A Groundwork company - serving San Francisco, CA
New Detached ADU in Tiburon, CA | Groundwork Construction Co. of San Francisco

New Detached ADU in Tiburon - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Kitchen remodelingKitchen remodeling
Bathroom remodelingBathroom remodeling
Home additions & ADUHome additions & ADU
RoofingRoofing
Windows & doorsWindows & doors
Driveway & paversDriveway & pavers
FenceFence
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

New Detached ADU in Tiburon, CA: What It Takes and What It Costs

A new detached ADU in Tiburon, CA typically runs $45,000 – $130,000 for a modest unit, while a full detached ADU with its own kitchen, bath and separate utility connections lands in the $90,000 – $220,000 range. From the first site walk to final inspection, plan on 8 to 14 months once you factor in Tiburon’s design review and hillside engineering. Call (866) 320-2646 and we’ll walk your lot and give you a real number, not a range pulled from thin air.

Call (866) 320-2646

How a New Detached ADU Gets Built Here, Stage by Stage

Detached ADU work rewards a homeowner who knows what’s coming. Here’s the actual sequence we run, with realistic timing. The numbers assume your lot is buildable and you’re not waiting on a redesign.

Stage 1: Site walk and feasibility (week 1)

We start on your lot, not behind a desk. That means measuring setbacks, finding where the sewer lateral and water main actually sit, and figuring out whether a dumpster can reach the pad or whether everything gets walked in. On a steep Tiburon hillside lot, this visit often surfaces a real constraint: a crane pick, a pump truck, or a retaining wall that has to be priced before anyone talks about cabinets. You’ll get a written line-item estimate from this visit, not a ballpark.

Stage 2: Design, engineering and permitting (months 2 – 5)

You’ll choose the footprint, ceiling height, and whether the unit shares your existing driveway or gets its own. A structural engineer and a soils report come next, and on sloped ground in Tiburon those two documents drive the foundation cost. The permit package goes to the town for plan review and, where a slope or shoreline is involved, to the additional reviewers that review a peninsula lot. You’ll be making finish decisions while this runs; that’s the point of overlap.

Stage 3: Site prep, foundation and utilities (months 5 – 7)

Excavation, grading, and the foundation go in first, along with the trenching for the separate electrical service, water line, and sewer tie-in. If your lot needs shoring or a retaining wall, that happens now, before the slab. This is the stage where access logistics cost the most time and money on a Tiburon build. Concrete trucks that can’t reach the site mean pump charges or a longer pour schedule.

Stage 4: Framing, envelope and rough-ins (months 7 – 10)

Framing goes up, then roofing, siding, windows and doors, and then the rough electrical, plumbing and mechanical work that has to be inspected before anything gets closed in. You’ll lock in your exterior cladding and window package here, and honestly, the salt air off Richardson Bay should push you toward corrosion-resistant fasteners and better flashing than a flatter inland town would demand.

Stage 5: Finishes, punch list and final inspection (months 10 – 14)

Insulation, drywall, flooring, cabinets, fixtures and paint bring the unit to life, and the final building inspection closes it out. You get a walkthrough, a written punch list, and the keys. The 730-Day Done Right Promise covers the workmanship from that day forward.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Options You’ll Choose Between on a Detached ADU

A detached unit gives you more freedom than an attached one because you’re not fighting the main house’s footprint. Here’s where the real money decisions sit.

  • Foundation type: A slab-on-grade is the cheapest route on flat ground. On a slope above downtown Tiburon you’ll more likely need a perimeter or pier-and-beam foundation, which adds cost but handles grade and keeps the unit level.
  • Exterior cladding: Fiber cement like James Hardie holds up well against the fog-belt moisture cycling and needs less maintenance than wood. Stucco matches much of the older Tiburon housing stock but cracks on a settling hillside. Wood siding looks right on an early-1900s cottage and costs you in repainting every few years.
  • Roofing: Architectural asphalt shingle is the value pick. Standing-seam metal costs more upfront and handles the salt air and rain better over time. GAF and CertainTeed both carry solid shingle lines that make the trade-off clear on paper.
  • Windows and doors: A unit with its own entrance needs real exterior-grade doors and windows rated for wind-driven rain. Cheaper units leak at the sill within a few seasons on a west-facing slope.
  • Fixtures and finishes: Sterling and Grohe fixtures sit in the sweet spot for a rental-grade ADU: reliable, serviceable, and not so pricey that you’ll resent a tenant for using them. You can go higher, but set that against what the unit will earn.
  • Heating and hot water: A ductless mini-split handles both heating and cooling efficiently and needs no ducts. A separate tankless water heater keeps the unit self-contained and metered apart from the main house.

What a New Detached ADU Costs in Tiburon, CA

Budget $45,000 – $130,000 for a new detached ADU on the modest end and $90,000 – $220,000 for a fully equipped unit. Those ranges are wide on purpose. Here’s what pushes a job from one end to the other:

  • Size and configuration: A studio with a kitchenette and a three-quarter bath sits near the bottom. A one-bedroom with a full kitchen, laundry and separate utility meters moves up fast.
  • Site condition and access: On the steep streets above Main Street and around Belvedere, grading, shoring, retaining walls and material staging can add more to the bill than the finishes ever will. A lot a dumpster can’t reach costs more to build on, full stop.
  • Utility distance: The farther the new unit sits from your main service panel and sewer lateral, the more trenching, conduit and wire you pay for. A detached ADU in the back corner of a deep lot is not the same job as one beside the driveway.
  • Material grade: Builder-grade fixtures and finishes versus a higher-end package can swing the interior cost substantially. The structure stays the same; the finishes are where you choose.
  • Permit and engineering scope: A hillside lot that needs a soils report, structural engineering and additional review carries permit and design costs a flat lot never sees.

A written estimate from us lists the line items, the allowances and the exclusions, so you know what the number covers. Landscaping, furniture, and any tenant-ready appliances beyond the allowance typically sit outside the base contract, and we say so up front. No-hassle upfront pricing means the number you see is the number you pay.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Tiburon Homes and Hillsides Do to This Job

Tiburon is a steep-hillside peninsula town, and nearly every new detached ADU here is really a site-engineering project wearing a construction hat. Contractors plan crane picks, pump trucks and material staging around hairpin driveways and limited street parking before they ever price the framing. That single reality separates Tiburon from flatter Marin towns like Corte Madera or San Rafael, and it’s why two lots a block apart can carry very different price tags.

The housing stock compounds it. Downtown Tiburon has early-1900s shingle and stucco cottages, the hills carry mid-century and contemporary homes on cantilevered decks, and the peninsula tip and Belvedere hold large waterfront estates. Plenty of these lots are built into a slope, so retaining-wall work, foundation design and seismic review are part of the conversation. Marin’s fog belt and winter rain cycle moisture on south- and west-facing exposures, which rots deck framing and window trim, while salt air off the bay corrodes fasteners, flashing and metal railings. We plan corrosion-resistant hardware and proper flashing from the start on any unit near the water. We cover all of Tiburon, ZIP 94920 included.

Serving Tiburon, CA – Our Local Coverage Area

We serve Tiburon and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked: New Detached ADU in Tiburon

Get a Free Estimate for Your New Detached ADU in Tiburon

Every project starts with a free on-site estimate and design consult. We walk your lot, talk through setbacks, access and slope, and hand you a written line-item number with no pressure attached. You can pair the build with Backsplash, Tile & Flooring in Tiburon and Kitchen Design & Layout in Tiburon if you want the unit finished to match the main house, and it’s often part of a full Home Additions & ADU in Tiburon plan. Learn more about our Home Additions & ADU work, then call (866) 320-2646. A live person answers, day or night. Projects over $10,000 get $1,000 off, and 0% financing for 18 months is available.

Written by the team at Groundwork Construction Co.

Why Tiburon Chooses Groundwork Construction Co. of San Francisco

We set the standard for new detached ADU in Tiburon.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Tiburon

Getting your new detached ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your new detached ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local new detached ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Tiburon Customers Say

Trusted by homeowners across Tiburon and surrounding areas.

★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong
★★★★★

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

Robert Sullivan

Ready for New Detached ADU in Tiburon?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Tiburon.

(866) 320-2646

Request a Free Estimate in Tiburon

Tell us about your new detached ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Us
Local Service Coverage
Call Now - 24/7 Dispatch