Tub-to-Shower Conversion in San Bruno: Scope, Timeline, and Cost
A tub-to-shower conversion in San Bruno typically takes 5 to 10 working days on site and runs $3,500 to $10,000 for the conversion itself. The job means removing the existing tub, prepping the alcove or wet area, waterproofing, setting a new shower base or pan, tiling, and fitting the valve, drain, and glass. Most San Bruno homes we open up include at least one surprise, which is why every quote starts with a free on-site estimate. Call (866) 320-2646 to book one.
How the Conversion Actually Runs, Day by Day
A conversion is a small job with a real sequence. Skipping a stage is what creates leaks two years later, so here’s exactly what happens and when you’ll be asked to make decisions.
Stage 1: Measure, verify, and finalize selections (before work starts)
We open the wall at the valve, confirm the drain location, check for water damage behind the tile, and verify whether the existing rough-in can stay or has to move. You’ll lock in tile, base type, fixture finish, and glass at this point. Allow two to three days for this stage, mostly ordering and delivery. Bear in mind that the supply lines and the drain assembly are the two items most likely to make or break a straightforward conversion.
Stage 2: Demo and haul-out (day 1)
The whole tub, surround, and any old tile comes out, along with the old valve trim and drain. That’s roughly 300 to 400 pounds of material, and it goes out the front door the same day, not into your side yard. If the framing behind the tub is soft or moldy, we photograph it and quote the repair immediately rather than later. In the fog-belt parts of San Bruno, that’s not a rare find.
Stage 3: Rough-in, framing, and inspection (days 2 to 3)
The drain gets set to the new pan height, the valve body is replaced or confirmed, and blocking for grab bars or a bench is added. If plumbing relocates, a city of San Bruno plumbing permit and inspection comes into play at this stage. We pull the permit, schedule the inspection, and are on site for it.
Stage 4: Waterproofing and tile (days 3 to 6)
Cement board or a foam backer system goes up, seams and corners are taped and sealed, and a liquid or sheet waterproof membrane is applied with the correct cure window (often 24 hours). Then come the base install, tiling, and grouting. Do not skip the membrane. Water behind tile is the leading cause of a shower failing at the ten-year mark.
Stage 5: Trim, glass, and final walk-through (days 6 to 10)
Fixture trim, showerhead, glass panels or door, and silicone sealing go in, then a full water test. You get a written walkthrough of what was done, where the shutoff is, and how to maintain the grout and sealant line.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Options You’ll Weigh and What They Really Cost
Most of a conversion’s cost is set by three choices: base material, wall finish, and glass. Here’s the honest trade-off on each.
- Acrylic or fiberglass pan and walls: The fastest and cheapest path, roughly $450 to $1,200 for the pan and walls. It’s warm underfoot and easy to clean. It also looks like a kit forever, and panels can crack at stress points over time. Best for a rental, an ADU bathroom, or a tight budget.
- Tiled mud-set or foam-pan shower (the common middle): A properly sloped pan under tile, roughly $1,500 to $3,500 for the base package before tile. It’s the most durable path and can be custom-sized to the alcove. It requires a disciplined installer; a bad slope drains poorly for decades.
- Tile wall finishes: Ceramic or porcelain runs $4 to $12 per square foot installed; large-format porcelain is faster to set and easier to clean; natural stone runs $12 to $30 per square foot and needs annual sealing in a humid San Bruno bathroom.
- Glass: A framed slider is the budget option at $600 to $1,200; a frameless fixed panel runs $1,000 to $2,500 and shows less soap scum, but it means a colder shower and more careful waterproofing around anchor points. Frosted glass adds privacy at a similar cost.
- Valve and fixtures: A standard pressure-balance valve is included in most quotes. Upgrading to a thermostatic valve or adding a handheld on a slide bar adds $150 to $500 and is worth it if the fixture is shared.
You’ll also be asked about grab bar blocking and a bench or niche. Blocking installed during framing costs $100 to $200; added later it’s a wall cut. Choose now, not after the tile goes up.
What Tub-to-Shower Conversion Costs in San Bruno, CA
A tub-to-shower conversion in San Bruno runs $3,500 to $10,000, with most homes falling in the $5,000 to $7,500 range. That is our line-item range, not an hourly estimate. Here’s what moves a job to the low end or the high end.
| Scope item | Typical San Bruno range |
|---|---|
| Basic conversion, existing drain and valve in good shape, acrylic pan and walls | $3,500 – $5,500 |
| Mid-grade tiled shower with new valve, standard glass | $5,500 – $7,800 |
| High-end tiled shower with bench, niche, frameless glass | $7,800 – $10,000 |
| Plumbing relocation to a new drain or valve location | +$600 – $1,800 |
| Hidden rot, mold, or subfloor repair | +$400 – $2,500 |
Five variables drive the number. Size: a standard 30-by-60 alcove is a straight swap; a larger or nonstandard opening adds framing and tile. Existing condition: rot behind the tub is the single biggest swing on a San Bruno conversion. Plumbing and electrical moves: a new drain location is where most of the surprise cost lives. Material grade: tile and glass choices can swing the job by $2,000. Permit scope: a plumbing permit adds cost; relocating a tub is not a permit-free cosmetic swap.
A written estimate from us lists demo, haul-away, rough plumbing, waterproofing, tile, fixtures, glass, and permit fees separately, plus a separate contingency line for hidden damage. It does not usually include structural changes to enlarge the space, moving a wall, or a vent fan if none exists. If you’re already planning those, that’s where the scope turns into a fuller Bathroom Remodeling in San Bruno, and it’s worth scoping the two together.
See the difference
Before
After
Before
After
Before
AfterWhat San Bruno Homes Specifically Do to This Job
San Bruno is not a blank slate for a shower conversion. The 2010 PG&E gas pipeline explosion in the Crestmoor neighborhood reshaped the local housing stock in a way that shows up on every job we open up. The rebuilding and seismic retrofit wave that followed left that neighborhood with a mix of code-climate homes built after 2010 and post-WWII single-family homes, many from the 1940s and 1950s, that were retrofitted rather than rebuilt. The older houses are where the surprises live: original cast-iron drains, undersized or galvanized supply lines, and sheathing that has spent decades absorbing the fog belt’s marine layer.
Read the permit history before you buy the tile. Post-2010 rebuilds in Crestmoor often have newer rough-in that’s straightforward to convert. The 1940s and 1950s homes near the neighborhood’s main streets tend to have 1.5-inch cast-iron tub drains that should be scoped before a new pan goes in, and we’ve opened walls on those homes to find rot that started at a tub flange and worked down the studs for years. That’s also why the city’s post-2010 retrofit requirements and PG&E gas line clearance procedures matter: a plumber moving a drain near the Crestmoor blast zone needs to know what’s underground before anyone digs. If you’re stacking exterior work at the same time, homeowners often pair a conversion with Metal Roofing in San Bruno or Tile Roofing in San Bruno to catch moisture problems at both ends of the house at once. We cover the full city, from Crestmoor to the flats near El Camino, and you can see the wider area on our San Bruno service page.
Serving San Bruno, CA – Our Local Coverage Area
We serve San Bruno and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Tub-to-Shower Conversion in San Bruno
Most conversions take 5 to 10 working days once materials are on site, and 2 to 3 weeks door-to-door when you count ordering and delivery. A basic acrylic kit can be done in 4 to 5 days; a custom tiled shower with glass runs closer to the 10-day mark. Call (866) 320-2646 for a schedule built around your timeline.
Yes in most cases, because plumbing and waterproofing are involved and the conversion isn’t a cosmetic swap. If the drain or valve relocates, the city issues a plumbing permit and inspects the rough-in. We pull the permit and meet the inspector on site so you don’t have to manage the schedule. Ask us to walk you through what triggers a permit on your specific layout.
Usually yes, and that’s the cleanest and cheapest path. The standard 30-by-60 tub alcove converts to a shower with the existing drain and valve in place, at the low end of our $3,500 to $10,000 range. Moving the drain or valve is where cost and permit complexity climb. Call (866) 320-2646 and we’ll tell you honestly which path your bathroom supports.
Plan on $3,500 to $10,000, with most San Bruno homes landing between $5,000 and $7,500. Acrylic kits sit at the bottom, tiled showers with a new valve and frameless glass at the top, and hidden rot or a relocated drain pushes the number up. Call (866) 320-2646 for a free on-site estimate with a written line-item quote.
Our work is backed by the 730-Day Done Right Promise: if a leak, failed slope, or workmanship defect shows up, we come back and make it right. That’s a two-year workmanship guarantee in writing, not a handshake. We’ll spell out exactly what it covers at your estimate.
Get a Free Estimate for Your Conversion
If the tub in your San Bruno bathroom has become the reason nobody uses that room, we’ll come out, measure the alcove, open the wall at the valve, and give you a written line-item quote at no cost. No vague range, no surprise change orders. Call (866) 320-2646 and we’ll book a time that works, walk you through what your layout can handle, and answer every question before you spend a dollar. It’s part of our Bathroom Remodeling service, and the estimate is free.
Written by the team at Groundwork Construction Co.