A Groundwork company - serving San Francisco, CA
ADU Site Prep & Utilities in San Bruno, CA | Groundwork Construction Co. of San Francisco

ADU Site Prep & Utilities in San Bruno - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Kitchen remodelingKitchen remodeling
Bathroom remodelingBathroom remodeling
Home additions & ADUHome additions & ADU
RoofingRoofing
Windows & doorsWindows & doors
Driveway & paversDriveway & pavers
FenceFence
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

ADU Site Prep & Utilities in San Bruno, CA: What It Actually Takes

Site prep and utilities for an ADU in San Bruno typically runs $45,000 – $130,000 for the site work alone, and the digging phase usually takes 3 – 6 weeks from first cut to backfill. That number covers excavation, grading and drainage, the utility trenching and connections, and the foundation work that has to pass city inspection before anything gets framed. Call (866) 320-2646 and we’ll walk your lot and give you a written, line-item number.

Call (866) 320-2646

How the Work Moves, Stage by Stage

Site prep on an ADU isn’t one job, it’s a sequence, and each stage has to clear before the next one opens. Here’s how it runs in practice.

Stage 1: Locate and mark (1 – 3 days). Before a single shovel hits dirt, we call in utility locating and pull the survey. On lots near the Crestmoor area, gas line clearance matters more than most people expect, so we confirm the gas main and service runs and plan the footprint around them. You decide the final ADU position on the lot at this stage, because moving it later means re-engineering the trenching.

Stage 2: Demo and clear (2 – 5 days). Old concrete patios, sheds, fences, and landscaping come out. We haul it. This is also when we check for any undocumented buried lines from earlier remodels, which show up often on 1940s-50s homes that have been added onto over the years.

Stage 3: Excavation and grading (5 – 10 days). The pad gets cut and graded to slope away from both the ADU and the main house. Drainage is the quiet failure point on the Peninsula fog belt, so we build it in now rather than patch it later.

Stage 4: Utilities (7 – 14 days). Water, sewer, gas, and electrical trench in from the main or the street, whichever the plan calls for. Each one gets its own inspection. You decide the meter setup here, whether the ADU is sub-metered or shares the house service.

Stage 5: Foundation and inspection (10 – 20 days). Forms, rebar, pour, cure. The city inspection on the foundation and underground utilities has to pass before framing begins. If you’re building the ADU as part of a full Home Additions & ADU in San Bruno scope, this is the handoff point between the site crew and the build crew.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Choices That Shape the Job

  • Attached vs. detached utilities: Tying into the main house service is cheaper and shorter but can run a sub-metering problem if you plan to rent the ADU. A separate service drop costs more upfront and adds inspection time.
  • Trench depth and protection: Deeper trenching with rigid conduit holds up better under the marine drizzle and wind-driven moisture than shallower runs, at a higher dig cost. Worth it on a lot that stays damp.
  • Drainage system: A simple French drain versus a full infiltration system. One suits a flat lot, the other a sloped one. Get this wrong and you’re re-grading in two winters.
  • Foundation type: Slab-on-grade is the most common and the most economical. A raised or pier foundation costs more but handles the slope on some San Bruno lots better.
  • Exterior materials and glazing: We work with brands like Therma-Tru for entry systems and ECO Window Systems for windows on the finished structure, both of which pair well with the weather detailing this climate demands.

What ADU Site Prep & Utilities Costs in San Bruno, CA

Plan on $45,000 – $130,000 for the site and utility scope, before the ADU structure itself. That range is wide because a flat lot with easy utility access sits near the bottom and a sloped lot with long trench runs and gas clearance work sits at the top.

The variables that push the number:

  • Lot condition: Flat and cleared versus sloped, rocky, or packed with old hardscape.
  • Utility distance: How far the ADU sits from the street and the meter. Every extra foot of trench adds labor and material.
  • Existing infrastructure: New service drops and panel upgrades add cost; tie-ins to adequate existing service don’t.
  • Gas line clearance: On lots near the Crestmoor blast zone, PG&E clearance procedures can delay and lengthen the dig, which shows up in the schedule and the price.
  • Permit and inspection scope: A plan that needs multiple phased inspections takes longer than a single-pass foundation sign-off.

Your written estimate should itemize excavation, grading, each utility run, the foundation, and inspection coordination. It shouldn’t include the ADU structure itself, the finishes, or the interior build-out, those belong to the construction scope. Ask for the breakdown in writing so nothing gets added mid-job.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What San Bruno Homes Specifically Do to This Job

The 2010 PG&E gas pipeline explosion in Crestmoor reshaped how site work gets permitted here. The rebuilding wave that followed put seismic retrofit requirements and stricter utility clearance checks into the local permit process, so a dig in San Bruno isn’t the same paperwork as a dig two towns over. On lots in and around Crestmoor, our crews plan gas clearance into the schedule from day one rather than discovering it mid-excavation. The housing stock adds its own wrinkle: many of these are 1940s-50s single-family homes, some rebuilt, some retrofitted, some still carrying original unbolted foundations. That mix means we survey existing conditions before we ever set a trench, because a line we can’t see is a line we can’t route around. The fog belt and steady onshore wind off the Pacific also push us toward weather-resistant detailing on the ADU exterior and drainage that moves water away instead of letting it pool. Homes in the 94066 zip often need this level of care, and homeowners frequently pair the site work with a Small & Partial Kitchen Remodels in San Bruno to ready the main house at the same time. If you want to see how we handle the whole scope, our Home Additions & ADU service covers it, and you can check the broader San Bruno service area to confirm we work your street.

Serving San Bruno, CA – Our Local Coverage Area

We serve San Bruno and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked – ADU Site Prep & Utilities in San Bruno

Get a Free Estimate for Your ADU Site Prep & Utilities

If you’re planning an ADU and want a real number before you commit, call (866) 320-2646 to schedule a free on-site estimate in San Bruno. We’ll look at the lot, check the utility runs and gas clearance, and hand you a written, line-item quote with upfront pricing and no surprises. A live person answers around the clock. And when the ADU scope expands, homeowners often pair this with Full Bathroom Remodeling in San Bruno on the main house.

Written by the team at Groundwork Construction Co. of San Francisco.

Why San Bruno Chooses Groundwork Construction Co. of San Francisco

We set the standard for ADU site prep & utilities in San Bruno.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in San Bruno

Getting your ADU site prep & utilities project started is simple.

1

Call or Request a Free Estimate

Tell us about your ADU site prep & utilities project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local ADU site prep & utilities pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What San Bruno Customers Say

Trusted by homeowners across San Bruno and surrounding areas.

★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong
★★★★★

"He pulled the permits himself, scheduled every sub and ran the inspections. I made one decision a week and otherwise stayed out of it, which is exactly what I was paying for."

Robert Sullivan

Ready for ADU Site Prep & Utilities in San Bruno?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in San Bruno.

(866) 320-2646

Request a Free Estimate in San Bruno

Tell us about your ADU site prep & utilities needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Us
Local Service Coverage
Call Now - 24/7 Dispatch