Kitchen remodeling
Bathroom remodeling
Home additions & ADU
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Full Kitchen Remodeling in Pacifica: Scope, Timeline, and Cost
Full kitchen remodeling in Pacifica runs $14,000 to $45,000 and takes eight to twelve weeks of on-site work, with planning and permits adding another four to six weeks before demo begins. A full remodel means gutting the room to the studs and rebuilding it: new cabinets, counters, backsplash, flooring, lighting, plumbing fixtures, and usually new wiring and outlets to bring a 1950s or 1970s kitchen up to current code. That range covers a mid-grade rebuild of a typical Pacifica kitchen. Call (866) 320-2646 and we’ll put a real number on your room after we see it.
How a Full Kitchen Remodel Moves From Demo to Final Walkthrough
Every full kitchen tear-out follows a sequence. What changes between jobs is how much hidden work sits behind the walls. Here’s what you should expect.
Stage 1: Site protection and demolition (days 1 – 3)
We seal off the kitchen from the rest of the house with plastic sheeting and dust barriers, then demo cabinets, counters, and flooring. If any wall covering is coming out, that happens here too. You decide, before this day, whether you’re keeping the room’s footprint or moving walls, because the answer changes what gets torn out.
Stage 2: Rough-in work (roughly days 3 – 10)
With the room open, we run new electrical circuits, relocate or replace plumbing, install ventilation, and patch any rot we find. This is the stage that surprises people: a kitchen in a coastal Pacifica home often hides softened subfloor or a corroded shutoff valve behind the cabinets. You approve any change order before we continue, so the number in the bid doesn’t drift.
Stage 3: Inspection and drywall (about a week)
Framing, electrical, and plumbing get inspected before the walls close. Once the sign-off comes through, drywall goes up, gets taped, and gets finished. This is also your window to lock in the appliance delivery date, since the cabinet layout may depend on the fridge and range sizes.
Stage 4: Cabinets, counters, and finishes (days 15 – 45)
Cabinets go in first and get set plumb and level, then the countertop template is taken. Fabrication of quartz or granite typically takes one to two weeks after the template. Backsplash, flooring, and paint follow the counters. You’ll want to have tile, backsplash, and paint color picked before this stage starts.
Stage 5: Fixtures, punch, and walkthrough (final week)
Sinks, faucets, lighting, and appliances get installed the last few days. We do a punch walkthrough together, fix anything on your list, and hand the space back ready to use. Every job we finish is covered by the 730-Day Done Right Promise, so the workmanship is on the record for two full years.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices You’ll Make, and What Each One Costs You
A full kitchen remodel is really a string of decisions. Here are the forks that matter most.
- Cabinet grade: Stock cabinets save you money but limit sizes and finishes. Semi-custom or full-custom (KraftMaid is one we install) give you exact dimensions and a finish that aligns with the rest of the house. Budget $4,000 to $13,000 for cabinets alone in this market.
- Countertops: Quartz and granite run $2,000 to $6,500 installed. Quartz is non-porous and holds up better to a coastal climate; granite is a natural stone with unique variation but needs sealing. Cambria is a solid quartz option.
- Backsplash: $800 to $2,500. Full-height tile looks clean and wipes down easily, while a short splash behind the counters saves money.
- Layout changes: Keeping the sink, range, and fridge in place keeps cost lowest. Moving a sink or range means re-running drain lines and electrical, which pushes you toward the upper end of the price range.
- Island: A freestanding island runs $3,000 to $10,000. It adds usable prep space and a second work zone, but only if the room is wide enough to keep three feet of clearance around it.
What Full Kitchen Remodeling Costs in Pacifica, CA
The working range for a full kitchen remodel in Pacifica is $14,000 to $45,000. The bottom of that range fits a modest galley in a smaller home with stock cabinets keeping the same layout. The top fits a large room in a mid-century ranch with custom cabinets, stone counters, layout changes, new flooring, and an island. A small or partial remodel can land lower, but a true full gut-and-rebuild rarely factors below $14,000 here once permits and inspection are counted.
Four variables push the number most:
- Room size: More square footage means more cabinets, more counter, more flooring and more labor.
- Hidden conditions: Wet or rotted subfloor, old wiring, a failing shutoff, or a wall that needs framing adds real money to a job that started as a cosmetic remodel.
- Plumbing and electrical relocation: Moving a sink, adding an outlet bank, or running a new circuit for a range hood is a real line item, not a freebie.
- Material grade: Stock cabinets with laminate counters stay low; custom cabinets with quartz and a tile backsplash climb fast.
Our written estimates are line-item, and the number you see is the number you pay. What’s included: labor, most materials, permits, and inspection. What’s usually not: appliances, and any condition we can only see after demo, which we quote as a change order you approve first.
See the difference
Before
After
Before
After
Before
AfterWhat Pacifica Homes Do to a Full Kitchen Remodel
Pacifica sits in the coastal fog belt, and that reality is behind the walls of every kitchen we open up here. The salt-laden onshore wind and damp summertime air push moisture into west-facing walls, so a kitchen next to an exterior wall in a home near Linda Mar or Rockaway often reveals softened drywall or corroded fasteners once the cabinets come off. Many of the homes we work in are 1950s – 70s stucco-and-wood ranch houses and split-levels. Their kitchens were built with smaller footprints, minimal wiring, and single-glazed windows; a full remodel is usually where all of that gets addressed at once. Homes on the steep marine-terrace hillsides along the coast can also need coastal development permits or erosion-control measures before a project proceeds, so we pull permits and sequence inspections to match the site. Because Pacifica kitchen projects often also need window replacement to stop that moisture intrusion, some homeowners pair this with our Full Bathroom Remodeling in Pacifica work while the house is already torn up. We also handle a full kitchen remodel as part of a Kitchen Remodeling in Pacifica project or when a homeowner wants Walk-In Showers & Shower Remodeling in Pacifica done at the same time.
Serving Pacifica, CA – Our Local Coverage Area
We serve Pacifica and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked Questions About Full Kitchen Remodeling in Pacifica
Plan on eight to twelve weeks of construction, plus four to six weeks of design and permitting before the first hammer swing. The back half of the job – cabinet fabrication and countertop templating – dictates most of that timing because quartz and granite require a template visit and a two-week fabrication window. Call (866) 320-2646 to get a schedule specific to your kitchen.
Yes, most full kitchen remodels do, because any work that touches wiring, plumbing, or wall framing must be inspected. Pacifica’s coastal location means projects near the bluffs may also need coastal development or erosion-control review. We pull permits and pass inspections as part of the job, so it’s handled on our end.
Yes, keeping the sink, range, and refrigerator where they are is the single biggest cost saver in a full remodel. That approach typically lands the project in the lower half of the $14,000 to $45,000 range, especially with stock cabinets. Call (866) 320-2646 and we’ll price both options side by side.
Full kitchen remodeling in Pacifica runs $14,000 to $45,000, with the variance driven by room size, cabinets, counter material, layout changes, and any hidden damage found after demo. Every bid is a written line-item estimate, and the number you see is the number you pay. Call (866) 320-2646 for a free estimate.
Every job we complete is backed by our 730-Day Done Right Promise – if it’s not done right, we make it right for two full years. That covers workmanship on the install, not appliance manufacturer defects. Our technicians also have up to 12 years of experience on the tools. Call (866) 320-2646 to schedule your free estimate.
Get a Free Estimate for Your Pacifica Kitchen
We do free on-site estimates for full kitchen remodeling across Pacifica. Call (866) 320-2646 and a live person answers – we take calls around the clock, so no voicemail and no waiting until Monday. On the call we’ll set a time to walk your kitchen, talk through layout, cabinets, and counters, and then hand you a written line-item estimate. Upfront pricing, no surprises. Financing at 0% for 18 months and $1,000 off projects over $10,000 are available.
Written by the team at Groundwork Construction Co.