater, furnace, or laundry from the garage adds cost; keeping them in place saves it.
- Permit scope: A full permitted conversion is the bulk of the range. Skipping permits isn’t a savings, it’s a liability you inherit at resale.
- Finish grade: Fixture and cabinetry choices swing the total by $5,000 – $15,000 easily.
A written estimate from us includes demolition, structural repair, framing, insulation, drywall, electrical, plumbing, finishes, and permit coordination. It typically excludes landscaping, driveway repair, and any work tied to a larger addition. If you’re weighing a conversion against building out, it helps to look at the full scope on our Home Additions & ADU in Daly City page. Financing is available at 0% for 18 months, and projects over $10,000 get $1,000 off.
See the difference
Before
After
Before
After
Before
AfterWhat Daly City Homes Specifically Do to This Job
Daly City’s dense rows of post-war stucco-over-wood-frame homes sit on steep, fog-soaked slopes. That single fact shapes every garage conversion here. On tight lots in the 94015 and 94014 ZIP codes, neighbors’ walls are only feet away, so staging materials and getting equipment in is its own puzzle. Hillside soils stay saturated longer, which means we deal with drainage and retaining-wall issues before a unit can be signed off. We regularly find original redwood framing and unpermitted garage conversions that have quietly rotted from the fog and need to be rebuilt and legalized first. Coastal moisture also means we spec exterior assemblies and ventilation more carefully than you’d need to inland. If your project turns into a wider scope, our Home Additions & ADU service covers it, and we handle work across Daly City.
Serving Daly City, CA – Our Local Coverage Area
We serve Daly City and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Garage Conversion ADU in Daly City
Most Daley City conversions take four to seven months, with permit review often the longest stretch. Construction itself usually runs three to four months once the permit is in hand. Call (866) 320-2646 for a timeline based on your specific garage.
Yes. A habitable Garage Conversion ADU in Daly City requires permits and inspections. Skipping them creates problems at resale and can force a rebuild. We pull the permits and schedule the inspections.
Often, yes. If the bathroom can sit near the existing plumbing and the ceiling height works as-is, the job stays simpler. Moving a water heater or furnace adds cost; we’ll tell you which path makes sense during the site walk.
The range is $45,000 – $130,000, with most units landing between $60,000 and $95,000 depending on bath and kitchenette scope, existing rot, and finish grade. Call (866) 320-2646 for an exact quote; estimates are free.
Rarely, if we’ve done a proper site walk first. We give upfront pricing with allowances for hidden rot clearly stated, so there are no surprises. Our 730-Day Done Right Promise backs the workmanship in writing.
Get a Free Estimate on Your Garage Conversion ADU in Daly City
Call (866) 320-2646 to set up a free on-site estimate for your Garage Conversion ADU in Daly City. We’ll measure the garage, check the framing and drainage, and give you a written, line-item number with no change-order guessing. A live person answers around the clock. No voicemail, no waiting until Monday. From foundation to finish line, we handle it.
Written by the team at Groundwork Construction Co. of San Francisco.