Bathroom remodeling
Kitchen remodeling
Home additions & ADU
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Full Bathroom Remodeling in Tamalpais-Homestead Valley: What It Costs and How Long It Takes
Full bathroom remodeling in Tamalpais-Homestead Valley, CA runs $9,000 – $28,000 and takes 4 – 7 weeks from demo to final inspection, depending on whether the layout moves and how much hidden rot the hillside turns up. That number covers a complete gut: new tile, vanity, shower or tub, toilet, lighting, fan, and water-resistant finishes wall to wall. Call (866) 320-2646 for a free on-site estimate and a written line-item quote before anything gets ordered.
How We Run a Full Bath Remodel Here, Stage by Stage
Bathrooms go sideways when the sequence is guessed at. Ours doesn’t change much job to job, and that’s the point.
Stage 1: Site protection and demo (days 1 – 3)
We seal off the room and the path to it, then strip the space to studs: tile, drywall, vanity, tub or shower, toilet, and old subfloor. Two to three days for a standard 5×8 or 6×8 bath. You decide the layout now, before a hammer swings, because moving a drain or supply line later costs real money.
Stage 2: Rough-in and framing (days 3 – 6)
Plumbing, electrical, and venting get run to the new layout, then inspected. If you’re relocating a sink wall or adding a dedicated circuit for a heated floor, this is the only window for it. We don’t cut corners on the exhaust fan here; a bathroom under redwoods needs to move air or it grows things.
Stage 3: Backer board and waterproofing (days 6 – 8)
Cement board and a bonded waterproofing membrane go up around the wet zone. This is the stage nobody sees and everybody pays for later if it’s skipped. You don’t decide much here. We just want you to know it happens and it’s inspected.
Stage 4: Tile, fixtures, and finishes (days 8 – 20)
Floor and wall tile, grout, vanity and counter, toilet, shower valve and trim, lighting, and paint. This is the longest stretch, and it’s where your material choices get locked in. We need final tile and fixture selections by day 5 so nothing sits waiting on a delivery truck.
Stage 5: Punch list and final walkthrough (days 20 – 35)
Cure time, caulk, touch-ups, and a walkthrough where you point at anything that isn’t right. Every job lands under our 730-Day Done Right Promise, and calls are answered by a live person, 24/7, if something needs a second look after we’re gone.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices You’ll Actually Make (and What Each One Costs You)
Most of the decisions happen in the first week. Here’s the honest trade-off on each.
- Tile vs. large-format porcelain. Standard ceramic is the budget pick and it shows wear in a few years on a floor. Large-format porcelain runs higher but fewer grout lines mean less to scrub and less to stain in a humid room.
- Vanity grade. Stock boxes get you a solid look at low cost. A semi-custom cabinet in a moisture-rated finish, in the KraftMaid or Wellborn family of products, holds up longer under daily steam and gives you a real fit to the wall.
- Countertop material. Quartz like Cambria handles water and cosmetics without sealing. Granite needs re-sealing. Laminate is the cheapest and the first thing to fail near a wet sink.
- Shower base vs. tiled pan. A prefab base installs fast and leaks less. A tiled pan looks better and costs more, and only pays off with correct waterproofing.
- Ventilation. A basic fan is fine on the sunny side of the valley. Under the redwood canopy we spec a higher-CFM fan with a humidity sensor, because moisture is the enemy here.
- Heated floor. Adds cost and a circuit, but on a north-facing hillside bath it’s the difference between a room you use in January and one you avoid.
What Full Bathroom Remodeling Costs in Tamalpais-Homestead Valley, CA
Expect $9,000 – $28,000 for a full bathroom remodel in Tamalpais-Homestead Valley, with the low end on a same-layout refresh and the high end on a layout change with premium finishes. Where a job lands depends on five things:
- Size and layout. A 5×8 hall bath stays near the bottom. Pushing walls or combining rooms adds framing and moves you up.
- Existing condition. Hillside homes hide rot behind tile more often than flatland ones. Replacing a soft subfloor or a rotted joist adds cost.
- Moving plumbing or electrical. Keeping fixtures where they are saves real money. Relocating a drain line or adding circuits pushes the number up.
- Material grade. Tile, vanity, and counter choices swing the total by several thousand on their own.
- Permit scope. A like-for-like finish swap is a lighter permit than a layout change with structural work.
A written estimate from us lists demo, rough-in, waterproofing, tile, fixtures, and cleanup line by line. It does not cover hidden rot found after demo, or upgraded fixtures you choose mid-job. We price those in writing before we touch them, so there’s no surprise on the invoice. Pricing is upfront and the number you see is the number you pay for the scope we agreed to. Call (866) 320-2646 for an exact quote; estimates are free.
See the difference
Before
After
Before
After
Before
AfterWhat Tamalpais-Homestead Valley Homes Do to This Job
This is unincorporated Marin County, which means County of Marin permitting, not a city building department, and that changes the review timeline on any bathroom that moves plumbing or structure. Homes here sit on steep, wooded lots, and the narrow winding lanes in the valley floor limit where a truck can park and how much material gets staged at once. We plan deliveries around that or we’re carrying tile up a flight of steps. The housing stock is mostly mid-century redwood-and-glass and post-and-beam homes from the 1950s through the ’70s, many with additions layered on, so a bathroom wall is rarely new construction. On north-facing slopes tucked under the redwoods, baths stay damp and shaded, and we regularly pull tile to find soft framing and old moisture damage the sunny side of the valley never sees. Steep terrain also means drainage and slope issues that can show up as moisture in a lower-level bath.
Serving Tamalpais-Homestead Valley, CA – Our Local Coverage Area
We serve Tamalpais-Homestead Valley and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked: Full Bathroom Remodeling in Tamalpais-Homestead Valley
Most full bathroom remodels here take 4 – 7 weeks from demo to walkthrough. The longer end is a layout change or a County of Marin permit review that runs past the usual window. Call (866) 320-2646 and we’ll give you a timeline for your specific room.
Yes, if you’re moving plumbing, electrical, or walls. A finish-only swap may qualify as a lighter permit, but County of Marin has the final say and we confirm the scope before we start. We pull the permit and see the inspection through.
Yes, and it’s the most common way to keep a full bathroom remodel in budget. Keeping the toilet, sink, and shower where they are saves the rough-in cost and typically keeps you near the lower end of the $9,000 – $28,000 range. Call for an exact quote on a same-layout plan.
Moving plumbing and hitting hidden rot behind the tile. Those two push a full bathroom remodel in Tamalpais-Homestead Valley toward the top of the range faster than finish choices do. We flag both in the written estimate before work starts.
Every project is covered by our 730-Day Done Right Promise, one of the longest workmanship guarantees in residential construction. If it’s not done right, we make it right. Call (866) 320-2646 with any question, and a live person answers around the clock.
Get a Free Estimate for Full Bathroom Remodeling in Tamalpais-Homestead Valley
Call (866) 320-2646 to schedule a free on-site estimate. We’ll walk the bathroom, measure, check what’s behind the walls and under the floor, and talk through layout and finish options with real prices attached. You leave the call with a written line-item quote and a realistic timeline, not a ballpark. That estimate is part of our Bathroom Remodeling in Tamalpais-Homestead Valley service, and if the job grows into a wider project, our Bathroom Remodeling team covers the full scope from foundation to finish line. We cover all of Tamalpais-Homestead Valley and the surrounding hills. Homeowners often pair a bath remodel with Roof Repair in Tamalpais-Homestead Valley or, on older homes, Roof Replacement & Installation in Tamalpais-Homestead Valley while the walls are open. Projects over $10,000 get $1,000 off, and we offer 0% financing for 18 months. Our technicians have up to 12 years of experience.
Written by the team at Groundwork Construction Co..