A Groundwork company - serving San Francisco, CA
New Detached ADU in San Rafael, CA | Groundwork Construction Co. of San Francisco

New Detached ADU in San Rafael - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Kitchen remodelingKitchen remodeling
Bathroom remodelingBathroom remodeling
Home additions & ADUHome additions & ADU
RoofingRoofing
Windows & doorsWindows & doors
Driveway & paversDriveway & pavers
FenceFence
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

New Detached ADU in San Rafael, CA: What It Costs and How Long It Takes

A new detached ADU in San Rafael typically runs $90,000 to $220,000 for a full build, with most of our detached projects landing between $130,000 and $190,000 depending on size, site, and finish level. Plan on 7 to 11 months from first plan submission to final inspection: roughly 3 to 5 months in permitting and 4 to 6 months of construction. Call (866) 320-2646 to schedule a free on-site estimate and design consult.

Call (866) 320-2646

How a Detached ADU Gets Built Here, Stage by Stage

Detached work has a different rhythm than a conversion because you’re building a second structure from the ground up. Here’s the actual sequence we run, with the time each stage takes and the decisions you own along the way.

Stage 1: Site assessment and feasibility (1 to 2 weeks)

We walk the lot, measure setbacks against the zoning envelope, check slope, drainage patterns, and utility stubs, and confirm whether the site can take the footprint you want. This is where you decide size and placement: a 500-square-foot one-bedroom versus an 800-square-foot two-bedroom changes both budget and how the structure sits on the lot. If the placement touches the main house’s service panel or water line, we flag that cost now rather than mid-build.

Stage 2: Design, engineering, and permitting (3 to 5 months)

Plans get drawn, structural engineering gets stamped for the foundation and framing, and the package goes to the city. San Rafael review is layered and documentation-heavy, so we build in time for plan-check comments. You’ll decide the layout, roofline, exterior materials, and whether the unit is designed for rental, family, or aging-in-place. Nothing gets ordered until the permit is in hand.

Stage 3: Site prep, foundation, and utilities (3 to 6 weeks)

Demo and clearing come first, then excavation, footings, and the slab or raised foundation. On sloped lots this is the stage where drainage, retaining, and hillside-foundation work surfaces. Trenching for water, sewer, gas, and electrical runs from the main house back to the new unit. You’ll decide hardscape and how the pathway between the two structures works.

Stage 4: Framing, rough-in, and enclosure (6 to 9 weeks)

Walls go up, the roof goes on, and plumbing, electrical, and HVAC get roughed in and inspected before anything is closed. This is when you choose windows, roofing, and siding samples. Rough inspections happen in sequence, and passing them cleanly is what keeps the schedule honest.

Stage 5: Finishes, punch, and final inspection (6 to 8 weeks)

Insulation, drywall, cabinets, countertops, fixtures, flooring, and paint. Then a punch walkthrough, final inspection, and the certificate of occupancy. You’ll pick finish grades here, and the difference between builder-grade and upgraded finishes is where a lot of the final budget spread lives.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Choices That Shape a Detached ADU

Most of the money and the long-term satisfaction sit in a handful of decisions. Here’s how we frame the trade-offs so you’re choosing with real information.

  • Size and unit count: A 500-square-foot studio keeps foundation, roof, and systems costs down. An 800 to 1,000-square-foot two-bedroom rents for more but pushes structural, foundation, and finish costs up across the board. The sweet spot for most San Rafael lots is a one-bedroom near 600 square feet.
  • Foundation type: Slab-on-grade is the simplest and least expensive where the lot allows. A raised or pier-and-beam foundation costs more but handles slope and drainage far better on hillside lots.
  • Roofing: A composite shingle roof from GAF or CertainTeed is the value play here. Standing-seam metal costs more and lasts longer, and its fire resistance lines up with wildfire-zone expectations in central Marin.
  • Windows and doors: Standard vinyl or fiberglass windows keep the budget in check. Upgraded units with better glazing reduce heat gain and sound, which matters if the unit sits near a road or rental tenants care about comfort.
  • Kitchen and bath fixtures: Builder-grade fixtures work fine. Sterling and Grohe are the names we spec when a homeowner wants a step up in durability without going custom.
  • Exterior siding: Fiber-cement and engineered siding hold up against sun and rain far better than older wood products, and they cut repainting cycles.

What a New Detached ADU Costs in San Rafael, CA

Detached ADU construction in San Rafael runs $90,000 to $220,000. A modest studio on a flat, ready lot sits near the bottom. A 900-plus-square-foot two-bedroom with upgraded finishes and hillside foundation work lands near the top. A written estimate covers design support, engineering, permit fees, foundation through finishes, and utility tie-ins. It does not cover landscape redesign beyond the immediate site, major retaining-wall engineering, or utility upgrades the city requires at the street.

Five things move the number most: square footage (each added 100 square feet is roughly $15,000 to $25,000), site condition (slope, drainage, old retaining walls), utility runs (the farther the new unit from the main panel and water line, the more trenching and upgrade cost), material grade (fixtures, roofing, windows), and permit and engineering scope (coastal-zone or hillside review adds time and fees). We quote upfront pricing with no change orders for the agreed scope, and 0% financing for 18 months is available, plus $1,000 off projects over $10,000.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What San Rafael Homes Specifically Do to the Job

San Rafael is the county seat, and much of the housing here – the West End and downtown grid, Gerard, Dominican, and the Canal district – predates the 1970s. That matters for a detached ADU in two ways. First, the main house often has knob-and-tube or early wiring, galvanized or cast-iron plumbing, and a foundation that’s never been seismically retrofitted; pulling a clean utility run to a new unit sometimes means addressing the service on the main house too. Second, permitting is layered here. City review plus coastal-zone and older-overlay scrutiny makes additions slower and more documentation-heavy than in a neighboring inland town, so we budget real time for plan check. Up in the hillside neighborhoods above downtown and Dominican, lots are built into steep grade behind older retaining walls and cribbing, so we routinely find drainage and slope-stability issues that need engineering input, and winter rain concentrates runoff there in a way flat-lot jobs never see. We cover all four ZIPs (94913, 94903, 94915, 94901) and the wider San Rafael area.

Serving San Rafael, CA – Our Local Coverage Area

We serve San Rafael and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked – New Detached ADU in San Rafael

Get a Free On-Site Estimate for Your Detached ADU

Ready to put a real number on a new detached ADU in San Rafael? Call (866) 320-2646 and a live person answers around the clock. We’ll set a free on-site visit, walk your lot, talk through size and site constraints, and hand you a written line-item estimate with upfront pricing. Many homeowners pair this with Kitchen Design & Layout in San Rafael or Backsplash, Tile & Flooring in San Rafael once the unit is framed.

Written by the team at Groundwork Construction Co.

Why San Rafael Chooses Groundwork Construction Co. of San Francisco

We set the standard for new detached ADU in San Rafael.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in San Rafael

Getting your new detached ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your new detached ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local new detached ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What San Rafael Customers Say

Trusted by homeowners across San Rafael and surrounding areas.

★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong
★★★★★

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

Robert Sullivan

Ready for New Detached ADU in San Rafael?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in San Rafael.

(866) 320-2646

Request a Free Estimate in San Rafael

Tell us about your new detached ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Us
Local Service Coverage
Call Now - 24/7 Dispatch