A Groundwork company - serving San Francisco, CA
ADU Site Prep & Utilities in San Francisco, CA | Groundwork Construction Co. of San Francisco

ADU Site Prep & Utilities in San Francisco - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Kitchen remodelingKitchen remodeling
Bathroom remodelingBathroom remodeling
Home additions & ADUHome additions & ADU
RoofingRoofing
Windows & doorsWindows & doors
Driveway & paversDriveway & pavers
FenceFence
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

ADU Site Prep & Utilities in San Francisco: What It Takes Before You Build

ADU site prep and utilities in San Francisco is the work that turns a tight, steep lot into a buildable platform: excavation and shoring, foundation and flatwork, plus the water, sewer, gas and electrical runs a new unit needs. Realistically it runs 3 to 6 months before framing, and it costs $53,100 to $153,400 depending on slope, soil and how far the utility tie-ins have to travel. Call (866) 320-2646 to get a free on-site estimate.

Call (866) 320-2646

How We Sequence ADU Site Prep & Utilities in San Francisco

This isn’t the framing and finish stage, and it isn’t the design stage. It’s the physical groundwork, and the order matters because a mis-sequenced utility trench can force you to reopen a freshly poured slab. Here’s the sequence we run.

Stage 1 – Site survey and utility locate (days 1-3). We call 811 to mark existing gas, electric, water and sewer. On a typical San Francisco hillside lot, that survey often turns up undocumented laterals from an earlier era. You decide nothing yet; this stage sets the whole plan.

Stage 2 – Demolition and clearing (week 1-2). Out comes the old concrete patio, failing retaining wall, dying tree, or rear deck. If the lot previously held a shed or non-permitted structure, we remove it to grade. You confirm what stays and what goes.

Stage 3 – Excavation, shoring and grading (weeks 2-6). On sloped ground, shoring is often non-negotiable to protect the neighbor’s foundation. We cut the pad, bench the slope, and hold the grades for drainage. You’ll review the grading plan and confirm drainage discharge points.

Stage 4 – Foundation and utility rough-in (weeks 4-10). We set footings, pour the slab or stem walls, and run water, sewer, gas and electrical conduit to the meter and main. Inspection happens before backfill. You’ll choose meter location, panel amperage and whether gas is included or you’ll go all-electric.

Stage 5 – Final backfill, flatwork and inspection (weeks 8-12). Backfill, compact, restore sidewalk or driveway edges, and pass final grading and utility inspections. Then the site is ready for the ADU structure itself.

If you’re planning a kitchenette or bath inside the finished unit, homeowners often pair this with Small & Partial Kitchen Remodels in San Francisco once the shell is up. The point is that site prep and utilities should be scheduled as part of a full Home Additions & ADU in San Francisco, not as a stand-alone afterthought.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Site Prep and Utility Options You’ll Choose Between

By the time we’re on site, you’re making real decisions. Here’s what they are and where the trade-offs land.

  • Foundation type: slab-on-grade vs. raised/crawlspace. A slab is cheaper and faster on a flat lot. A raised foundation costs more but works on San Francisco slopes and gives you room for underfloor utilities.
  • Shoring: soldier piles vs. temporary timber shoring. Timber shoring is faster and cheaper; soldier piles cost more but hold longer for deep cuts and protect adjacent structures.
  • Water and sewer lateral: trench-to-main vs. directional bore. Open trench is simpler and less costly, but on tight urban lots and through planted or paved areas, directional bore is often the only option that keeps the yard intact.
  • Electrical service: dedicated new meter vs. subpanel from the main house. A new meter is cleaner and simpler to bill separately, and it’s required for many rental ADUs; a subpanel is cheaper but ties the unit to your existing service.
  • Gas vs. all-electric. All-electric is cheaper to prep and easier to permit on an ADU; gas adds line work and a separate utility sign-off.
  • Retaining wall material: pressure-treated timber vs. concrete vs. segmental block. Timber ages out in 10 – 15 years; concrete and block cost more up front and hold far longer.
  • Drainage: surface swale vs. French drain vs. dry well. Swales are cheapest but need grade; French drains and dry wells cost more and handle San Francisco’s wet season far better.

Where the ADU facade is visible, we spec James Hardie fiber cement for the exterior skin because the local fog and salt air will eat a lesser product. Our technicians have up to 12 years of experience, and we bring in the same brand-partner discipline across every trade.

What ADU Site Prep & Utilities Costs in San Francisco, CA

ADU site prep and utilities in San Francisco typically costs $53,100 – $153,400. That range covers excavation and shoring, foundation and flatwork, and the utility ties for a new unit. Where a job lands inside it depends on five variables:

  • Slope and soil. Flat lot with good soil: near the low end. Steep hillside with rock or fill: the high end, because shoring and underpinning can add $15,000 – $40,000.
  • Distance to mains. Utility tie-ins are priced per foot. A meter within 20 feet of the unit is a very different number than one 90 feet away through a paved side yard.
  • Existing site condition. Demolishing an old patio is fast; removing a non-permitted structure or failed retaining wall adds weeks and cost.
  • Material grade. Pressure-treated timber and standard concrete vs. engineered block retaining walls and premium drainage systems.
  • Permit scope and planning. A discretionary review, a hillside area permit, or a soft-story retrofit conflict can push the permit stage out and add fees.

A written line-item estimate from us includes excavation, shoring, foundation, flatwork, utilities to the property line, drainage, backfill and inspection. It usually does not include SDAT fees or utility company capacity charges, which are billed separately by the city and utility.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What San Francisco Homes Specifically Do to This Job

San Francisco site prep starts with the fact that most residential lots sit on one of the city’s steep western or northern hills, and almost nobody is building on open flat land. The rear yards off Corona Heights, Noe Valley and the hills of Bernal are narrow and sloping, so the first excavation cut is usually a real shoring job, not a scrape. The housing stock around you is a dense mix: 1880s – 1920s Victorian and Edwardian wood-frame rowhouses with brick foundations, 1950s – 70s stucco-over-wood buildings, and modern downtown towers. Your ADU shares soil and structure with those neighbors, and pre-1906 or post-1906 rebuild era affects how much hidden infrastructure the site survey finds.

Permitting adds its own timeline. Discretionary review and neighborhood design review can hold a shovel out of the ground for a year or more before site work even starts. The soft-story retrofit mandate on older multifamily buildings means some properties already have foundation work records that must be reconciled with the new ADU foundation. On the foggy west side, salt air and persistent damp force us to spec stainless fasteners and galvanized flashing even on small jobs; a standard steel bracket on an exposed garden wall will start to fail in a fraction of the normal lifespan. That’s a real budget line, and it’s why we plan for it on San Francisco jobs up front rather than after the first wet winter.

Serving San Francisco, CA – Our Local Coverage Area

We serve San Francisco and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked Questions – ADU Site Prep & Utilities in San Francisco

Get a Free Estimate for ADU Site Prep & Utilities in San Francisco

Call (866) 320-2646 and we’ll schedule a free on-site estimate. We walk the lot, locate the utilities, review the slope and talk through the permit approach. You’ll get a written, line-item price and an honest schedule before you commit to the build. A live person answers 24/7, every job is backed by our 730-Day Done Right Promise, and there’s $1,000 off projects over $10,000 plus 0% financing for 18 months.

Written by the team at Groundwork Construction Co.

Why San Francisco Chooses Groundwork Construction Co. of San Francisco

We set the standard for ADU site prep & utilities in San Francisco.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in San Francisco

Getting your ADU site prep & utilities project started is simple.

1

Call or Request a Free Estimate

Tell us about your ADU site prep & utilities project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local ADU site prep & utilities pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What San Francisco Customers Say

Trusted by homeowners across San Francisco and surrounding areas.

★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong
★★★★★

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

Robert Sullivan

Ready for ADU Site Prep & Utilities in San Francisco?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in San Francisco.

(866) 320-2646

Request a Free Estimate in San Francisco

Tell us about your ADU site prep & utilities needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Us
Local Service Coverage
Call Now - 24/7 Dispatch