Kitchen remodeling
Bathroom remodeling
Home additions & ADU
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Junior ADU & Interior Conversion in San Bruno: What It Costs and How Long It Takes
A junior ADU is a small interior unit, usually 250 to 500 square feet, carved out of existing living space and built to California’s junior accessory dwelling unit rules. In San Bruno, a finished junior ADU & interior conversion typically runs $45,000 to $130,000, and most projects take four to seven months from design sign-off to final inspection. The wide range comes down to how much plumbing, wiring and structure has to move. Call (866) 320-2646 and we’ll walk your specific space and give you a real number.
How the Job Actually Runs, Stage by Stage
Interior conversion work is decided in stages, and the order matters. Here’s what happens, when, and what you’ll be choosing along the way.
Stage 1: Feasibility and scope (week 1 to 2)
We walk the space with you and measure ceiling height, doorway clearances, and where the electrical panel and water heater sit. You’ll decide which rooms get absorbed into the unit and whether a kitchenette and full bath fit without moving a load-bearing wall. On San Bruno homes built in the 1940s and 1950s, we also check the foundation and framing condition here, because that discovery changes the budget before design, not after.
Stage 2: Design and permitting (week 3 to 10)
Drawings get drafted to junior ADU standards: a minimum 150 square feet of living space, an efficiency kitchen, and a separate entrance where the layout allows. Plans go to the City of San Bruno for plan check, and because a large share of Crestmoor-area homes carry retrofit history, the plan reviewer will want to see how the new unit ties into the existing structural and gas systems. You’ll decide finish grades during this window, since cabinet and fixture lead times drive the schedule later.
Stage 3: Demo and rough-in (week 11 to 15)
Interior walls come out, and framing goes in for the new bath and kitchenette. Rough plumbing, electrical and mechanical inspections happen here, one trade at a time, and each needs a sign-off before it gets covered. This is the stage where a relocated drain or a panel upgrade shifts the cost the most. You’ll approve any change order in writing before we close a wall.
Stage 4: Insulation, drywall and finishes (week 16 to 24)
Insulation, drywall, tape and texture move fast, usually two to three weeks. Then tile, flooring, cabinetry, countertops and paint. A junior ADU kitchenette is small enough that a well-chosen cabinet line like Wellborn keeps the profile tight without looking like a hotel minibar. You’ll make the countertop and fixture selections before this stage opens, not during it.
Stage 5: Punch list and final inspection (week 25 to 30)
We walk the unit with you, list what’s not right, and fix it before the city’s final inspection. That’s also when we hand over the warranty paperwork. Most of our interior conversion customers say the punch list is where they expected a fight and didn’t get one, which is the whole point of a 730-Day Done Right Promise.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices That Decide What Your Conversion Looks Like
A junior ADU is small, so each finish decision shows more than it would in a big house. Here’s what you’re actually picking between.
- Efficiency kitchen vs. full kitchen: State rules allow a compact kitchenette with a sink, a small fridge and a cooking appliance. A full range and dishwasher push the price toward the high end and need more electrical capacity.
- Bath configuration: A 36-inch walk-in shower is the most space-efficient and the easiest to make accessible. A tub costs less on materials but eats floor area you may want for storage.
- Structural approach: Keeping the existing walls and door openings is the cheapest path. Adding a new exterior entry door or moving a bearing wall adds framing and engineering, and that’s where budgets jump.
- Flooring: Luxury vinyl plank holds up to moisture and renter traffic at a lower price. Tile in the bath is worth the extra spend; hardwood in a junior unit rarely is.
- Exterior cladding and trim, where the unit touches outside: James Hardie fiber cement holds paint and resists the damp far better than wood trim in this climate. We use it on any wall the conversion opens up.
- Countertops: A quartz remnant, including Cambria options, often costs less than a full slab and looks finished. Laminate saves more but shows wear faster.
What a Junior ADU & Interior Conversion Costs in San Bruno, CA
Plan on $45,000 to $130,000 for the conversion itself in San Bruno. That range is broad on purpose, because four variables do most of the moving:
- Size: A 250-square-foot studio sits near the bottom. A 450 to 500-square-foot one-bedroom with a full bath and kitchen pushes toward the top.
- Existing condition: Older San Bruno homes that still need foundation bolting or shear walling get those corrections added, since the city won’t sign off a habitable unit on a soft-story foundation.
- Plumbing and electrical relocation: Keeping the new bath near existing drain stacks saves thousands. Moving the panel or trenching for a new line is the single biggest line-item swing.
- Finish grade: Builder-grade cabinets and LVP versus semi-custom cabinetry and quartz runs a $15,000 to $25,000 difference on a unit this size.
- Permit scope: A straightforward interior conversion permit is one fee schedule. Anything that triggers structural, gas line or separate-entrance review adds plan check rounds and time.
A written estimate from us lists demo, framing, rough trades, insulation, drywall, finishes, fixtures and permit fees line by line, so you can see what you’re paying for. It does not include furniture, appliances you buy yourself, or landscaping. Upfront pricing means the number you see is the number you pay, and any change order gets your written approval first. Calls are answered by a live person around the clock at (866) 320-2646.
See the difference
Before
After
Before
After
Before
AfterWhat San Bruno Homes Specifically Do to This Job
San Bruno’s construction market still carries the mark of the 2010 PG&E pipeline explosion in Crestmoor. The rebuilding and mandatory seismic retrofit wave that followed reshaped how this city permits and inspects interior work. In Crestmoor and the streets around it, you’ll find rebuilt homes sitting beside 1940s and 1950s originals that still need foundation bolting and chimney bracing, and the plan reviewer treats a new habitable unit as the moment to require those corrections. Working near the former blast zone also means gas line clearance procedures before any digging, which matters if your conversion needs a new exterior utility run. Add the fog belt: cool, damp summers and steady onshore wind off the Pacific rot exterior sheathing and trim faster here than inland, so any wall the conversion opens gets proper flashing and weather-resistant detailing. For the wider scope of a full Home Additions & ADU in San Bruno, that structural history is the first thing we check.
Serving San Bruno, CA – Our Local Coverage Area
We serve San Bruno and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked: Junior ADU & Interior Conversion in San Bruno
Most take four to seven months from design sign-off to final inspection. Permitting alone runs six to ten weeks with the City of San Bruno, and construction takes another three to four months depending on how much plumbing and electrical moves. Call (866) 320-2646 for a schedule built around your specific space.
Yes. A junior ADU is a habitable dwelling unit, so it needs building, electrical, plumbing and mechanical permits, plus a final inspection before anyone lives in it. We pull the permits and manage the inspections as part of the job. Call (866) 320-2646 to talk through what your property will require.
Often, yes, and that’s the cheapest version of this job. If an existing bathroom sits close to the new unit and the walls stay put, you avoid the two biggest cost drivers. We’ll tell you honestly at the feasibility walk whether your layout allows it. Call (866) 320-2646 to book that walk.
Between $45,000 and $130,000, with most projects landing in the middle of that band. Size, foundation condition, utility relocation and finish grade move the number. Call (866) 320-2646 for an exact quote; estimates are free.
Every conversion is covered by our 730-Day Done Right Promise: if it’s not done right, we make it right. That covers workmanship for two full years, and it’s in writing before we start. Call (866) 320-2646 with questions about coverage.
Get a Free Estimate for Your San Bruno Conversion
If you’re weighing a junior ADU & interior conversion in San Bruno, start with a free on-site estimate. We’ll measure the space, check the foundation and panel, and tell you what’s realistic before you spend a dollar on drawings. Call (866) 320-2646 to schedule; a live person answers any hour. Many homeowners pair this with Kitchen Design & Layout in San Bruno or a Small & Partial Kitchen Remodel in San Bruno, and we’re glad to scope both at once. You can see the full range of what we build through our Home Additions & ADU service, and check our coverage on the San Bruno page.
Written by the team at Groundwork Construction Co.