Kitchen remodeling
Bathroom remodeling
Home additions & ADU
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Walk-In Showers & Shower Remodeling in Novato, CA: What It Involves and What It Costs
Walk-In Showers & Shower Remodeling in Novato typically runs $9,000 – $28,000 for a full bathroom rebuild, or $4,500 – $12,000 for a standalone walk-in shower install, and most jobs finish in two to four weeks once materials are on site. The work covers demolition, waterproofing, valve and drain work, tile or panel walls, a curbless or low-curb base, and glass.
How our Walk-In Showers & Shower Remodeling process runs, stage by stage
Every job follows the same sequence. What changes is how much of the original plumbing and framing we find once the walls come down, which is why we price after demo, not before.
- 1
On-site assessment and written scope (day 1, about 90 minutes). We measure the wet area, check the subfloor and drain slope, and confirm what’s behind the tile. You decide the footprint (curbless vs. low curb), the wall finish, and the glass configuration. You get a line-item quote with the number you’ll pay, not a ballpark.
- 2
Demo and inspection (days 2 – 3). We strip tile, backer board, and the old pan, then look at the framing and the drain. If this is Hamilton-era housing, we often find the original valve and a floor that’s been patched more than once. You approve any structural finding before we move forward.
- 3
Rough-in and waterproofing (days 4 – 6). New valve, drain, and supply lines go in, then a bonded waterproof membrane and a sloped mud bed. This is the part that decides whether the shower lasts fifteen years or leaks in three. We flood-test and let it cure before a single tile goes up.
- 4
Tile, glass template, and finish (days 7 – 12). Wall tile and floor tile set, niche and bench trimmed, then glass measured for a custom fit. Frameless glass adds about a week to the lead time. You pick grout, trim, and fixture finish before this stage, not during.
- 5
Final walkthrough (day 13 – 16, timing varies). Glass install, sealant, fixture trim, and a run test on the drain and valve. We walk you through what we did and hand over the 730-Day Done Right Promise in writing.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The options you’ll choose between for a walk-in shower
Most of the decisions on this job come down to five things. Here’s the honest trade-off on each:
- Tile vs. solid-surface panels. Porcelain or ceramic tile gives you any look you want and holds up for decades, but it takes more labor and a skilled setter, so it pushes the job toward the high end. Acrylic and solid-surface panels cost less and clean up faster, but they show scratches and read more utilitarian.
- Curbless vs. low-curb base. Curbless is the accessible option and looks cleaner, but it needs the floor recessed or a linear drain, which adds framing and waterproofing cost. A low-curb pan is simpler and cheaper, and it suits a standard 36×60 alcove.
- Frameless vs. framed glass. Frameless gives an open feel and is what most buyers picture, but it’s a custom template and a bigger line item. A semi-frameless door keeps more of the budget in the wall finish.
- Valve and fixture grade. A name-brand thermostatic valve from a line like Kohler holds temperature and lasts; a builder-grade single-handle unit is cheaper up front and more likely to fail first. On a job this size, the valve is not where to save.
- Waterproofing system. A bonded membrane over a sloped bed is the standard we build to. A pre-formed foam pan is faster to install and works well in a tight renovation, but it depends on a perfectly level subfloor.
What Walk-In Showers & Shower Remodeling costs in Novato, CA
Expect $9,000 – $28,000 for a full shower-inclusive bathroom remodel in Novato, or $4,500 – $12,000 for a walk-in shower installed on its own. A straight swap of an old shower for a new one, keeping the footprint, lands around $3,000 – $8,500.
Five variables move that number:
- Size and footprint. A 36×60 alcove is the cheapest to build. A large curbless double shower with a bench and niche can double the labor and glass.
- Condition behind the wall. Rotted framing, a failed pan, or a floor that needs releveling all add days and dollars.
- Relocating plumbing or electrical. Moving the drain, adding a second showerhead, or running new lighting adds real cost because it means opening more wall and often a permit revision.
- Material grade. Large-format porcelain and a custom frameless door sit at the top. Standard tile and a semi-frameless door sit at the bottom.
- Permit scope. A tile-only refresh may not need one; new plumbing or structural work does, and that adds plan review time and inspection scheduling to the calendar.
Your written estimate covers demo, waterproofing, tile, valve and drain, glass, and cleanup. It typically does not cover structural repairs found after demo, unexpected mold or rot, or upgraded fixtures you add mid-job. Those show up as a change order you approve in writing first.
See the difference
Before
After
Before
After
Before
AfterWhat Novato homes specifically do to this job
Novato has a housing stock you won’t find elsewhere in Marin, and it changes how a shower remodel is priced. At the former Hamilton Army Airfield, the 1940s-50s military duplexes are being gutted and rebuilt now, and their original plumbing is decades past service. We regularly open a wall on a Hamilton unit and find a drain that was patched twice and a subfloor that’s been wet for years, which turns a shower swap into a full pan and framing rebuild.
The Petaluma Gap wind corridor matters too. Water intrusion at roof and vent penetrations shows up on the ceilings and walls above showers, and we fix the source before we tile a ceiling that will just stain again. On the wildland-urban interface edges toward the hills, we keep an eye on fire-hardening details when a remodel touches the envelope. If your shower work turns out to need roof repair at the same time, our team handles Roof Replacement & Installation in Novato and can fold it into the same project. Where we cover Novato, from the flats out to the hills, we pull the permits and schedule the inspections.
Serving Novato, CA – Our Local Coverage Area
We serve Novato and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked: Walk-In Showers & Shower Remodeling in Novato
Most walk-in shower remodels take two to four weeks from demo to final glass, depending on material lead times and permit review. Custom frameless glass and special-order tile add the most time. Call (866) 320-2646 for a schedule based on your specific bathroom.
Yes, if the work touches plumbing, electrical, or structure, which most walk-in conversions do. Tile-only cosmetic work may not require one. We handle permits and inspections as part of the job and pass them before we close out.
Yes, in many cases the existing drain and valve can stay in place, which keeps the job simpler and cheaper. We confirm this during the on-site assessment before we quote.
Walk-in showers and shower remodeling in Novato run $9,000 – $28,000 for a full bathroom rebuild, or $4,500 – $12,000 for a standalone shower. Large curbless installs, imported tile, and frameless glass push the number toward the top. Call (866) 320-2646 for an exact quote; estimates are free.
Every project is covered by our 730-Day Done Right Promise: if it isn’t done right, we make it right. That covers workmanship, and it’s stated in writing before we start.
Get a free walk-in shower estimate in Novato
We’ll come out, measure the space, and hand you a written line-item quote with the number you’ll pay. Calls are answered by a live person, 24/7, and projects over $10,000 qualify for $1,000 off plus 0% financing for 18 months. Call (866) 320-2646 to schedule your free estimate.
Written by the team at Groundwork Construction Co.