A Groundwork company - serving San Francisco, CA
ADU Design & Permitting in San Anselmo, CA | Groundwork Construction Co. of San Francisco

ADU Design & Permitting in San Anselmo - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Kitchen remodelingKitchen remodeling
Bathroom remodelingBathroom remodeling
Home additions & ADUHome additions & ADU
RoofingRoofing
Windows & doorsWindows & doors
Driveway & paversDriveway & pavers
FenceFence
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

ADU Design & Permitting in San Anselmo: What It Costs and How Long It Takes

ADU design & permitting in San Anselmo typically runs $45,000 – $130,000 for the design-and-permit phase through a finished, inspection-ready unit, and the plan-check side alone usually takes 4 – 7 months before a shovel touches dirt. On the flats near San Anselmo Creek, that timeline stretches because floodplain and creek-setback review gets layered on top of town plan check. Call (866) 320-2646 and we’ll walk your lot through what your specific address will trigger.

Call (866) 320-2646

How We Take an ADU From Sketch to Approved Permit

Five stages, and you’ll make a real decision at each one. Here’s the honest sequence.

Stage 1: Site and feasibility review (1 – 2 weeks)

We pull the parcel record, check your zoning and setback envelope, and look at where the sewer lateral and water main actually run. On a San Anselmo lot near the creek, this is also where we flag whether your address sits in the floodplain and whether county flood-control review will be required. You decide here whether to pursue a detached, attached, or conversion path, and that decision drives everything downstream.

Stage 2: Schematic design and budget alignment (3 – 5 weeks)

We produce floor plans, elevations, and a preliminary cost model before anyone draws construction documents. This is the stage most homeowners skip and regret. You’ll choose unit size, bedroom count, and whether the kitchenette is a full kitchen or a partial setup. You approve a target budget here so the drawings get built to a number, not the other way around.

Stage 3: Construction documents and engineering (4 – 8 weeks)

Structural, Title 24 energy calcs, and civil work if the site needs grading or drainage. Hillside lots toward Sleepy Hollow and the Ross border often need pier-and-post foundation design and a geotech report; flat lots east of Sir Francis Drake usually move faster. You sign off on final material specs at the end of this stage.

Stage 4: Permit submittal and plan check (2 – 5 months)

We submit to the town and manage every round of comments. Standard plan check is the baseline; creek-adjacent parcels add Marin County flood-control and Fish & Wildlife review, which is where the calendar really stretches. You’ll get a written status update at each correction cycle, not silence.

Stage 5: Permit issuance and pre-construction (1 – 2 weeks)

Once the permit is in hand, we lock the construction schedule, confirm the utility disconnect and inspection sequence, and set the pre-construction walkthrough. You approve the final line-item quote before a single trade mobilizes.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Design and Spec Choices That Drive Your ADU

Most of the cost swing lives in a handful of decisions, and each one has a real trade-off:

  • Detached vs. attached vs. conversion: A conversion is the cheapest path but inherits the existing structure’s problems. A new detached unit costs the most but gives you clean systems and no surprises.
  • Foundation type: Slab or crawl space on flat ground is straightforward. Pier-and-post on a grade is the right call on hillside lots and adds engineering and excavation cost.
  • Exterior cladding: James Hardie fiber cement holds up well against Marin’s wet winters and the WUI ignition-resistant requirements on the wooded slopes. Stucco is cheaper up front but needs more maintenance near the creek.
  • Kitchen and cabinetry grade: A full kitchenette with KraftMaid or Wellborn cabinets reads as a real living space for a renter or family member; a partial setup saves money but narrows who’ll live there.
  • Windows and energy package: Title 24 compliance drives the glazing spec. Better windows cost more now and cut the monthly cost of running the unit for its entire life.

What ADU Design & Permitting Costs in San Anselmo, CA

Plan on $45,000 – $130,000 for the design-and-permit scope through a finished, inspection-ready unit. Five variables push a job toward one end or the other:

  • Foundation and site work: A flat lot east of Sir Francis Drake is one number; a hillside pier-and-post foundation with a geotech report is another.
  • Floodplain and creek review: Parcels in the creek corridor add county flood-control and Fish & Wildlife review, plus possible elevation or drainage work.
  • Unit size and bedroom count: Square footage and a second bedroom move both design fees and construction cost.
  • Existing condition on conversions: Knob-and-tube-era wiring and older framing in a 1920s bungalow mean more discovery and more correction.
  • Material grade: Cabinetry, cladding, and window packages swing the number by tens of thousands.

A written estimate from us lists design fees, engineering, permit and impact fees, and construction line items separately. It does not include utility connection charges set by the district or any change you make after plan check starts. Upfront pricing, no surprises: the number you see is the number you pay.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What San Anselmo Homes Specifically Do to This Job

San Anselmo sits in the San Anselmo Creek watershed at the foot of Mount Tamalpais, and the downtown corridor along Sir Francis Drake Boulevard has flooded repeatedly, including in the 1982 and 2005 storms. That history isn’t trivia for an ADU project. Any unit near the creek triggers county floodplain and creek-permitting review before a footing is poured, and we routinely hit high water tables and un-permitted historic creek culverts when we dig on the flats. The housing stock adds its own layer: early-1900s to 1950s Craftsman and bungalows in the flats mean conversions run into old framing and legacy wiring, while lots climbing toward Sleepy Hollow and the Ross border bring hillside foundation work. Wet winters off Mount Tamalpais make site and drainage work seasonal. We cover all of San Anselmo, ZIP codes 94960 and 94979.

Serving San Anselmo, CA – Our Local Coverage Area

We serve San Anselmo and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked: ADU Design & Permitting in San Anselmo

Get Your ADU Estimate in San Anselmo

Start with a free on-site estimate. We’ll walk the lot, check your zoning and floodplain status, and give you a written line-item quote for ADU design & permitting in San Anselmo before any drawings begin. Call (866) 320-2646 and a live person answers, day or night. Homeowners often pair the unit with Home Additions & ADU in San Anselmo, or scope the rest of the house alongside Full Kitchen Remodeling in San Anselmo and Cabinets & Countertops in San Anselmo. Our Home Additions & ADU team handles the full scope from foundation to finish line.

Written by the team at Groundwork Construction Co.

Why San Anselmo Chooses Groundwork Construction Co. of San Francisco

We set the standard for ADU design & permitting in San Anselmo.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in San Anselmo

Getting your ADU design & permitting project started is simple.

1

Call or Request a Free Estimate

Tell us about your ADU design & permitting project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local ADU design & permitting pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What San Anselmo Customers Say

Trusted by homeowners across San Anselmo and surrounding areas.

★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong
★★★★★

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

Robert Sullivan

Ready for ADU Design & Permitting in San Anselmo?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in San Anselmo.

(866) 320-2646

Request a Free Estimate in San Anselmo

Tell us about your ADU design & permitting needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Us
Local Service Coverage
Call Now - 24/7 Dispatch