A Groundwork company - serving San Francisco, CA
Full Bathroom Remodeling in Pacifica, CA | Groundwork Construction Co. of San Francisco

Full Bathroom Remodeling in Pacifica - Fixed Price, One Bathroom at a Time

Free in-home consult and a written, line-item quote before demo starts. We work one bathroom at a time so your house stays livable, and the signed price is the final price. Licensed, insured, permits handled.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Bathroom remodelingBathroom remodeling
Kitchen remodelingKitchen remodeling
Home additions & ADUHome additions & ADU
RoofingRoofing
Windows & doorsWindows & doors
Driveway & paversDriveway & pavers
FenceFence
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Full Bathroom Remodeling in Pacifica, CA: What the Job Really Involves

Full bathroom remodeling in Pacifica, CA runs $9,000 to $28,000 for most homes, and a typical project takes 3 to 5 weeks of working time once demolition starts. That covers a complete rebuild of one bathroom: demo down to the studs, new plumbing rough-in, electrical, waterproofing, tile, vanity, fixtures, and finishes. The number moves with size, existing condition, and how far plumbing or walls have to shift. Call (866) 320-2646 to schedule a free estimate.

Call (866) 320-2646

If your project is part of a larger whole-house scope, the wider project lives on our Bathroom Remodeling in Pacifica page. This page stays on the full-gut job.

How the Work Runs, Stage by Stage

Five stages, in order. Each one has a decision point, and the decisions you make early set the budget ceiling for everything after.

Stage 1: Walkthrough and written scope (before day 1)

We walk the bathroom, measure, and note what’s behind the walls as far as we can tell without opening them. This is where we flag the two unknowns that drive most overruns in older homes: whether the existing drain lines are cast iron or older galvanized, and whether the wall behind the tile is drywall or a mud-set bed. You decide the fixture layout and the overall finish level here. A written line-item quote comes out of this visit, with the number you see being the number you pay on the scope we’ve defined.

Stage 2: Demolition and rough-in (days 1 through 3)

Day 1 is demo. The tile, tub or shower, vanity, toilet, and old drywall come out, and we protect the floor path to the door. Days 2 and 3 are where the plumbing gets changed and the electrical gets roughed in. If we’re moving the toilet or the shower drain, that happens now, before anything is closed up. You decide nothing in this window except the finish schedule if you haven’t already, because fixtures need to be ordered soon enough to land before tile.

Stage 3: Inspection and waterproofing (days 4 through 6)

Rough plumbing and electrical get inspected. In Pacifica, most bathroom work is interior and does not trigger a coastal development permit, but a full remodel that alters plumbing, electrical, or framing still needs building permits pulled and inspections passed. After inspection, the waterproofing goes in. We use a bonded sheet or liquid-applied membrane over cement backer, and the critical detail is the pan and the wall-to-floor junction. Water pooling behind tile is the single most common failure we’re called back to fix in this climate.

Stage 4: Tile, drywall, and paint (days 7 through 18)

Tile is where the calendar stretches. A simple layout runs a few days; a herringbone floor, a niche, or a curbless shower pan with a linear drain runs a week or more of setting and grouting. Drywall, prime, and paint follow. You decide grout color, trim detail, and paint here, and this is the stage most likely to slip if a tile order arrives short or broken. We schedule delivery early for exactly that reason.

Stage 5: Fixtures, glass, and final walkthrough (days 19 through 25)

Vanity, toilet, faucets, shower trim, and glass go in. Glass is typically templated after tile is finished and installed a week or two later, so a frameless enclosure can be the last thing in the room. Final walkthrough is where we run water, check every drain for slope, test the fan, and hand over the workmanship warranty. Most jobs land inside a 3-to-5-week working window; a small powder room runs shorter, and a layout change that moves a drain can add a week.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Choices That Actually Change the Outcome

Finish decisions matter less than the things you never see, and the things you never see are where a bathroom either lasts 30 years or starts leaking in year four.

  • Waterproofing system. A bonded membrane over cement backer is standard and reliable. A foam-board system like Schluter Kerdi cuts install time and is fully waterproof at the seams. Liquid-applied membranes cost less in material but depend entirely on correct thickness at the corners, so it’s a workmanship question, not a product one. Ask which one, and why.
  • Tile material. Porcelain is the practical default: dense, low absorption, and it holds up to a damp bathroom. Natural stone (marble, travertine) is beautiful and needs sealing every year or two in a salt-air climate, and it’s softer underfoot, which some people want and some don’t. Large-format tile means fewer grout lines but tighter subfloor tolerances.
  • Shower configuration. A curbless walk-in with a linear drain reads modern and ages well for anyone planning to stay in the home. A traditional curb and center drain costs less and drains faster. Frameless glass is the visual upgrade; framed glass is the budget choice and slightly easier to keep sealed.
  • Vanity and cabinetry. Stock cabinets cost less and arrive fast. Semi-custom lines like KraftMaid or Wellborn let you fit an odd wall and pick the finish, and they hold up better in a humid room than particleboard boxes. Floating vanities look sharp but need blocking in the wall, so decide before drywall.
  • Ventilation. A properly sized exhaust fan ducted to the exterior is not optional in Pacifica’s fog belt, where a bathroom that stays damp grows mold on the ceiling within two winters. Size it to the room and vent it outside, not into the attic.

For the broader category of work, our Bathroom Remodeling service covers the same materials and standards across every scope.

What Full Bathroom Remodeling Costs in Pacifica, CA

A full gut remodel of one bathroom in Pacifica typically lands between $9,000 and $28,000. Here’s the line-item breakdown so you can see where the money goes:

Scope Typical range
Full bathroom remodel, one room $9,000 – $28,000
Vanity installation $800 – $3,000
Shower replacement $3,000 – $8,500
Walk-in shower installation $4,500 – $12,000
Tub-to-shower conversion $3,500 – $10,000

The five variables that push a job toward the high end:

  • Size. A 5×8 hall bath sits at the low end. A primary bath with a double vanity and a large shower pushes up fast.
  • Existing condition. Rot behind the tub surround, a failed subfloor, or a mud-set bed that has to be chipped out adds labor and disposal.
  • Moving plumbing or structure. Relocating a drain, adding a second sink, or opening a wall to widen the room adds rough-in, framing, and a longer inspection cycle.
  • Material grade. Porcelain and a stock vanity versus marble, sem-custom cabinetry, and frameless glass is the difference between the bottom and top of the range.
  • Permit scope. A finish-only refresh may not need permits; anything touching plumbing, electrical, or framing does, and the inspection schedule adds time.

The written estimate includes demo, rough-in, waterproofing, tile, fixtures, and finish carpentry on the scoped items. What it usually excludes: structural repair found after demo, mold remediation, and glass if templated separately. We price those as add-ons in writing before we start, never as surprises. Financing at 0% for 18 months is available, and projects over $10,000 take $1,000 off.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Pacifica Homes Specifically Do to This Job

Pacifica’s housing stock shapes this work in ways that inland Peninsula cities don’t see. The town is a mix of mid-century stucco-and-wood ranches and split-levels from the 1950s through the ’70s, plus older beach cottages tucked into Rockaway and Linda Mar. Those homes came with small bathrooms by today’s standards, and many still have their original cast iron drains and mud-set tile beds. Opening a wall in a Linda Mar ranch often reveals galvanized supply lines that have narrowed to a pencil’s width, so the plumbing scope grows before the finish scope does.

The climate adds its own pressure. Pacifica sits in the coastal fog belt, with cool damp summers and salt-laden onshore winds, and bathrooms in these homes fight moisture all year. A bathroom without a properly ducted fan grows mold on the ceiling within two winters. On bluff-edge and hillside lots, a bathroom renovation itself usually stays interior and doesn’t trigger coastal permits the way a deck or addition would, but if the project touches a load-bearing wall or opens up a cantilevered floor structure, we loop in a structural review before framing. Our teams work throughout Pacifica and know the difference a hillside site makes to scheduling around the winter storms.

Homeowners often pair a bathroom remodel with exterior work caught by the same moisture issues, and we handle Roof Repair in Pacifica for the leaks that show up in the bathroom ceiling, or Roof Replacement & Installation in Pacifica when the roof is past repair.

Serving Pacifica, CA – Our Local Coverage Area

We serve Pacifica and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked – Full Bathroom Remodeling in Pacifica

Get a Free Estimate for Full Bathroom Remodeling in Pacifica

Call (866) 320-2646 to schedule a free on-site estimate for full bathroom remodeling in Pacifica. We walk the room, measure, check the plumbing behind the walls as far as we can, and hand you a written line-item quote with the number you’ll actually pay. No pressure to sign on the spot, no vague language. A live person answers around the clock, and a background-checked, uniformed technician shows up on time.

Written by the team at Groundwork Construction Co.

Why Pacifica Chooses Groundwork Construction Co. of San Francisco

We set the standard for full bathroom remodeling in Pacifica.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Pacifica

Getting your full bathroom remodeling project started is simple.

1

Call or Request a Free Estimate

Tell us about your full bathroom remodeling project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local full bathroom remodeling pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Pacifica Customers Say

Trusted by homeowners across Pacifica and surrounding areas.

★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong
★★★★★

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

Robert Sullivan

Ready for Full Bathroom Remodeling in Pacifica?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Pacifica.

(866) 320-2646

Request a Free Estimate in Pacifica

Tell us about your full bathroom remodeling needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Us
Local Service Coverage
Call Now - 24/7 Dispatch