Kitchen remodeling
Bathroom remodeling
Home additions & ADU
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Cabinets & Countertops in Half Moon Bay, CA: What the Job Actually Costs
Cabinets & countertops in Half Moon Bay run $14,000 – $45,000 for a full kitchen cabinet and counter replacement, with cabinet work alone at $4,000 – $13,000 and counters at $2,000 – $6,500. A typical job takes two to four weeks of working time from demo to final caulk, plus lead time on the cabinet order. Call (866) 320-2646 and we’ll put a line-item number on your kitchen instead of a lump-sum guess.
How a Cabinet and Counter Job Runs, Stage by Stage
Most contractors hand you a bid and disappear until demo day. We walk through five stages, and you have a decision to make at each one.
1. Measure and layout (day 1, about 90 minutes on site)
We measure every wall, check for out-of-square corners and floor level, and photograph the plumbing and electrical locations under the old cabinets. Older Half Moon Bay homes rarely have square walls, and that matters: a wall that’s 3/4 inch out of plumb along a 10-foot run changes how the fillers and crown get cut. You decide the layout at this stage: keep the sink and range where they are, or move them.
2. Order and pre-construction (2 to 6 weeks, depending on the cabinet line)
Stock cabinet lines ship in roughly two weeks. Semi-custom runs closer to four to six. The counter template can’t happen until the cabinets are set, so the counter lead time stacks on top. You’ll pick door style, finish, box construction and drawer hardware now, not later, because changes after the order ships cost real money.
3. Demo and prep (1 to 2 days)
Out come the old cabinets, counters and usually the backsplash, since it rarely survives the counter removal. We shut off and cap the water, pull the old disposal if it’s being replaced, and inspect what’s behind the wall: water staining, old galvanized supply lines, or wiring that isn’t up to current code. On the coast, we also look for soft drywall at the sink wall, which is common where a slow leak has been running behind a cabinet for a while.
4. Cabinet install (2 to 4 days)
We shim and level the base cabinets, scribe fillers to the walls, set uppers and crown, then hang doors and drawers. If the floor is out of level, we build that into the base line so the counter sits flat. This is also when the sink base gets cut for the new plumbing, which is the moment to confirm you’re keeping the same sink footprint.
5. Template, counter install and closeout (7 to 14 days, mostly waiting on fabrication)
Stone counters get templated after the cabinets are set, typically a day or two after install finishes, then fabricated and installed a week to ten days later. Laminate or butcher block can go in faster. After the counter is set comes the sink and faucet hookup, the dishwasher reconnection, and the final walkthrough. We leave you a written punch list and don’t call the job done until it’s clear.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices You’ll Actually Make
- Cabinet box construction: plywood boxes hold screws and resist moisture far better than particleboard, and in a coastal kitchen that difference shows up in five years, not twenty. Expect to pay more for it.
- Door style and finish: painted MDF doors look crisp and cost less, but they chip at the corners. Wood and thermofoil hold up differently. Painted finishes are the most common pick in Half Moon Bay kitchens we see.
- Stock vs. semi-custom: stock gets you a fast, cheaper install if your layout is standard. Semi-custom buys you odd widths, taller uppers and a better fit in a house with out-of-square walls.
- Counter material: quartz is the default for durability and low maintenance. Natural stone (granite, marble) looks richer but stains and needs sealing. Laminate is the budget option and reasonable for a rental or a flip. Butcher block is warm and cheap but wants oiling.
- Sink and faucet: an undermount sink needs a solid counter material to support it. A drop-in sink works with laminate. Faucet finishes with PVD coatings hold up better against coastal humidity than bare polished chrome.
- Drawer and door hardware: soft-close undermount slides are worth the upgrade. Cheap side-mount slides fail first in a damp kitchen.
What Cabinets & Countertops Cost in Half Moon Bay, CA
The full cabinet and counter package here lands between $14,000 and $45,000. Here’s how the number breaks down.
| Line item | Typical range |
|---|---|
| Cabinet installation | $4,000 – $13,000 |
| Countertop installation | $2,000 – $6,500 |
| Backsplash (if you’re replacing it) | $800 – $2,500 |
| Island, if you’re adding one | $3,000 – $10,000 |
Five things push a Half Moon Bay job toward the top of that range. Kitchen size and cabinet count come first; a galley is not a U-shape. Next is existing condition: water damage behind the sink wall, out-of-level floors, or old wiring that has to be brought up to code. Third, relocating the sink or range means new plumbing and possibly a new circuit, which adds real cost. Fourth, material grade: a stock cabinet line with laminate counters sits near the bottom, semi-custom with quartz near the top. Fifth, permit scope, which we cover below.
A written estimate from us lists cabinets, counters, demo, disposal, install labor, and any repair work separately. It does not include appliances, unless you ask us to source them, and it doesn’t include structural changes discovered behind a wall. We tell you that up front rather than surprising you mid-job.
See the difference
Before
After
Before
After
Before
AfterWhy Half Moon Bay Kitchens Cost What They Do
Half Moon Bay sits inside the coastal fog belt, and the salt-laden marine air changes what’s behind your cabinet doors. We regularly find corroded hinges, rusted drawer slides and swollen particleboard cabinet boxes in homes along the coast, especially in older ranch houses near Ocean Colony and Alsace Lorraine. The constant damp keeps the sink wall wet longer than it would inland, so slow leaks do more damage before anyone notices.
The other factor is permits. Half Moon Bay is inside a coastal zoning overlay with flood and fire hazard review, and even a modest cabinet and counter replacement can trigger plan review if the layout changes or plumbing moves. We pull the permits and schedule the inspections. Our technicians have up to 12 years of experience, and they know what a coastal inspector wants to see: correct venting, proper moisture barriers, and hardware rated for the environment.
Housing stock matters too. The 1960s – 70s tract and ranch homes here often have original cabinets with odd dimensions, which means stock lines need filler panels and careful scribing. Newer custom builds are easier to fit but sometimes have been remodeled once already, and you have to work around a previous owner’s choices.
Serving Half Moon Bay, CA – Our Local Coverage Area
We serve Half Moon Bay and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Cabinets & Countertops in Half Moon Bay
Plan on two to four weeks of working time, plus cabinet order lead time of two to six weeks before that. Stone counter fabrication adds another seven to ten days after the cabinets are set. Call (866) 320-2646 for a timeline built around your specific cabinet line.
Straight replacement of cabinets and counters in the same layout usually doesn’t need a permit, but moving plumbing, electrical, or a load-bearing wall does, and coastal zoning can add review time. We pull the permits and pass the inspections where required.
Yes, and keeping the sink and range where they are is the cheapest path. Same-footprint swaps avoid new supply lines, drain relocation and electrical work, and they typically cut the job cost by thousands.
Rarely. Stone counters are templated and fabricated to the specific cabinet base beneath them, and pulling the cabinets almost always cracks or breaks the counter during removal. If you want new cabinets, budget for new counters too.
Our labor and workmanship are covered by the 730-Day Done Right Promise: if it isn’t done right, we make it right. The cabinet and counter manufacturers carry their own product warranties, and we’ll walk you through both in writing before you sign.
Get a Free Cabinet and Counter Estimate in Half Moon Bay
Call (866) 320-2646 to schedule a free on-site estimate for cabinets & countertops in Half Moon Bay. A live person answers, day or night. We’ll measure your kitchen, talk through cabinet and counter options, and hand you a written, line-item price with no surprises. If the job is part of a larger project, we can scope the rest too. Estimates are free, and there’s no pressure to book on the call.
Written by the team at Groundwork Construction Co.