Kitchen remodeling
Bathroom remodeling
Home additions & ADU
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterADU Rules and Requirements in San Francisco: Where State Law Stops and SF Planning Begins
California’s statewide ADU law says a detached unit is allowed on most single-family lots. San Francisco says: run your lot through Planning Department screening first, document your building’s soft-story seismic status, and, if you’re in a historic district, clear preservation design review before a permit is issued. The state rules you read online aren’t wrong, but they’re incomplete for San Francisco property. That gap between Sacramento and City Hall is where ADU timelines go sideways, and it’s the single biggest reason we tell homeowners to verify local requirements before they draw a single line.
Groundwork Construction Co. of San Francisco works through that process on every ADU project we deliver. Call (866) 320-2646 and a person picks up, day or night, to talk through where your property actually stands.
Key Takeaways
- State law sets the outer boundary; San Francisco Planning Code Section 207 and local ordinances set the real rules.
- Owner-occupancy, historic district design review, and soft-story retrofit documentation are the three local chokepoints state law does not fully override.
- Each ADU type (JADU, attached, detached, garage conversion) has its own setback, height, and floor-area rules.
- RH-1 lots can still trigger discretionary review, which state law was meant to eliminate.
- Fog-belt weatherproofing is a construction quality issue, not a code issue, and it decides how long a garage conversion actually lasts.
Where San Francisco Diverges From State ADU Law
The state tells you a JADU can be up to 500 square feet inside an existing envelope and that a detached ADU can generally reach 800 to 1,200 square feet depending on jurisdiction. San Francisco accepts those caps, then layers its own conditions on top. Here’s the short list of the local rules that catch people:
- Owner-occupancy. State law relaxed owner-occupancy requirements for most ADUs, but a JADU in San Francisco still ties to an owner-occupied primary residence. Owners who plan to rent both units need to check this before they commit to a JADU over a full ADU.
- Historic district design standards. If your building sits in a designated historic district, your ADU design has to clear preservation guidelines. That means compatible materials, window proportions, and rooflines that match the existing building. A stock plan pulled off the internet usually won’t pass.
- Soft-story retrofit status. If your building is on the city’s soft-story retrofit list, the ADU permit won’t move until the retrofit is complete or properly documented. This is the requirement that surprises owners most, and it’s the one that can add months to a schedule if it’s discovered late.
None of these are dealbreakers. They are sequencing problems, and they’re far cheaper to solve before design starts than after. That’s the operator detail that matters: on ADU work we treat permit screening as the first phase, not paperwork that trails the build.
ADU Types and Size Caps Under San Francisco Planning Code Section 207
Four ADU types are common in San Francisco, and each carries different rules under Section 207. Most homeowners assume the detached unit is the best option. In our experience on this city’s tight, densely built lots, the garage conversion often wins on cost and speed while the detached unit wins on square footage. Here’s the honest comparison:
| ADU Type | Typical Size | Setbacks & Height | SF Cost Range |
|---|---|---|---|
| Junior ADU (JADU) | Up to 500 sq ft, inside existing envelope | No new footprint, so setbacks are largely moot; must include an efficiency kitchen and a separate entrance | Often folds into a larger remodel |
| Attached ADU | Generally up to 1,000 sq ft | Follows the existing structure’s setbacks; height limited to the primary building envelope | $106,200-$259,600 |
| Detached ADU | Generally up to 1,200 sq ft | 4-foot rear and side setbacks allowed under state law; local lot-coverage (FAR) rules still apply | $106,200-$259,600 |
| Garage conversion | Varies with the existing garage footprint | No new footprint; must address parking replacement rules if the garage is the only parking on site | $35,400-$94,400 |
A note on floor-area ratio: state law shields ADUs from some local FAR limits, but San Francisco still applies FAR calculations to the primary building. If your existing house is already near its maximum, the ADU has to fit on what’s left. We run those numbers during screening so nobody designs a unit they can’t permit. Our full breakdown of Home Additions & ADU in San Francisco walks through the build side of this in more detail.
The RH-1 Discretionary Review Gotcha
State law was supposed to end the neighborhood review gauntlet for ADUs. In San Francisco, it didn’t fully. Lots zoned RH-1 (single-family) can still draw a discretionary review if a neighbor or the Planning Commission raises concerns about massing, privacy, or light. It’s not automatic, but it’s real, and it’s the difference between a 4-month permit and an 18-month permit. If you’re on an RH-1 lot, plan your design around reducing the likelihood of a DR: keep the unit lower on the site, pull it back from shared property lines, and avoid second-story additions where you can. Careful massing does more than any appeal.
This is also where San Francisco’s wider planning climate comes in. The city’s a dense, historic urban core built on steep hills, and nearly every project runs through some form of design review before a shovel hits dirt. ADUs compete for the same Planning Department attention as full home additions, so the review calendar is what it is.
Fog-Belt Weatherproofing: What Code Requires vs. What Lasts
Minimum code passes inspection. It doesn’t always survive the climate. On the west side of the city, marine fog, persistent damp, and Pacific salt corrode standard fasteners and paint at a rate that inland crews don’t plan for. A garage conversion that opens an existing garage to habitable space exposes cold, damp framing to warm interior air, and that’s where moisture problems start.
We spec stainless fasteners and galvanized flashing even on small ADU jobs, add a full vapor barrier and upgraded insulation in garage conversions, and use corrosion-resistant hardware on every exterior door and window. None of that is mandatory under the minimum code. All of it is what keeps a fog-belt ADU from needing a moisture remedy inside five years. Where we can, we lean on materials that are built for this climate, like James Hardie siding and KraftMaid cabinetry for the interior.
What Does an ADU Actually Cost in San Francisco?
A full ADU build in San Francisco runs roughly $106,200 to $259,600, and a garage conversion runs $35,400 to $94,400. The spread is wide because the range depends on site access, whether you’re adding a footing on a hillside lot, and how much of the permit process is contested. Expect permit, design, and planning-review costs to sit on top of the construction figure. We quote the whole package upfront, so the number you see is the number you pay, and 0% financing for 18 months is available to spread the build over time. Projects over $10,000 also qualify for $1,000 off.
Every ADU we deliver comes under our 730-Day Done Right Promise. If something we built isn’t right, we come back and make it right. Our technicians have up to 12 years of experience, and every one of them is background-checked and arrives in uniform.
Frequently Asked Questions
Yes, for a JADU. A Junior ADU in San Francisco must attach to an owner-occupied primary residence. A standard attached or detached ADU is not tied to owner-occupancy under current state rules, but confirm your specific lot and details with the Planning Department before committing.
Sometimes, yes. On RH-1 zoned lots, a discretionary review can be triggered by a neighbor or the Planning Commission over massing, privacy, or light concerns. State law limited these pathways but did not eliminate them locally. Careful design reduces the risk significantly.
If your building is on the city’s soft-story retrofit list, yes. The ADU permit won’t be issued until the retrofit is completed or its status is documented with the city. We check this during our initial screening so it doesn’t surprise you mid-project.
Plan on 6 to 18 months depending on zoning, historic district status, and whether a discretionary review is triggered. A straight garage conversion on a clean lot can move faster. A detached ADU on an RH-1 lot in a historic district can push toward the long end.
If the state rules you read online don’t match what City Hall is telling you, that’s the normal case, not a problem with your lot. Groundwork Construction Co. of San Francisco handles permit navigation, seismic documentation, and full-scope ADU delivery so you’re not chasing Planning Department answers alone. We serve homeowners across San Francisco from the west-side hills to the older Victoria and Edwardian row-house blocks, and we know where the local rules diverge from the state playbook.
The fastest way to know what your property can actually support is to walk it with someone who’s done it. Call (866) 320-2646 for a free project estimate and design consult. A live person answers around the clock, and the assessment comes with no pressure and no obligation.
Written by the team at Groundwork Construction Co. of San Francisco, serving San Francisco, CA.