Home additions & ADU
Kitchen remodeling
Bathroom remodeling
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
CWS Home Additions & ADU: The San Francisco Owner’s Guide
We build and finish CWS-compatible home additions and ADUs in San Francisco, with installed projects typically landing between $53,100 and $153,400 for an addition and $106,200 to $259,600 for a full ADU. When CWS owners call us, it’s usually not a single “part” that failed but a system: a failed sill detail letting Bay fog moisture into framing, a flat roof tie-in leaking at the addition seam, a conversion that never got permitted. We handle the diagnosis, the plans, and the fix under one roof, backed by our 730-Day Done Right Promise.
Which CWS Models This Applies To
CWS builds additions and ADUs across a range of series and configurations, and the “model” that matters most for a San Francisco rebuild is the physical spec sheet, not a serial number. What we need is the original permit set, the addition’s footprint and ceiling height, the exterior cladding (CWS favors James Hardie and CertainTeed products on newer envelopes), and whether the unit is attached, detached, or a garage conversion. If the paperwork is lost, we measure and document from the structure itself before quoting.
Then comes the OEM-vs-aftermarket call. For structural and envelope components – framing, sheathing, windows, roofing – we match CWS’s original spec and substitute only with equal-or-better products from the same brand tier: Andersen or Pella for windows, GAF or CertainTeed for roofing. We don’t carry parts or stock; every component is sourced to spec per job, which means what goes in your addition matches what CWS designed, not whatever’s on a shelf. Groundwork Construction Co. of San Francisco is an independent service provider and is not affiliated with CWS.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your CWS Home Additions & ADU Is Failing
San Francisco’s marine layer and winter rain punish additions harder than most owners expect, and CWS structures are no exception. Here’s what we see most:
- Water staining or soft drywall near the addition seam. Usually a failed flashing or roofline tie-in where the new envelope meets the original house – the number one leak point we find in San Francisco.
- Musty smell or condensation in the new room. Often undersized ventilation or a missing vapor barrier, common in closed-off garage conversions.
- Sticking doors and hairline cracks at corners. Can signal foundation settling or a framing detail that didn’t account for our expansive soils.
- Cold floors and drafts at exterior walls. Insulation gaps or single-pane windows that were spec’d to code minimums, not comfort.
- Permit red flags at resale or inspection. Unpermitted work – especially ADUs – surfaces at appraisal and can stall a sale outright.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included
Here’s what San Francisco owners actually pay when we take on a CWS addition or ADU project. Every number is upfront, and you’ll see a written line-item quote before work starts.
- Home Addition: $53,100 – $153,400
- ADU Construction: $106,200 – $259,600
- Garage Conversion (to ADU or living space): $35,400 – $94,400
The range depends on footprint, foundation work, whether we’re correcting unpermitted conditions, and finish level. Our technicians have up to 12 years of experience, and every project is covered by the 730-Day Done Right Promise – if something’s not right, we make it right. We also offer 0% financing for 18 months and $1,000 off projects over $10,000 to keep a large build within reach.
DIY or Call Us?
Some checks are safe and smart: photograph the water stains, note where the seam leaks, measure the room, and dig up any permit paperwork. What isn’t safe or wise is opening walls, re-flashing a roofline, or touching framing and electrical on a structure this load-bearing. Addition and ADU work involves structural, waterproofing, and permit decisions that go wrong quietly and expensively when handled piecemeal – and unpermitted fixes can cost you at resale. Call us at (866) 320-2646 for a free estimate and we’ll tell you straight what’s failing and what it takes to fix it right.
FAQs
How long should a CWS addition or ADU last? A properly built and maintained addition should hold up for decades – 50 years or more for the structure itself – though envelope details like flashing and roofing need service far sooner. In San Francisco’s wet, foggy climate, expect to inspect roof tie-ins and exterior seals every few years. Call (866) 320-2646 for an assessment.
Can it be repaired instead of rebuilt? Often yes. Localized leaks, flashing, insulation, and finish issues are frequently repairable without tearing down the structure, and we’ll tell you honestly when repair beats rebuild. Structural or unpermitted problems may push toward a larger scope. Call (866) 320-2646 for a free estimate.
How long does the work take? Small repairs can finish in a visit or two; a full addition or ADU runs weeks to months depending on permits and scope. We sequence around San Francisco inspection timelines and give you a schedule up front. Call (866) 320-2646 to talk through your project.
How do you source the right parts and materials? We match your CWS spec sheet and spec equal-or-better components from verified brand partners – James Hardie, GAF, CertainTeed, Andersen, Pella, and others. We don’t stock parts; each is sourced to your job. Call (866) 320-2646 for a free estimate.
Written by the team at Groundwork Construction Co. of San Francisco, serving San Francisco and nearby areas.