A Groundwork company - serving San Francisco, CA
New Detached ADU in Daly City, CA | Groundwork Construction Co. of San Francisco

New Detached ADU in Daly City - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Kitchen remodelingKitchen remodeling
Bathroom remodelingBathroom remodeling
Home additions & ADUHome additions & ADU
RoofingRoofing
Windows & doorsWindows & doors
Driveway & paversDriveway & pavers
FenceFence
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

New Detached ADU in Daly City, CA: What You’re Actually Building

A new detached ADU in Daly City is a separate, fully permitted second dwelling on your lot, built from the ground up, and it usually runs $45,000 – $130,000 depending on size, site conditions and finish level. Plan on 8 to 14 months from first site visit to final inspection on most Daly City lots. If your property sits on one of the steep hillside streets here, access and foundation work can push both the number and the schedule. Call (866) 320-2646 and we’ll walk your parcel with you before you commit to anything.

Call (866) 320-2646

Stage by Stage: How We Build a Detached ADU Here

Detached work runs on a different clock than an interior remodel. You’re building a structure, connecting it to utilities, and passing a full set of inspections. Here’s the sequence we follow so you know what’s happening and when you need to make a decision.

Stage 1 – Site walk and feasibility (week 1). We look at grade, access width, utility locations and setback lines. On Daly City lots, this is where we find out whether a truck can reach the build area and whether the hillside soil needs drainage work before anything else. You decide on the general footprint and budget band here.

Stage 2 – Design and permitting (roughly 2 to 5 months). Drawings go to the city, and plan review happens. Coastal slope properties take longer. This is where you pick exterior materials, so the plans match what gets built. You sign off on the design package before submittal.

Stage 3 – Site prep and foundation (about 3 to 5 weeks). Clearing, grading, drainage, then concrete. On sloped Daly City parcels we often install retaining and drainage before the foundation pour. You’ll decide on utility trench routing during this stage.

Stage 4 – Framing, envelope and rough-ins (about 8 to 12 weeks). Framing goes up, then the roof, then windows and doors, then plumbing, electrical and HVAC rough-ins. Inspections happen at each milestone. This is the longest stretch and the one most affected by weather.

Stage 5 – Finishes and final inspection (about 6 to 8 weeks). Insulation, drywall, flooring, cabinets, fixtures and paint. You make your finish selections during Stage 4 so nothing stalls. Final inspection closes the job and the 730-Day Done Right Promise covers the work from there.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Choices You’ll Actually Make

The finish and structural selections below are where most of the budget differences live. Here’s the honest read on each.

  • Size and footprint. A compact 400 – 500 sq ft unit keeps you in the lower band; a 700 – 900 sq ft two-bedroom pushes toward the top. Smaller is easier to permit on tight Daly City lots, and easier to build without disturbing neighboring walls.
  • Foundation type. Slab-on-grade is simplest and cheapest on flat ground. Post-and-pier or a stepped foundation is common on hillside lots and costs more but handles grade changes without massive excavation.
  • Exterior cladding. Stucco matches the surrounding Daly City housing stock and holds up well, though the fog and wind-driven rain here mean paint needs refreshing more often than inland. James Hardie fiber cement resists moisture better and costs more up front.
  • Windows and doors. Double-pane units make a real difference in a foggy climate. ECO Window Systems and Therma-Tru doors are two we install regularly, and both handle the damp and wind well. Single-pane saves money now and costs you on comfort and moisture later.
  • Heating and systems. A ductless mini-split is the common choice for a detached unit and avoids running ductwork across the yard. A full ducted system costs more but suits a larger footprint.
  • Kitchen and bath finish level. A basic rental-grade kitchen and bath sits at the bottom of the band; a full custom finish sits at the top. Most owners build for rental or family use and land in the middle.

What a New Detached ADU Costs in Daly City, CA

Expect $45,000 – $130,000 for the build itself, with site work and utility connections sometimes adding more on difficult parcels. The five variables that move the number:

  • Square footage. A 500 sq ft unit and a 900 sq ft unit are not the same job. This is the biggest driver.
  • Site and grade. Steep lots need retaining, drainage and sometimes extra foundation work before framing starts.
  • Utility runs. The distance from your main panel and water line to the new structure matters. Trenching, panel upgrades and separate metering all add cost.
  • Material grade. Cladding, windows, flooring and fixtures account for a wide spread between rental-grade and custom finish.
  • Permit scope. A larger unit with more bedrooms and more plumbing fixtures means more review and more inspection points.

A written estimate from us is line-item, and the number you see is the number you pay. What it typically includes: design coordination, permit handling, foundation, framing, envelope, rough-ins and finish work to the agreed spec. What sits outside it and gets quoted separately: major utility upgrades, unpermitted conditions discovered on the existing house, and landscaping beyond grading. $1,000 off applies to projects over $10,000, and 0% financing for 18 months is available.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Daly City Lots Specifically Do to This Job

Daly City’s dense rows of post-war stucco-over-wood-frame homes sit on steep, fog-soaked slopes, and that shapes every detached ADU built here. The steep streets off Mission and Westlake regularly turn up original redwood deck framing and old unpermitted garage conversions that have quietly rotted from decades of fog, and those conditions have to be rebuilt or legalized before a new structure can be signed off. Neighbors’ walls sit feet from your property line, so access and staging are a genuine puzzle, not a footnote. Hillside soils stay saturated longer than inland ground, which pushes drainage and retaining work up the list. Persistent wind-driven rain means exterior paint and stucco fail faster here, so cladding choice matters more than it would in a sunnier suburb. If your plans reach into the existing house, that’s part of a full Home Additions & ADU in Daly City scope and gets priced separately.

Serving Daly City, CA – Our Local Coverage Area

We serve Daly City and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked – New Detached ADU in Daly City

Get a Free On-Site Estimate for Your New Detached ADU

We’ll walk your Daly City property, look at grade, access and utilities, and give you a written line-item estimate for a new detached ADU, free. You’ll know what’s included, what isn’t, and what permits the build needs before you spend a dollar. Call (866) 320-2646 to schedule. A live person answers around the clock.

Written by the team at Groundwork Construction Co.

Why Daly City Chooses Groundwork Construction Co. of San Francisco

We set the standard for new detached ADU in Daly City.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Daly City

Getting your new detached ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your new detached ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local new detached ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Daly City Customers Say

Trusted by homeowners across Daly City and surrounding areas.

★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong
★★★★★

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

Robert Sullivan

Ready for New Detached ADU in Daly City?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Daly City.

(866) 320-2646

Request a Free Estimate in Daly City

Tell us about your new detached ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Us
Local Service Coverage
Call Now - 24/7 Dispatch