ADU Site Prep & Utilities in Corte Madera, CA: What It Costs and What It Involves
Site prep and utilities for a detached ADU in Corte Madera typically runs $45,000 – $130,000 for the ground-up, infrastructure-only scope, before the structure itself goes up. That covers excavation, grading, foundation work, and running water, sewer, gas, and electrical from the main house to the new unit. Most Corte Madera jobs take six to twelve weeks from first dig to final inspection, and the timeline is driven by how deep the sewer line runs and how much rock the excavator hits. Call (866) 320-2646 to schedule a free on-site estimate.
How We Sequence Site Prep & Utilities for an ADU in Corte Madera
We don’t hand you a number and disappear. Each stage below has a decision point where you sign off before the next crew mobilizes. That’s how a project this size stays predictable.
Stage 1 – Site walk, utility locate, and soil check (week 1)
We pull the utility maps, call 811 to mark gas and electric, and take test pits to see what’s under the yard. Corte Madera lots near the creek often have high groundwater, which changes how we handle the foundation. You’ll decide here whether you want the ADU slab-on-grade or on a raised stem wall, and whether the building pad sits where we planned or shifts a few feet to save a mature tree.
Stage 2 – Demolition, clearing, and grading (weeks 2 – 3)
We remove existing concrete, old patios, and any structures in the footprint. Grading brings the pad to the right elevation and directs stormwater away from both the ADU and the main house. On slopes, this is where retaining walls get built, and we don’t skip the compacted fill testing that inspectors come back to look at. You’ll sign off on the drainage plan before we cover anything.
Stage 3 – Utility trenching and underground rough-in (weeks 3 – 5)
Trenches go in for water, sewer, gas, and electrical conduit. We set the sewer on grade so it flows correctly, which is where a lot of DIY ADU projects fail inspection. Electrical conduit gets sized for the full load, including EV charging and a heat-pump system if that’s the plan. This is where you pick your utility capacity – a full electric kitchen versus a gas one, for example – and that decision has to hold.
Stage 4 – Foundation and slab (weeks 5 – 8)
Footings, rebar, and the concrete pour. We coordinate the first inspection before the pour and a second one on the foundation after. This stage has no give in it – concrete cures on its own schedule and the inspector has to sign off before we frame. The schedule range above is where that lands for most Corte Madera jobs.
Stage 5 – Backfill, final utility connections, and inspection sign-off (weeks 8 – 10)
We tie the ADU utilities into the main house service, backfill the trenches, and restore the yard to its original grade. Final inspection covers all the underground work before you cover it up. Once the inspector signs, the site is ready for the ADU structure itself.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices That Actually Change the Number
Site prep and utilities isn’t one product – you’re picking between trade-offs. Here’s where the money moves:
- Slab-on-grade versus raised foundation: Slab is cheaper and lower maintenance, but it can’t do flood elevation. On a Corte Madera lot in the creek flats, a raised stem wall or pier-and-beam is often the only way to satisfy the flood requirement. That adds cost but satisfies the elevation certificate.
- Sewer connections: Gravity flow is cheapest. If your ADU sits lower than the main house’s sewer line, you’ll need a lift station or grinder pump, which adds cost plus ongoing maintenance. On hillside lots the opposite is true – gravity works in your favor.
- Electrical service: A 100-amp subpanel is usually the budget-friendly choice for a small ADU; 200-amp runs higher and only makes sense if the unit is all-electric or you’re planning additions later. Ground-mounted panels beat trenching a full run if the main panel is already full.
- Water and gas: A new dedicated water line from the meter is cleaner and avoids pressure problems. Gas lines depend on whether you’re going gas or all-electric; all-electric ADUs skip the gas line entirely and that’s a real saving.
- Drainage and stormwater: Dry wells, French drains, or a swale. Creekside lots need real stormwater management, not a token gravel bed.
- Concrete versus gravel access: If heavy equipment needs a path across the yard, a temporary gravel access road costs less but has to be torn out. Permanent concrete access costs more but doubles as a driveway.
What ADU Site Prep & Utilities Costs in Corte Madera, CA
The lead range for this scope is $45,000 – $130,000. That’s the infrastructure only – the ADU structure, design, and finishes are separate and typically run $90,000 – $220,000 per the ADU construction range.
| Line item | Typical range |
|---|---|
| Excavation, grading, and haul-away | $8,000 – $25,000 |
| Foundation (slab or raised) | $12,000 – $40,000 |
| Water and sewer tie-ins | $6,000 – $20,000 |
| Electrical service and conduit | $5,000 – $18,000 |
| Gas line (if applicable) | $1,500 – $5,000 |
| Drainage and stormwater | $3,000 – $15,000 |
| Retaining walls (hillside lots) | $8,000 – $30,000 |
The five variables that push a job to the high end: high groundwater requiring dewatering, rock requiring extra excavation time, a lift station for sewer, a retaining wall on a slope, and flood-elevation engineering on creek-flat lots. A written line-item estimate from us comes with fixed pricing and no change orders – the number you sign is the number you pay. It includes permits and inspections. It excludes site design (that’s the ADU design phase), major tree removal, and any grading that turns up unexpected rock.
See the difference
Before
After
Before
After
Before
AfterWhat Corte Madera Homes Specifically Do to This Job
This is a town split by a flood line. If your lot is in the low-lying flats near Corte Madera Creek and the Town Center, you’re working against FEMA flood-zone elevation requirements that dictate how high the ADU foundation sits above the base flood elevation, and that pulls in a drainage plan, grading, and often a retaining wall just to hold the pad. That’s a different job than the same scope would be a few blocks up the hill. On the hillside lots above town, site prep is retaining walls and slope-stability engineering, and we routinely see erosion problems from the heavy winter rains that hammer the marine-influenced climate here. The housing stock is mostly mid-century ranchers and split-levels from the 1950s – 70s, many now being gut-renovated or rebuilt, so the utility service on the main house is often original and undersized for an ADU. We also see more frequent foundation work and structural upgrades because that era of framing is at the end of its service life. Coverage across Corte Madera (ZIP 94925 and 94976) and the surrounding areas is part of our Corte Madera service.
Serving Corte Madera, CA – Our Local Coverage Area
We serve Corte Madera and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – ADU Site Prep & Utilities in Corte Madera
Most jobs run six to twelve weeks from first excavation to final inspection, with the biggest variable being whether we hit rock or high groundwater during trenching. Sites on hillside lots with retaining walls push toward the higher end. Call (866) 320-2646 for an exact timeline on your lot – estimates are free.
Yes. Site prep and utility work on an ADU is permitted and inspected, especially on flood-zone lots where elevation, drainage, and foundation design all require sign-off. We pull the permits and manage the inspections as part of the estimate. Call (866) 320-2646 to talk through the permit scope for your address.
Usually yes, but it depends on where the ADU sits relative to the main service. If the new unit is close to the main panel and water meter, we can often tie into existing stubs with minimal disruption. If the ADU is on the far side of the lot or uphill, we’re running new lines, which is why we locate everything on day one. Call (866) 320-2646 and we’ll walk your yard.
The infrastructure-only scope runs $45,000 – $130,000, with excavation, foundation, and utility tie-ins as the largest line items. Flood-zone elevation requirements and hillside retaining walls are the two biggest reasons a job lands at the high end. Call (866) 320-2646 for a written line-item estimate – free and no obligation.
All site prep and utility work is covered by our 730-Day Done Right Promise – if it’s not done right, we make it right, for two full years after handoff. Our technicians have up to 12 years of experience and are background-checked and uniformed on every job. Call (866) 320-2646 to schedule your free on-site estimate.
If the project extends beyond the infrastructure, our Home Additions & ADU service covers the full construction scope. Owners here often pair this groundwork with an Small & Partial Kitchen Remodels in Corte Madera for the main house, or a Full Bathroom Remodeling in Corte Madera. Either way, this site prep is one piece of a bigger build – Home Additions & ADU in Corte Madera lays out the full picture.
Get a Free Estimate for ADU Site Prep & Utilities in Corte Madera
Call (866) 320-2646 and we’ll schedule a free on-site estimate. On the call, we’ll confirm your address, ask about the ADU footprint and service panel, and set a time to walk the lot. You’ll get a written, line-item estimate with fixed pricing and no change orders, plus a clear permit and inspection plan. No hype, no voicemail – a live person answers around the clock.