Last updated November 17, 2026
Home additions & ADU
Kitchen remodeling
Bathroom remodeling
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Home Additions & ADU Maintenance Schedule: What to Do and When
A new ADU built to code in San Francisco will start showing its first maintenance needs within 18 months. Not because of poor construction, but because San Francisco’s fog, salt air, and seismic micro-movement are unlike anywhere else in the state. New construction isn’t self-maintaining. It’s a machine with a break-in period, and the first two years are when you set the trajectory for the next thirty. This guide maps out exactly what to check, when to check it, and why each task matters, from year one caulking to the five-year inspection items nearly every homeowner skips. If you’ve recently added a unit, or you’re planning one, this is the schedule that keeps it legally habitable and financially sound.
Quick Answer
New ADUs and home additions need a structured maintenance schedule: a first-year checklist focused on settling cracks and wet-area caulking, annual mechanical and safety checks on HVAC, electrical, and water heaters, and five-year inspections of roof penetrations, deck flashing, exterior trim, and foundation drainage. In San Francisco, the local climate and clay-heavy soils add specific risks that shift this schedule compared to other California markets.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Table of Contents
- The First-Year Checklist for New Construction
- Settling Cracks vs. Structural Cracks: How to Tell the Difference
- Annual Mechanical System Checks: What a Landlord Must Maintain
- The Five-Year Inspection Items Most Homeowners Skip
- Maintaining a Garage Conversion ADU vs. a Detached Unit
- What a Maintenance Log Does for You Legally and Financially
- Seasonal Maintenance Calendar for San Francisco ADUs
- Common Mistakes to Avoid
The First-Year Checklist for New Construction
The first 12 to 18 months after an addition or ADU is finished, your building is still finding itself. Wood framing settles, the soil underneath adjusts to the new load, and materials reach equilibrium with San Francisco’s moisture cycles. That’s normal. What matters is knowing which changes are passive settling and which ones need a call before they worsen. We’ve walked through dozens of new builds in San Francisco, and the same handful of items dominate the first-year punch list.
Here’s what to inspect at 30 days, six months, and twelve months:
- Hairline cracks at drywall seams and corners. Check all inside corners where walls meet ceilings, and around window and door openings. Cracks under a sixteenth of an inch are typical settling. Anything wider, or any crack that runs diagonally from a corner, needs a closer look.
- Caulk joints in bathrooms and around the kitchen. Tub surrounds, shower pans, backsplash edges, and sink cutouts. The first six months are when fresh caulk either bonds correctly or shrinks away from the tile. Re-caulk anything that pulls loose. In San Francisco’s damp air, a failed bead around the shower pan leads to hidden water intrusion faster than most homeowners realize.
- Exterior paint and trim response to moisture. Run your hand along the trim at every window and door. New paint can develop pinholes or blistering where the building holds fog against the wall. Touch up immediately. Sunbelt builders forget this; San Francisco’s fogline reminds us every season.
- Storm drains and grading around the new footprint. After the first good rain, walk the perimeter. Water pooling within three feet of the foundation, or any spot that stays soggy for more than a day, means the site drainage needs adjustment.
- Doors and windows that stick. A door that closed smoothly at move-in and binds at month eight is telling you the framing shifted. Sometimes it’s seasonal swelling; sometimes it’s foundation movement. Note it and track it.
Document each inspection with dated photos. That record becomes the backbone of the maintenance log we’ll cover below, and it matters if a tenant ever files a habitability complaint.
Settling Cracks vs. Structural Cracks: How to Tell the Difference
Most cracks in a new addition are cosmetic. Some aren’t. The distinction matters because reacting to cosmetic cracks wastes money and ignoring structural ones wastes far more. In San Francisco, that distinction gets muddier than in most cities because seismic micro-movement is ongoing. Small tremors on a near-weekly basis put cyclical stress on framing that homes elsewhere don’t experience.
Use this comparison:
- Cosmetic (settling): Hairline cracks under 1/16″, vertical or horizontal, at drywall joints. Cracks that appear and stay the same width for months. Cracks in paint or caulk rather than the wall itself. These are normal and repairable with a spackle and paint touch-up.
- Watch-list (monitor): Diagonal cracks radiating from a corner of a door or window. Cracks between 1/16″ and 1/8″. Cracks that appear in more than one room simultaneously. Measure with a pencil mark at the widest point, date it, and re-check in 30 days.
- Structural (call a professional): Cracks wider than 1/8″ anywhere. Any crack that widens by more than 1/16″ in a month. Cracks in concrete foundation walls or slabs. Doors and windows that go from sticking to not latching at all. Horizontal cracks in a foundation or retaining wall, which are often a sign of lateral soil pressure.
When in doubt, get it checked. An inspection costs a fraction of what a structural repair runs, and in San Francisco, where foundation work on older neighborhoods runs into the tens of thousands, catching something early is worth the call. If you’re already planning a new build or an ADU, our Home Additions & ADU in San Francisco team can talk through foundation design before the first pour.
Annual Mechanical System Checks: What a Landlord Must Maintain
If your ADU has its own HVAC, electrical panel, and water heater, those systems are your responsibility as the owner, whether you occupy the unit yourself or rent it out. The legal baseline in California is habitability, and habitability includes functional plumbing, heating, and a supply of hot water. What most landlords don’t realize is that the line between “required” and “optional” maintenance is where the liability lives.
Here’s the split:
- Legally required (must-maintain): Working heating in every habitable room. A water heater that delivers hot water reliably. Safe electrical outlets in every room, with no exposed wiring. Functioning smoke and carbon monoxide detectors (tested monthly, batteries replaced at least annually). Water intrusion prevention through roof, walls, and windows. A functioning plumbing system with no leaks or blockages.
- Optional but smart (protects value): Annual HVAC filter replacement and coil cleaning. Water heater flush every 12 months (San Francisco’s water has moderate mineral content, so annual flushing avoids scale buildup that shortens tank life). Anode rod replacement every five years on tank-style units. GFCI outlet testing every six months. Panel inspection every five years by a licensed electrician.
Do the required items on a documented schedule. Do the optional ones because they save money down the road. A water heater that lasts 12 years instead of 8 because of annual flushing is a real return. The calls that will catch you out, in our experience, are the unglamorous ones: a tenant in a Sunset District ADU who reports the heat failing in February, weeks after the owner skipped a routine filter change.
The Five-Year Inspection Items Most Homeowners Skip
By year five, a new addition or ADU has settled into its rhythm. That’s also when the items nobody looks at start to fail quietly. The roof penetration around your plumbing vent or flue, for example, has been drinking fog for five winters. The deck flashing at the ledger board, if there is one, has been cycling wet and dry. Exterior wood trim has moved in and out with moisture. Foundation drainage in San Francisco’s clay-heavy soils has likely begun to silt up.
Schedule a comprehensive inspection in year five, and repeat it every five years after. It should cover:
- Roof penetration resealing. Every vent, flue, skylight, and pipe boot. The rubber boots on plumbing vents crack after roughly 8 to 12 years in San Francisco’s UV exposure, but checking at year five catches early degradation before leaks begin.
- Deck flashing and ledger attachments. Any deck attached to the new structure needs its flashing inspected and anything loose re-sealed. Water getting behind a ledger board is one of the most expensive silent failures a homeowner can have.
- Exterior wood trim inspection. Probe the trim at every horizontal surface with a screwdriver. Soft wood means moisture has been absorbed. Sand, prime, repaint, or replace as needed. San Francisco’s salt air in the western neighborhoods accelerates this. If your ADU sits within a mile or two of the ocean, treat exterior trim inspection as a three-year item, not a five-year one.
- Foundation drainage. Walk the perimeter drains, check that French drains and downspouts flow freely, and confirm that the grading still slopes away from the foundation. San Francisco’s heavy clay soils absorb slowly, so a small drainage issue that would drain off in most cities lingers here and pressures the foundation.
- Gutters and downspouts. Clean, re-secure, and verify that water exits well away from the building. In our experience, half of the “foundation moisture” calls we see trace back to a downspout dumping right at the corner of the addition.
These items are all cheap to address proactively and expensive to address after a failure. A resealed pipe boot costs a fraction of what ceiling repair after a slow leak runs.
Maintaining a Garage Conversion ADU vs. a Detached Unit
A garage conversion ADU and a detached ADU share the same legal requirements but not the same failure modes. In San Francisco, where the vast majority of newly permitted ADUs are conversions of existing garages rather than new freestanding builds, this distinction shapes your maintenance schedule.
Garage conversions:
- Slab-on-grade moisture management. A concrete slab that was poured for a car was never designed to be a living surface. Moisture wicks up through it during the winter. Check for condensation under furniture and along the walls, and run a dehumidifier during the wet months. Any finish flooring laid directly on the slab without a moisture barrier will fail faster than you’d expect.
- Shared wall insulation performance. The wall between the ADU and the main house is usually insulated on both sides for sound and thermal separation. Verify the insulation hasn’t sagged, and re-caulk any gaps that have opened at the wall-ceiling line. Thermal separation between the main house and the ADU affects both energy bills and tenant comfort.
- Soundproofing degradation. In a garage conversion, the ceiling and shared wall were likely built out with resilient channel or double drywall to manage sound. Over time, caulk pulls, doors gaps, and any penetration (new outlets, a TV mount) can degrade that performance. Inspect annually and re-seal.
- Ventilation. A garage conversion needs active ventilation to manage moisture. Check that the exhaust fan in the bathroom actually exhausts to the exterior rather than back into the ceiling cavity. It’s an item we’ve seen missed more than once.
Detached units:
- Roof maintenance moves to the front of the list. A detached structure takes full sun and rain on all four sides. Inspect the roof annually, not just every five years.
- Exterior envelope needs more frequent inspection. Paint, siding, and caulk on all four walls, not just two. Western and southern exposures on a detached ADU degrade faster in San Francisco’s sun-and-fog cycles.
- Utility shutoffs are separate. Know where the water, gas, and electrical shutoffs are on the detached unit, because they’re not the same as the main house’s. Document them in the maintenance log.
What a Maintenance Log Does for You Legally and Financially
A maintenance log is the cheapest insurance a landlord can keep. It’s a simple running document, dated, itemized, with photos. It takes perhaps 20 minutes every few months to keep current, and it protects you in two ways that most homeowners don’t fully appreciate until they need it.
Legally: If a tenant files a habitability complaint, the legal question usually isn’t whether the building had an issue. It’s whether the owner acted reasonably and promptly once they knew, or should have known. A maintenance log demonstrates that you had a schedule, followed it, kept records, and responded. In San Francisco, where tenant protections are stricter than most of the state, that record is significant. It’s the difference between “we didn’t know” and “here is the dated record of every inspection, every repair, and every response.”
Financially at resale: San Francisco appraisers and buyers treat a documented maintenance history as evidence of value. A well-maintained ADU with a log showing routine inspections and systems serviced on schedule will appraise higher and sell faster than an identical unit with no records. That’s not marketing talk; it’s what we’ve seen at valuations across the city.
Here’s what a practical log looks like:
- Date and inspection type. First-year 30-day check, annual mechanical, five-year envelope.
- What was observed. “Crack at northwest corner of bedroom door, 1/16″, marked with pencil.”
- What was done, and by whom. “Resealed with caulk and repainted by interior finish tech.”
- Photos. One close-up at each item, dated.
- Receipts and work orders. Especially for any licensed trade work (HVAC, electrical, plumbing), because the permit trail supports the record.
Keep the log in two places: digital and paper. Paper in a drawer inside the ADU for tenant and inspector access; digital for backup.
Seasonal Maintenance Calendar for San Francisco ADUs
San Francisco doesn’t have the four-season cycle most of the country does, but it does have predictable moisture patterns, and a maintenance calendar should follow them. Here’s what to check and when.
January through March (wet season):
- Inspect for water intrusion at windows, doors, and roof penetrations after every heavy rain.
- Verify gutters and downspouts flow freely; clear debris from the first storms.
- Test the sump pump or any foundation drainage before the peak of the wet season, not during it.
- Run the dehumidifier in the garage conversion if you see condensation.
April through June (transition):
- Inspect exterior paint and trim for winter damage and touch up before the dry season.
- Service the HVAC system and replace filters.
- Flush the water heater.
- Walk the perimeter and re-grade any settling spots.
July through September (dry season):
- Inspect the roof, gutters, and deck flashing. This is the best window to do any roof work.
- Reseal exterior wood, especially on the western exposures.
- Test all smoke and CO detectors, replace batteries.
- Check the electrical panel for any signs of heat or oxidation.
October through December (return of moisture):
- Pre-wet-season inspection: roof, drains, grading, caulk.
- Rake leaves from gutters and downspouts before the first rains.
- Confirm tenant communication line for any leaks is active.
For related exterior work, our Fence Installation in San Francisco team handles boundary fences and gates whose maintenance cadence ties directly to your ADU’s exterior envelope, and our Driveway & Pavers in San Francisco team manages the hardscape and drainage interfaces that keep water moving away from your addition. If you’re still in the design phase, start at the Groundwork Construction Co. of San Francisco home page to see how we approach full-scope builds.
Common Mistakes to Avoid
- Treating new construction as self-maintaining. A new ADU in San Francisco starts showing maintenance needs within 18 months. Don’t wait for a leak to remind you.
- Confusing settling cracks with foundation movement. Most cracks under 1/16″ are cosmetic. Cracks that widen month over month are not. Measure and date them.
- Skipping wet-area caulk in year one. Bathroom and kitchen caulk fails early. In San Francisco’s fog, a failed seam around a shower pan means hidden water intrusion within months, not years.
- Ignoring downspout discharge. A downspout dumping at the corner of a garage conversion ADU presses moisture against the slab, and that shows up as condensation and flooring failure two years later.
- Assuming the five-year inspection will happen on its own. No one schedules it for you. Roof penetrations, deck flashing, and exterior trim all degrade silently. A proactive check is a fraction of a reactive repair.
- Not documenting tenant communication. In San Francisco’s tighter habitability climate, documented notice-and-response protects both landlord and tenant. Keep every email, every work order, every photo.
- Skipping the log because it feels bureaucratic. A dated maintenance record affects valuation and habitability disputes. It’s not paperwork for its own sake; it’s a financial asset.
See the difference
Before
After
Before
After
Before
AfterWhen to Call a Professional
Some items deserve a call, even to a handyperson, and others should really be a licensed trade. Call a professional immediately for any crack that widens from one month to the next, any water intrusion that appears inside the unit after a storm, any electrical smell or glowing at the panel, any roof penetration that shows dampness in the ceiling below it, and any HVAC or water heater failure that affects tenant habitability. Do not open the electrical panel yourself; do not attempt roof repairs let alone full roof work on a steep pitch. The safety risk is real and the cost of a proper repair is small by comparison.
For non-urgent scheduled maintenance, annual checkups, and any addition or ADU project on the horizon, Groundwork Construction Co. of San Francisco offers free estimates in San Francisco. Call (866) 320-2646 to schedule, and a live person answers around the clock. Our technicians have up to 12 years of experience, and every project we deliver is backed by our 730-Day Done Right Promise. If it’s not done right, we make it right.
Frequently Asked Questions
The first inspection should happen at 30 days, with follow-up checks at six months and twelve months. New construction goes through a settling period, and the first 18 months are when wet-area caulk, drywall seams, and exterior paint reveal how they’re holding up. In San Francisco, the first wet season accelerates those checks. Call (866) 320-2646 to schedule a first-year inspection walkthrough.
A settling crack is typically a hairline crack under 1/16″ wide at a drywall joint, vertical or horizontal. A structural crack is anything wider than 1/8″, any diagonal crack radiating from a corner, or any crack that widens month over month. When in doubt, get it checked. A professional inspection is a small cost next to what a structural repair runs. Call (866) 320-2646 for a free estimate on an inspection.
California habitability law requires functioning heating, plumbing, hot water, safe electrical outlets, working smoke and CO detectors, and prevention of water intrusion. Optional upkeep (annual HVAC filter changes, water heater flushing, GFCI testing) improves longevity and resale value but isn’t legally mandated. Document both. The maintenance log protects you in a habitability dispute. For help building a maintenance schedule, call (866) 320-2646.
San Francisco’s combination of year-round fog, salt air in the western neighborhoods, and seasonal moisture cycles means exterior paint, caulk, and wood trim degrade faster than in inland California. Salt air accelerates corrosion on exterior metal. Fog keeps surfaces wet longer. Southern and western exposures particularly need inspection at shorter intervals. Plan for exterior inspection every three years within a mile of the ocean, not every five.
Yes. Garage conversions need slab-on-grade moisture management, annual inspection of the shared wall’s insulation and soundproofing, and verification that bathroom exhaust vents to the exterior. Detached units need more frequent roof and full-envelope checks because all four sides take the weather. Both share the same habitability requirements. If your conversion is still on paper, our team can walk through the schedule with you before construction begins. Call (866) 320-2646.
Indefinitely. Appraisers and buyers treat a documented maintenance history as evidence of value. Every year of logged inspections, repairs, and photos adds to that record. A well-maintained ADU with a complete log appraises higher and sells faster than an identical unit with no records. Start the log at move-in, keep it current every few months, and store both a paper and a digital copy. Call (866) 320-2646 to discuss a maintenance plan before you close out the build.
The Bottom Line
A new ADU or addition isn’t a finished product; it’s a system that needs a schedule. The first year catches settling and caulk issues. The annual mechanical checks keep the unit legally habitable. The five-year inspection catches the silent failures in roof penetrations, deck flashing, and exterior trim before they become expensive. Garage conversions and detached units each have their own maintenance modes. And a documented log protects you both in a tenant dispute and at resale. Put the calendar on your phone, take photos, keep the log current, and you’ll get decades of reliable service out of the unit. For any inspection, addition, or new ADU project in San Francisco, we offer free written estimates and live-answered calls around the clock. Call (866) 320-2646 to schedule yours.
Written by the team at Groundwork Construction Co. of San Francisco.