Kitchen remodeling
Bathroom remodeling
Home additions & ADU
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Cabinets & Countertops in Tiburon, CA: What to Expect
New Cabinets & Countertops in Tiburon usually run $14,000 – $45,000 for a full kitchen’s worth, and most projects land between three and five weeks from demo to final caulk. Cabinet installation alone runs $4,000 – $13,000, countertop installation $2,000 – $6,500, and a new island $3,000 – $10,000. The wild card here isn’t the finish. It’s getting the boxes and slabs up a hillside driveway. Call (866) 320-2646 and we’ll walk your access before we quote a number.
How we run a cabinet and countertop job, step by step
Every project follows the same sequence. The durations below are what we typically see on Tiburon jobs, not a best case.
Stage 1: Site visit and access plan (day 1, 1 – 2 hours)
We measure the room, confirm square and level of the existing walls, and walk the route your cabinets and slabs will travel. On steep lots this is the most important hour of the whole job. You decide cabinet layout and door style now, because the order goes in after this visit.
Stage 2: Ordering and lead time (2 – 5 weeks, no work on site)
Cabinets ship in 2 – 4 weeks for stock lines and 4 – 8 weeks for semi-custom. Slabs get reserved at the stone yard. You’ll finalize countertop material, edge profile, and sink cutout during this window. This is when we confirm whether the old counter gets templated for reuse or gets replaced outright.
Stage 3: Demo and prep (1 – 3 days)
Old cabinets and counters come out, the walls get checked for rot and out-of-plumb, and any electrical or plumbing rough-in that’s moving gets done now, before anything new goes in. We shim and scribe the walls to accept the new boxes. If the fridge or range is relocating, the rough-in adds a day.
Stage 4: Cabinet install and slab template (2 – 3 days, plus 3 – 7 days at the fabricator)
Base and wall cabinets go in, get leveled and fastened, and the countertop fabricator templates the finished cabinet run. You don’t decide anything here unless a wall turns out to be out of square enough to need a filler.
Stage 5: Countertop set, plumbing, and punch list (1 – 2 days)
Slabs are set, the sink and faucet get connected, and the final walkthrough happens. That’s the whole job. The cabinets and counters are one trade group, but the slab waits on the boxes, which is why the sequencing above matters more than raw speed.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The options you’ll actually choose between
- Cabinet box material: plywood boxes hold up better in Marin’s moisture cycling than particleboard, cost more, and are worth it on a waterfront or hillside kitchen. You’ll pick door style and finish separately.
- Stock vs semi-custom cabinets: stock lines save money and ship fast, semi-custom gets you odd widths and taller uppers for the same footprint. KraftMaid is the semi-custom line we lean on most.
- Quartz vs granite vs butcher block: quartz is the low-maintenance default and holds a consistent look, granite handles heat better and varies slab to slab, butcher block is the warmest option and the one that needs the most care.
- Slab thickness and edge: 2cm and 3cm slabs both work, and the edge profile is a finish decision more than a structural one. It changes the look and the price, not the durability.
- Hardware and pulls: soft-close hinges and drawer slides are worth specifying up front. Retrofitting them later means pulling drawers.
What Cabinets & Countertops costs in Tiburon, CA
The lead range for a full kitchen’s cabinets and counters is $14,000 – $45,000. Here’s how the line items break out:
| Line item | Typical range |
|---|---|
| Cabinet installation | $4,000 – $13,000 |
| Countertop installation | $2,000 – $6,500 |
| Kitchen island | $3,000 – $10,000 |
| Small or partial kitchen scope | $9,000 – $20,000 |
Five things push a job toward the high end. Room size and cabinet count come first. Then existing condition: out-of-plumb walls and rotted framing from years of moisture cost money to correct before cabinets go in. Relocating plumbing, gas, or electrical adds a rough-in stage. Material grade moves the number more than any labor line, since a semi-custom line with quartz can double a stock-and-laminate quote. And access logistics on a steep Tiburon lot can add staging and labor hours that a flat-lot job never sees. Our written estimate itemizes cabinets, counters, demo, rough-in, and install separately, so you can see which line is driving the total. The pricing is fixed. The number on the estimate is the number you pay.
See the difference
Before
After
Before
After
Before
AfterWhat Tiburon homes specifically do to this job
Tiburon is a steep-hillside peninsula town, and that shapes a cabinet and countertop project before the first box arrives. On the tight streets above downtown and around Belvedere, a dumpster or delivery truck often can’t reach the door. Cabinets get walked in piece by piece. A stone slab can’t be walked in at all, so we plan a crane pick or a pump-truck setup before we price the install. That access reality is what separates a Tiburon job from the same scope in flatter Corte Madera or Mill Valley. The housing stock runs from early-1900s shingle and stucco cottages near downtown to mid-century and contemporary hillside homes with cantilevered decks, so wall squareness and framing condition vary wildly from house to house. Salt air off Richardson Bay and the fog belt’s constant moisture cycling also take a toll: fasteners and metal hardware corrode, and years of damp show up as rot behind old cabinet runs once they come out. We cover the whole of Tiburon, ZIP 94920, and plan the access question into every quote. If the wider project includes layout changes or a full gut, that work sometimes lives under a broader scope, so it helps to look at Kitchen Remodeling in Tiburon before we lock the cabinet order.
Serving Tiburon, CA – Our Local Coverage Area
We serve Tiburon and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked: Cabinets & Countertops in Tiburon
Plan on three to five weeks from demo to final walkthrough, with most of that being order lead time rather than on-site work. The install itself usually takes four to seven working days once materials land. Call (866) 320-2646 to get a schedule against your actual order date.
Like-for-like cabinet and countertop replacement usually doesn’t require a permit, but relocating plumbing, gas, or electrical does. On a Tiburon hillside job, anything that touches framing or structure also triggers inspection. We confirm the permit scope on the site visit and pull what’s needed.
Yes, and most Tiburon jobs we run keep the sink and range in place. Staying in the existing footprint cuts the schedule by a week or more and keeps the cost at the lower half of the range. Moving a sink or range adds rough-in time and a permit.
The range is $14,000 – $45,000 for a full kitchen, with cabinet installation at $4,000 – $13,000 and countertops at $2,000 – $6,500. Access logistics on a steep lot and material grade are the two biggest movers. Call (866) 320-2646 for a free estimate with line-item pricing.
Every cabinet and countertop project is covered by our 730-Day Done Right Promise. If something isn’t right, we make it right, and that’s in writing. Our technicians have up to 12 years of experience, and the promise outlasts the install by a wide margin. Homeowners often pair this with Walk-In Showers & Shower Remodeling in Tiburon or a Tub-to-Shower Conversion in Tiburon when the whole house is getting refreshed at once.
Get a free estimate on your Tiburon cabinets and counters
Call (866) 320-2646 and a live person answers, day or night. We’ll set a site visit, walk your access route, and put cabinet, countertop, demo, and rough-in pricing in writing before you commit to an order. No pressure on the call. Just a clear scope and a fixed number. Cabinet and countertop work also fits neatly inside our Kitchen Remodeling service when you’re ready to plan the rest of the room.
Written by the team at Groundwork Construction Co.