Tub-to-Shower Conversion in Tiburon, CA: What It Costs and How Long It Takes
A tub-to-shower conversion in Tiburon runs $3,500 – $10,000 and typically takes 3 to 5 working days from demo to final caulk, assuming the drain stays where it is. The job means pulling the old tub and its surround, reworking the drain connection to a shower pan or curbless base, waterproofing the walls, setting new tile or a solid-surface system, and swapping the valve and trim, then passing inspection. Call (866) 320-2646 for a free on-site estimate on your Tiburon bathroom.
How the Work Actually Runs, Stage by Stage
Most conversions here move in five stages. Each one has a decision attached, and knowing when you’ll need to make it keeps the schedule honest.
Stage 1: Site check and demolition (Day 1)
We protect the routes and flooring first, because on the steep streets above downtown Tiburon and around Belvedere, everything comes in and out by hand or through a tight stairwell. Demo of the tub, surround, and any old backer board takes most of a day. You confirm the shower footprint and door swing before the first hammer swings.
Stage 2: Rough plumbing and framing (Day 1 – 2)
The drain gets reworked to hit the new pan, the valve gets replaced, and any rotted framing behind the walls gets cut out and replaced. If the old tub sat in a framed alcove, we build the curb and set the rough-in height. You pick the valve trim and showerhead now, since the rough-in sets the finish depth.
Stage 3: Waterproofing and inspection (Day 2 – 3)
A bonded waterproof membrane or a foam board system goes on the walls and pan, with seams taped and corners sealed. This is the stage that fails on cheap jobs, so it gets its own step. We schedule the rough inspection before any tile is set.
Stage 4: Tile and finish (Day 3 – 4)
Wall tile, grout, and any accent detail go in. Large-format panels move faster than mosaic and cut down on grout lines. You confirm grout color and any trim or niche placement before setting begins.
Stage 5: Glass, trim, and punch list (Day 4 – 5)
Shower door, fixtures, caulk, and a full water test to check slope and drainage. We walk the finished shower with you and correct anything on the punch list before we leave.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices That Shape Your Shower
Most of the money and long-term happiness in a tub-to-shower conversion comes from a handful of decisions. Here’s the honest trade-off on each.
- Tile vs. solid-surface panels. Ceramic and porcelain tile runs wider on labor but gives you any look you want and holds up for decades. Acrylic or solid-surface wall panels cost less installed and go up fast, but they scratch and look dated sooner. For a rental or a fast flip, panels make sense; for a home you’ll keep, tile wins.
- Shower door glass. Frameless tempered glass is the premium look and the easiest to clean. Semi-frameless saves a few hundred dollars; a framed slider costs least but traps soap scum in the tracks. Mr-Glass makes custom panels sized to your opening when a standard door won’t fit.
- Linear drain vs. center drain. A linear drain lets you set a single large-format floor tile with fewer cuts and gives a cleaner look. It costs more in plumbing and pan work. A center drain is the budget path if the existing drain location cooperates.
- Curb vs. curbless. A curbless entry is safer and looks better, but it means dropping the floor framing or building up the surrounding floor, which adds labor. A low curb keeps the cost down and still steps in easily.
- Valve and trim brand. Kohler and similar lines give you parts availability years down the road; off-brand valves can be a headache when a cartridge fails. You’re buying access to replacement parts as much as the finish.
Tub-to-Shower Conversion Costs in Tiburon, CA
The lead range for a full tub-to-shower conversion in Tiburon is $3,500 – $10,000, and where you land depends on the four or five variables below, not on finish color.
| Scope | Typical range |
|---|---|
| Basic conversion, existing drain, panel walls | $3,500 – $5,500 |
| Mid-grade tile, new valve, framed glass door | $5,500 – $7,500 |
| Tile with linear drain, frameless glass, niche | $7,500 – $10,000 |
What pushes a job to the high end: relocating the drain (adds plumbing and pan rework), rot or failed framing behind the old tub (common in older hillside homes), a curbless floor, large-format or mosaic tile that slows setting, and any added electrical for a fan or lighting. What keeps it low: keeping the drain exactly where it is, choosing a panel system over tile, and not touching the surrounding walls or floor.
A written estimate should list demo, plumbing rough-in, waterproofing, tile or panel material, glass, fixtures, permit, and haul-away as separate line items. It typically does not include hidden rot found after demo (we price that before we touch it) or changes you request mid-job.
See the difference
Before
After
Before
After
Before
AfterWhat Tiburon Homes Specifically Do to This Job
Tiburon’s housing stock is the reason this conversion isn’t a cookie-cutter job. Many homes near downtown are early-1900s shingle and stucco cottages where the original tub sat in a tight alcove with a cast-iron drain that’s rusted into the floor. Pulling that tub sometimes reveals rot in the subfloor and wall framing, since the fog belt keeps moisture cycling on south- and west-facing walls. Hillside homes with cantilevered decks bring a second reality: staging a conversion means carrying materials up narrow stairs or through tight entries, and the salt air off Richardson Bay has already corroded some of the fasteners and trim. We plan the demo and material drop around parking and access before we price the tile, and we check for HOA rules on door style or glass before the glass is ordered. If the wider project grows into a full Bathroom Remodeling in Tiburon, the same access planning carries through.
Serving Tiburon, CA – Our Local Coverage Area
We serve Tiburon and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked: Tub-to-Shower Conversion in Tiburon
A standard conversion takes 3 to 5 working days once materials are on site, with demo on day one and the final walkthrough at the end. Jobs that relocate the drain or uncover rot can stretch to 7 to 10 days. Call (866) 320-2646 for a schedule on your specific bathroom.
Yes. Replacing a tub with a shower involves plumbing and waterproofing changes that require a permit and inspection in Tiburon. We pull the permit and schedule the inspection, so you don’t handle the paperwork.
In most cases, yes. If the existing drain can serve the new shower pan and the alcove framing is sound, the conversion stays within the existing footprint. We confirm that during the site check before any commitment.
The full range is $3,500 – $10,000, with most standard jobs landing in the $5,500 – $7,500 band. Drain relocation, tile upgrades, and frameless glass push the number toward the top. Call (866) 320-2646 for an exact quote; estimates are free.
Every conversion we do is covered by our 730-Day Done Right Promise: if it’s not done right, we make it right. That covers workmanship for two full years, longer than most contractors offer.
Get Your Free Tiburon Conversion Estimate
Call (866) 320-2646 to schedule a free on-site estimate for your tub-to-shower conversion in Tiburon. We’ll walk the bathroom, check the drain and framing, and hand you a written line-item quote with the permit and warranty spelled out. If you’re planning a wider update, our Bathroom Remodeling service covers the full scope, and we also handle Metal Roofing in Tiburon and Tile Roofing in Tiburon for homeowners pairing exterior work with the interior. We serve the whole Tiburon peninsula and the surrounding hills.
Written by the team at Groundwork Construction Co.