A Groundwork company - serving San Francisco, CA
ADU Site Prep & Utilities in San Anselmo, CA | Groundwork Construction Co. of San Francisco

ADU Site Prep & Utilities in San Anselmo - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Kitchen remodelingKitchen remodeling
Bathroom remodelingBathroom remodeling
Home additions & ADUHome additions & ADU
RoofingRoofing
Windows & doorsWindows & doors
Driveway & paversDriveway & pavers
FenceFence
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

ADU Site Prep & Utilities in San Anselmo: What It Costs and How It Goes

ADU Site Prep & Utilities in San Anselmo typically runs $45,000 – $130,000, and the work takes six to fourteen weeks before any framing starts. That covers utility trenching, foundation and site drainage, and the inspections that go with them. In San Anselmo the number hinges on one thing more than any other: how close the lot sits to San Anselmo Creek. Call (866) 320-2646 for a free on-site estimate.

Call (866) 320-2646

How we run site prep and utility work, stage by stage

Site work is where an ADU is won or lost. Get the trench and the drainage right and the build flows. Get them wrong and you’re digging again in year two. Here’s the sequence we follow.

Stage 1: Site survey and utility locate (2 – 5 days)

We start by mapping what’s already underground: the main sewer, water lateral, gas, and any storm lines. On flat lots east of Sir Francis Drake Boulevard, that means finding old creek culverts and drain lines that don’t show on any drawing. You decide where the ADU footprint lands relative to those lines, because moving the building is always cheaper than rerouting a sewer main.

Stage 2: Permit set and floodplain review (3 – 8 weeks)

This is the long pole in San Anselmo. If any part of the work touches the creek corridor, your plans go through county floodplain review before we can break ground. We build the site and utility drawings to match what the reviewers ask for, so you’re not resubmitting twice. You sign off on the final site plan here.

Stage 3: Demo, clearing and erosion control (3 – 7 days)

Old patios, sheds, and fences come out. We install silt fencing and a stabilized entry before we move any dirt, which matters on these lots. You’ll want to decide early whether the existing driveway survives construction traffic, because we can protect it or plan on replacing it.

Stage 4: Trenching and utilities (1 – 3 weeks)

Water, sewer, gas, and electrical get trenched to the ADU location, sloped to spec, and bedded properly. Power is the sleeper cost: if the panel needs a heavier service or the run exceeds roughly 100 feet, the electrical line item climbs fast. You pick between trenching hard pipe and the shallower direct-burial conduit here, and we walk you through the depth, code, and inspection implications of each.

Stage 5: Foundation, drainage and final inspection (2 – 4 weeks)

Footings go in, drainage gets tied into a legal outfall, and the site is graded so water leaves the ADU, not the reverse. The final utility and foundation inspections close out this scope. From there, the build moves forward as part of a full Home Additions & ADU in San Anselmo, which is where framing and finish take over.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The choices that actually change your site prep

Site work has fewer aesthetic decisions than kitchens, but the utility and foundation calls you make here are the ones you live with. Here’s what we walk through with you.

  • Trench vs. direct-burial conduit: Trench and hard pipe costs more up front but handles settling and future repair cleanly. Direct burial is faster and cheaper in the short run, but it’s harder to service if something fails. Most San Anselmo hillside lots steer us toward the trench.
  • Foundation type: Slab is the least expensive and works on the flat alluvial lots downtown. Pier-and-post or a stepped stem wall is what hillside lots toward Sleepy Hollow demand, and it costs meaningfully more. The soil and grade decide this more than preference does.
  • Electrical service sizing: A standard 100-amp feeder covers a small ADU. If you’re planning electric heat, an induction range, or an EV charger, we size up. The wire and panel cost grows with the load, so decide this before we trench.
  • Drainage and outfall: French drains, dry wells, and grade swales all solve water, but they fail differently. On high-water-table lots near the creek, a legal outfall can be the hardest single item to permit.
  • Sewer connection: Gravity to the main is cheapest. A lift pump adds equipment and maintenance, but it’s sometimes the only option when the ADU sits below the sewer invert.

What ADU Site Prep & Utilities costs in San Anselmo, CA

Expect $45,000 – $130,000 for the site and utility package on a San Anselmo ADU, separate from the building itself. A straightforward flat-lot job with short utility runs lands near the low end. Creek-adjacent, floodplain-reviewed, or steep hillside lots push toward the top. Five things move the number:

  • Distance and depth of utility runs: Long runs and deep trenching on sloped lots add days and dollars.
  • Existing site condition: Un-permitted culverts, old foundations, or buried debris all mean extra excavation and disposal.
  • Floodplain and creek review: Marine County floodplain and creek permitting adds design and review time, and often engineered drainage requirements.
  • Foundation type: Pier-and-post on a steep lot costs more than a flat slab, and the soil conditions decide it.
  • Electrical service upgrades: A panel or service upgrade in preparation for the ADU is a real line item, not a rounding error.

Our written estimates list each line: excavation, trenching, pipe and conduit, electrical service work, foundation, drainage, and inspection fees. What’s typically not included: the ADU building itself, interior finishes, and any retrofits discovered mid-dig. We keep that last category honest by pricing knowns and flagging unknowns before work starts. Upfront pricing, no surprises: the number you see is the number you pay, backed by the 730-Day Done Right Promise. Call (866) 320-2646 for an exact quote.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What San Anselmo homes specifically do to this job

Most of our site prep here happens on lots that google won’t tell you about. The flats east of Sir Francis Drake Boulevard sit on a flood-prone alluvial flat, and the downtown corridor has flooded repeatedly in major storms. That single fact drives permitting: work near the creek triggers county floodplain and fish-and-wildlife review that neighboring towns like Fairfax or Ross mostly skip. On the flats you’ll also hit high water tables and old un-permitted creek culverts when you dig, which means the drainage plan has to be engineered, not improvised. Up the slopes toward Sleepy Hollow and the Ross border, the housing stock shifts to mid-century and later custom homes on pier-and-post foundations, where the flat-lot wood-framed house meets hillside structural work. Wet atmospheric-river winters off Mount Tamalpais make grading and drainage seasonal here, and storm-driven. The WUI requirements along the wooded slopes affect exterior and roofing choices, but they start with how the site drains and how the utility runs are protected. This is where our technicians’ up to 12 years of experience and our brand partners, including James Hardie and KraftMaid, keep the site and the build aligned.

Serving San Anselmo, CA – Our Local Coverage Area

We serve San Anselmo and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently asked: ADU Site Prep & Utilities in San Anselmo

Get a free site prep estimate in San Anselmo

We’ll come out, walk the lot, and map the utility runs before you spend a dime. You’ll get a written, line-item estimate for ADU Site Prep & Utilities in San Anselmo, and straight answers on floodplain review and drainage. Calls are answered by a live person, 24/7. Reach the team at (866) 320-2646. Homeowners often pair this with a Small & Partial Kitchen Remodels in San Anselmo or a Full Bathroom Remodeling in San Anselmo once the ADU is standing.

For the wider picture across our Home Additions & ADU service, or to see everything we do in San Anselmo, start there.

Written by the team at Groundwork Construction Co.

Why San Anselmo Chooses Groundwork Construction Co. of San Francisco

We set the standard for ADU site prep & utilities in San Anselmo.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in San Anselmo

Getting your ADU site prep & utilities project started is simple.

1

Call or Request a Free Estimate

Tell us about your ADU site prep & utilities project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local ADU site prep & utilities pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What San Anselmo Customers Say

Trusted by homeowners across San Anselmo and surrounding areas.

★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong
★★★★★

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

Robert Sullivan

Ready for ADU Site Prep & Utilities in San Anselmo?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in San Anselmo.

(866) 320-2646

Request a Free Estimate in San Anselmo

Tell us about your ADU site prep & utilities needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Us
Local Service Coverage
Call Now - 24/7 Dispatch