Home additions & ADU
Kitchen remodeling
Bathroom remodeling
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Chain Link Fence in Tamalpais-Homestead Valley: What It Takes and What It Costs
A chain link fence in Tamalpais-Homestead Valley typically runs $3,500 to $9,000, depending on linear footage, terrain, and whether the line has to be cut into a slope. Most residential jobs here finish in three to five working days once materials are on site. Call (866) 320-2646 for a free on-site estimate. On the steep, wooded lots this valley is known for, the fence itself is the easy part; the ground it goes into is what decides the schedule and the price.
How a Chain Link Fence Goes In, Start to Finish
Every job follows the same sequence. What changes is how much time each stage eats on a hillside lot with redwoods, roots, and a grade that won’t hold a string line the way flat ground does.
Stage 1: Walk the line and pin the layout (day 1, 2 – 3 hours)
We walk the property with you and mark every corner, gate post, and terminal point with stakes and flagging. You decide the gate widths and swing direction now, not later, because a gate decision made after posts are set means digging them out again. On a layout that crosses a retaining wall or a drainage swale, we flag those crossings too.
Stage 2: Call for utility locates and check setbacks (day 1 – 2, waiting on locates)
Underground service locates get called in before anything gets dug, and in Marin County that turnaround is usually two to three business days. We also confirm the property line and any setback before we set a single post, since an unincorporated parcel’s line can sit somewhere other than where the last fence suggested.
Stage 3: Demo and prep (day 2, 4 – 8 hours)
Old wire, posts, and concrete footings come out first. On shaded north-facing lots, posts that have sat in damp soil for twenty years often come up rotted at the base, and the concrete collars can be twice the size you’d expect. We clear the line, cut back roots that would heave a post, and grade the trench so the fabric sits a couple of inches off the dirt.
Stage 4: Set posts and stretch fabric (days 3 – 4, one to three days)
Line posts go in at 8- to 10-foot spacing, terminal posts get braced against the pull, and footings get poured and set. Then the fabric goes up, gets stretched tight with a come-along, and ties off to the top rail and line posts. On a slope, we step the fence in panels so it follows the grade without gaps underneath.
Stage 5: Gates, tension checks, and walkthrough (day 5, half day)
Gate frames get hung, hinges adjusted, and the latch checked a dozen times before we call it done. Then we walk the whole line with you, check tension by hand at every terminal, and hand over the paperwork. You decide the finish (vinyl-coated or galvanized) back at stage 2, so it’s on site when we need it.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Chain Link Options You’ll Actually Choose Between
Chain link is not one product. Four decisions drive most of the cost and the look of the finished fence.
- Galvanized vs. vinyl-coated fabric: Bare galvanized is the cheapest and lasts decades, but it reads industrial. Vinyl-coated (usually in black or green) costs roughly 15 – 25% more and blends into the redwoods far better. On the shaded slopes here, black-coated wire also hides the algae film that galvanized picks up in damp canyons.
- Gauge of wire: An 11.5-gauge fabric is the residential standard; 9-gauge is noticeably heavier and worth it if kids, dogs, or deer are leaning on it. The heavier gauge adds cost but resists the sag that lighter wire develops after a few wet winters.
- Post and rail schedule: 1 5/8″ line posts with a top rail is standard. Going to 2 3/8″ or 2 1/2″ posts and adding a bottom tension wire matters on longer runs and windy ridge lines.
- Height: 4 feet is the common residential height; 6 feet is the deer-and-privacy choice. Every extra two feet adds fabric, taller posts, and more concrete per footing.
- Gate type: A walk gate and a drive gate are different animals. Drive gates need heavier frames and often a cantilever or double-swing design so they don’t sag.
We keep the material list to brands we trust to hold up, the same way we do on window and door work with names like Therma-Tru and ViewLux. If you’re pairing the fence with hardscape, homeowners often roll this into a bigger project – see our Fence Installation service for the full scope.
What a Chain Link Fence Costs in Tamalpais-Homestead Valley, CA
The honest number for most residential chain link here is $3,500 to $9,000. That range covers a typical 100- to 200-foot run with a gate or two. What pushes a job to the low or high end comes down to five things:
- Linear footage: The single biggest lever. More feet means more fabric, posts, and concrete.
- Terrain and slope: A flat line is fast. A fence cut into a steep grade, stepped panel by panel with extra bracing, adds labor and time.
- Old fence removal: Pulling a rotted, concrete-footed fence out of damp redwood soil is real work. Hauling it off adds a disposal charge.
- Material grade: Galvanized and 11.5-gauge sit at the low end; vinyl-coated, 9-gauge, and 6-foot height push toward the top.
- Gate count and type: Walk gates are modest; wide drive gates with heavy frames are a bigger line item.
A written estimate from us lists footage, post spacing, fabric gauge and finish, gate sizes, footing specs, removal, and disposal as separate line items, so you can see exactly where the money goes. The number you see is the number you pay; we don’t hand you a range and then surprise you with change orders. Permits, if the job needs one, and any utility locate fees get called out clearly. What isn’t included is usually landscaping repair after the line is cut, or a survey if the property line is genuinely in question. Homeowners often pair a new fence with a refreshed approach – our Concrete Driveways & Concrete Work in Tamalpais-Homestead Valley or Asphalt Driveways & Resurfacing in Tamalpais-Homestead Valley work lines up well with a fence project.
See the difference
Before
After
Before
After
Before
AfterWhat Tamalpais-Homestead Valley Homes Specifically Do to This Job
This is unincorporated Marin County, not a city, and that changes the paperwork. Permits run through County of Marin, and for most residential chain link the job is exempt, but anything near a slope, a drainage course, or a wildland-urban interface setback can pull in a review you weren’t expecting. The narrow, winding private lanes that thread the valley also matter: a materials truck has to get to the property, and on the tighter stretches that means a smaller delivery or staging at the road. We plan the delivery around the access, not the other way around.
The housing stock shapes the work too. Mid-century redwood-and-glass homes and 1950s-70s post-and-beam houses sit on steep, wooded parcels, and under the coast redwoods on the north-facing slopes the ground stays damp and shaded. Posts rot faster there than on the sunny side of the valley, and that’s exactly where we find them. Moss, poor drainage, and the occasional retaining wall the fence has to cross are routine. When a line runs along a deck or foundation edge, moisture and slope stability become the real constraint, which is why we walk the grade before we quote. We cover all of Tamalpais-Homestead Valley and the surrounding hills, and if the fence is part of a larger yard or access rebuild, it’s worth looking at Fence Installation in Tamalpais-Homestead Valley for the wider picture.
Serving Tamalpais-Homestead Valley, CA – Our Local Coverage Area
We serve Tamalpais-Homestead Valley and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Chain Link Fence in Tamalpais-Homestead Valley
Most residential jobs finish in three to five working days once materials are on site, with a day or two of waiting on utility locates before that. Steep or heavily wooded lots can stretch it, since every stepped panel takes longer to brace and set. Call (866) 320-2646 for a firm timeline once we’ve seen the property.
Most residential chain link fence in Tamalpais-Homestead Valley does not require a permit, but County of Marin review can kick in near slopes, drainage courses, or wildland-interface setbacks. We check the specifics for your parcel before we start and pull anything that’s needed, inspections included. Call us to walk through your property’s situation.
Yes. Chain link installs with line posts set at 8- to 10-foot spacing, so the disturbance is limited to the post footings and the fabric line – no trenching, no major grading. On a hillside we step the fence to follow the grade, which keeps the ground intact. Call (866) 320-2646 and we’ll flag anything unusual on your lot.
Expect $3,500 to $9,000 for a typical residential run with a gate or two; the exact number depends on footage, terrain, material grade, and how much old fence has to come out. Vinyl-coated and heavier-gauge fabric sit toward the top. Call (866) 320-2646 for a free on-site estimate with line-item pricing.
Every chain link fence we install is covered by our 730-Day Done Right Promise – if it’s not done right, we make it right. That’s one of the longest workmanship guarantees in the residential construction space. Call (866) 320-2646 to book an estimate and see the guarantee in writing.
Get a Free Chain Link Fence Estimate in Tamalpais-Homestead Valley
Every project starts with a free on-site estimate. We walk your line, check the grade and access, and hand you a written, line-item quote with no surprises. A live person answers the phone around the clock, so call (866) 320-2646 whenever it’s convenient – we’ll get the estimate on the calendar and talk through what your property needs.
Written by the team at Groundwork Construction Co.