A Groundwork company - serving San Francisco, CA
Full Bathroom Remodeling in Novato, CA | Groundwork Construction Co. of San Francisco

Full Bathroom Remodeling in Novato - Fixed Price, One Bathroom at a Time

Free in-home consult and a written, line-item quote before demo starts. We work one bathroom at a time so your house stays livable, and the signed price is the final price. Licensed, insured, permits handled.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Bathroom remodelingBathroom remodeling
Kitchen remodelingKitchen remodeling
Home additions & ADUHome additions & ADU
RoofingRoofing
Windows & doorsWindows & doors
Driveway & paversDriveway & pavers
FenceFence
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Full Bathroom Remodeling in Novato: What It Costs and How Long It Takes

Full bathroom remodeling in Novato typically runs $9,000 to $28,000 and takes six to nine weeks from demo to final walkthrough, longer if we’re moving plumbing or opening walls in an older home. The number that matters is the one in your written estimate: a standard hall bath off San Marin or a master suite in the hills above downtown both fall in that range, just at opposite ends. Call (866) 320-2646 for a free on-site estimate; we’ll walk the room, check what’s behind the walls, and put real numbers in writing before anyone touches a tile.

Call (866) 320-2646

How a Full Bathroom Remodel Actually Runs, Stage by Stage

Bathrooms are small rooms with a lot of systems stacked in them, so the order of work matters more here than in almost any other remodel. Here’s the real sequence we follow, with what it takes and what you’ll be deciding along the way.

Stage 1: Site protection and demo (2 – 3 days)

We seal off the room, protect the hallway and any flooring along the path, and shut off water at the fixture valves before anything comes out. Demo removes the old vanity, toilet, tub or shower surround, tile, and drywall down to studs where the plan calls for it. This is when we find out what the last remodel hid – old galvanized lines, a pan that leaked, or a floor that needs sistering. You’ll approve any change in writing before we proceed.

Stage 2: Rough-in plumbing, electrical, and framing (3 – 5 days)

If we’re relocating the shower, moving the toilet, or adding a second sink, this is where it happens. A new drain line means cutting into the floor; a relocated fixture means running new supply and vent lines. Electrical rough-in covers GFCI protection, exhaust fan and its duct run, vanity lighting, and any heated floor mat. Framing goes in for niches, a bench, or a pony wall. This stage is the biggest cost lever in the whole job, and the one where your decisions need to be final.

Stage 3: Inspection and waterproofing (2 – 4 days, plus scheduling)

The rough plumbing and electrical get inspected before anything closes up. Waterproofing comes next: a bonded membrane on the shower walls and pan or the tub surround, with a flood test on shower pans before tile. Skip this step or rush it and you’ll be tearing out a finished wall in three years. We pull the permits and coordinate the inspection – it’s not something you’ll need to chase.

Stage 4: Tile, finishes, and fixture setting (10 – 15 working days)

Tile goes up on walls and floor, then grout cures, then we set the vanity, toilet, shower valve, trim, glass, and lighting. Fixture lead times are the biggest scheduling wildcard on the whole job – a special-order vanity or a slab of Cambria quart for the counter can add weeks if it’s not ordered before demo starts. You’ll pick finishes at the estimate stage or shortly after so nothing stalls.

Stage 5: Punch list and final walkthrough (1 – 2 days)

We test every fixture, check slope on the shower pan and the drain, verify the fan actually vents outside, and walk the room with you line by line. Anything on the list gets fixed before we call it done. Your work is covered by our 730-Day Done Right Promise – if something we installed isn’t right, we make it right.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Options You’ll Choose Between

Most of the decisions come down to a handful of real trade-offs. Here’s what actually matters:

  • Tile vs. large-format porcelain vs. slab. Ceramic and porcelain tile are the value play and hold up well; large-format porcelain (24×48 or bigger) reads modern and cuts grout lines. Natural stone and slab surrounds look the best and cost the most, and stone needs sealing every year or two. For Novato’s humid marine air, porcelain and glass are the low-maintenance choice.
  • Vanity grade. A stock or semi-custom cabinet is fine for most layouts; a KraftMaid or Wellborn semi-custom lets you fit an awkward alcove exactly and pick the finish. Custom costs 40 – 60% more than stock for the same footprint.
  • Shower base vs. tiled pan. A pre-formed acrylic or fiberglass base is fast, cheap, and sealed by design; a tiled mud-set pan with a linear drain looks better and lasts decades but adds labor and needs a careful waterproofing job.
  • Countertop material. Cultured marble and quartz are the two workhorses; a quartz like Cambria holds up to water and cleaners without sealing. Stone is beautiful but softer on maintenance.
  • Exhaust and heat. A properly sized, ducted-to-outside fan is non-negotiable in a wet room – undersized fans are the number-one cause of peeling paint and mold we see on remodels. Heated floors are a nice add for a cold tile floor in winter.

What Full Bathroom Remodeling Costs in Novato, CA

For a full gut-and-rebuild of a standard bathroom in Novato, budget $9,000 to $28,000. Where you land depends on five variables:

  • Size and layout. A 5×8 hall bath sits at the low end; a master with a double vanity, walk-in shower, and separate water closet pushes toward $28,000.
  • Condition found at demo. Old galvanized or cast-iron drain lines, rotted subfloor, or a failed pan add $1,500 to $6,000 in unseen work.
  • Moving plumbing, electrical, or structure. Relocating a toilet or shower drain, adding a circuit, or moving a wall is the single biggest cost swing – often $2,000 to $5,000 on its own.
  • Material grade. Stock vanity and ceramic tile to the ceiling vs. semi-custom cabinetry and large-format porcelain can be a $6,000 spread in the same room.
  • Permit scope. A cosmetic refresh may not need a permit; moving plumbing or electrical does, and that adds inspection time and a permit fee to the total.

Your written estimate breaks out labor, materials, fixtures, and permit costs line by line, and the number you see is the number you pay. No change orders unless you approve them. We also offer 0% financing for 18 months and $1,000 off projects over $10,000.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Novato Homes Specifically Do to This Job

Novato’s housing stock tells the story before we pick up a hammer. The old military-era duplexes around Hamilton Field were built in the 1940s and ’50s with plumbing that’s well past its service life, and they were never built with the shear detailing or fire-hardened assemblies that current code expects. That means a bath that looks like a straightforward remodel often triggers structural repair and WUI-code upgrades once the walls open – a job that would be a simple fixture swap in San Rafael can become a full retrofit here. The Petaluma Gap wind funnel also means the marine air off the 101 corridor finds its way into venting and exterior penetrations, so we detail the bath fan and any wall transitions carefully. If your bath is part of a larger remodel, our Bathroom Remodeling in Novato page covers the broader scope, and homeowners often pair a bath with Roof Repair in Novato after a winter of wind-driven rain.

Serving Novato, CA – Our Local Coverage Area

We serve Novato and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked – Full Bathroom Remodeling in Novato

Get Your Free Full Bathroom Remodeling Estimate in Novato

Call (866) 320-2646 to schedule a free on-site estimate for full bathroom remodeling in Novato. We walk the room, check the plumbing and venting behind the walls, and hand you a written line-item quote the same visit. You’ll know what your project costs, what the permit requires, and how long the job will take before you commit to anything. Whether you’re ready now or pricing for next spring, the estimate is free and there’s no pressure – just answers. For the full range of services under one roof, look at our Bathroom Remodeling hub, and if your project includes roofing work, homeowners often pair this with Roof Replacement & Installation in Novato.

Written by the team at Groundwork Construction Co.

Why Novato Chooses Groundwork Construction Co. of San Francisco

We set the standard for full bathroom remodeling in Novato.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Novato

Getting your full bathroom remodeling project started is simple.

1

Call or Request a Free Estimate

Tell us about your full bathroom remodeling project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local full bathroom remodeling pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Novato Customers Say

Trusted by homeowners across Novato and surrounding areas.

★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong
★★★★★

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

Robert Sullivan

Ready for Full Bathroom Remodeling in Novato?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Novato.

(866) 320-2646

Request a Free Estimate in Novato

Tell us about your full bathroom remodeling needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Us
Local Service Coverage
Call Now - 24/7 Dispatch