A Groundwork company - serving San Francisco, CA
ADU Site Prep & Utilities in Tamalpais-Homestead Valley, CA | Groundwork Construction Co. of San Francisco

ADU Site Prep & Utilities in Tamalpais-Homestead Valley - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Home additions & ADUHome additions & ADU
Kitchen remodelingKitchen remodeling
Bathroom remodelingBathroom remodeling
RoofingRoofing
Windows & doorsWindows & doors
Driveway & paversDriveway & pavers
FenceFence
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

ADU Site Prep & Utilities in Tamalpais-Homestead Valley: What It Really Takes

ADU Site Prep & Utilities in Tamalpais-Homestead Valley typically runs $45,000 – $130,000 and takes 6 – 14 weeks from first excavation to final utility tie-in, depending on slope, access, and how far the new unit sits from the street. This phase covers what has to be true before a foundation can be poured: grading, drainage, trenching for water, sewer, gas, and electrical, and the inspections that go with each. On these hillside lots, it’s often the hardest part of the project. Call (866) 320-2646 and we’ll walk your lot and quote it in writing.

Call (866) 320-2646

How site prep and utility work actually runs, stage by stage

The sequence below is what we follow on Tamalpais-Homestead Valley hillside properties. Your specific timeline will vary with slope and access, but the order rarely changes.

Stage 1: Site walk, survey, and utility locate (days 1 – 5)

Before anyone puts a shovel in the ground, we walk the lot with you, review the survey, and call for utility locates. On these wooded slopes we’re checking for old drainage lines, buried irrigation, and the redwood root zones that will limit where you can trench. You’ll decide at this stage where the ADU footprint sits and whether it stays within the existing building envelope or pushes into the slope.

Stage 2: Access, clearing, and erosion control (week 1 – 2)

Narrow, winding private lanes in the valley often limit truck and equipment access, so we plan staging before day one. Clearing is minimal here because most of the work is under canopy. We install silt fencing and erosion controls before any grading, which the County of Marin expects to see in place when the inspector arrives. You’ll sign off on the erosion-control plan and any tree protection measures.

Stage 3: Grading, excavation, and drainage (weeks 2 – 5)

This is the heavy lift on a steep lot. Cut-and-fill, retaining walls where the grade demands it, and a footing or pier system suited to the slope. Deep redwood-shaded ground holds moisture, so perimeter drainage and a French drain system get installed now, not later. You’ll decide wall materials (concrete, treated timber, or segmental block) and how runoff routes to daylight.

Stage 4: Trenching and utility runs (weeks 4 – 8)

Water, sewer, gas, and electrical trenches are dug to grade, with the fall calculated for the sewer line and conduit sized for the electrical load. Distances matter here. A unit 150 feet off the street costs considerably more in trenching and conduit than one near the curb. You’ll choose the electrical service size and whether to run gas at all or go all-electric.

Stage 5: Connections, inspections, and backfill (weeks 8 – 14)

We tie into the main service and sewer, coordinate the utility company connections, and walk the inspector through each trade. Backfill and final grade finish the job. You’ll get the inspection record and a written sign-off on the 730-Day Done Right Promise before we hand the site to the foundation crew.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The options you’ll be choosing between

  • Foundation type: A slab-on-grade is the simplest and cheapest where the grade allows; a pier-and-grade-beam system costs more but handles slope and reduces excavation on a hillside lot. On the steepest parcels, piers are usually the honest answer.
  • Retaining walls: Concrete is permanent and expensive; segmental block is faster and more affordable but can shift over time on wet ground; treated timber is the cheapest and the shortest-lived in this damp climate.
  • Utility trench depth: Deeper is better in a wet canyon. Shallow runs cost less up front and cause headaches when a heavy rain season finds them.
  • Electrical service: A 100-amp service suits a compact ADU; 200-amp leaves room for future load. Going all-electric avoids a gas run entirely.
  • Drainage: French drains, French drains plus a dry well, or a full surface system routed to daylight. You’ll want at least one of these here.
  • Window and door packages: For the ADU itself, ECO Window Systems and Therma-Tru doors are options worth pricing early so the utility openings match the frame.

These are honest trade-offs, not upsells. We’ll tell you which one fits your slope and your budget.

What ADU Site Prep & Utilities costs in Tamalpais-Homestead Valley, CA

Expect $45,000 – $130,000 for this phase alone. That’s the utility and site work, not the ADU structure itself. Here’s what moves the number:

  • Slope and excavation: Flat lots sit near the low end; steep cut-and-fill with retaining walls push toward the high end.
  • Distance to utility mains: Every extra foot of trench, pipe, and conduit adds cost. A 200-foot run is a different job than a 60-foot one.
  • Drainage and erosion control: Mandatory on these lots, and it’s not optional if you want a clean final inspection.
  • Access: If a truck can’t get close, everything moves by hand or by conveyor, and that costs more.
  • Electrical service size and gas: 200-amp service and a gas run both add to the bottom line.

A written line-item estimate from us includes excavation, drainage, trenching, conduit, inspections, and backfill. It typically does not include the ADU structure, finish work, or major retaining wall engineering beyond the drainage scope. Upfront pricing means the number you see is the number you pay.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Tamalpais-Homestead Valley homes specifically do to this job

This is an unincorporated Marin County community, so permits come from the County, not a city hall, and that shapes the schedule. The valley also sits in the wildland-urban interface, so fire-hardening requirements on vents, roofing, and siding come into play even at the site-prep stage. Homes here are a dense mix of mid-century redwood-and-glass hillside houses and 1950s – 70s post-and-beam structures, many with existing decks, retaining walls, and additions. We routinely find old drainage that was never daylighted and footings that have quietly absorbed decades of moisture. The north-facing slopes under the redwoods stay damp and shaded, which surfaces rot and poor drainage the sunny side of the valley never sees. That’s why our site-prep crews plan drainage first and grading second. If the ADU is part of a full Home Additions & ADU in Tamalpais-Homestead Valley, we sequence the two together so the foundation crew isn’t waiting on a trench.

Serving Tamalpais-Homestead Valley, CA – Our Local Coverage Area

We serve Tamalpais-Homestead Valley and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently asked: ADU Site Prep & Utilities in Tamalpais-Homestead Valley

Get a free on-site estimate

We’ll walk your Tamalpais-Homestead Valley lot, check the slope, the drainage, and the utility paths, and hand you a written line-item estimate at no cost. No pressure, no vague numbers. Call (866) 320-2646 and a live person picks up, any hour. We also handle Home Additions & ADU projects across Tamalpais-Homestead Valley, and homeowners often pair this scope with Small & Partial Kitchen Remodels in Tamalpais-Homestead Valley or Full Bathroom Remodeling in Tamalpais-Homestead Valley once the ADU is closed in.

Written by the team at Groundwork Construction Co.

Why Tamalpais-Homestead Valley Chooses Groundwork Construction Co. of San Francisco

We set the standard for ADU site prep & utilities in Tamalpais-Homestead Valley.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Tamalpais-Homestead Valley

Getting your ADU site prep & utilities project started is simple.

1

Call or Request a Free Estimate

Tell us about your ADU site prep & utilities project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local ADU site prep & utilities pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Tamalpais-Homestead Valley Customers Say

Trusted by homeowners across Tamalpais-Homestead Valley and surrounding areas.

★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong
★★★★★

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

Robert Sullivan

Ready for ADU Site Prep & Utilities in Tamalpais-Homestead Valley?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Tamalpais-Homestead Valley.

(866) 320-2646

Request a Free Estimate in Tamalpais-Homestead Valley

Tell us about your ADU site prep & utilities needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Us
Local Service Coverage
Call Now - 24/7 Dispatch